Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

All-Way Stop Control on Road 126 & Avenue 419, in Orosi

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Tulare County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

All-Way Stop Control on Road 126 & Avenue 419 Environmental Assessment

PDFenvironmental-assessment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Tulare County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Tulare County
Office AddressN/A
Contacts
Jessica WillsEnvironmental Planner
Johnny WongChief Engineer

Full Description

Show more
This project will enhance vehicular circulation, traffic and pedestrian safety at the intersection of Road 126 and Avenue 419. The project will consist of converting a Two-Way Stop to an All-Way Stop controlled intersection by adding STOP signs on Road 126, north and south of Avenue 419 in the unincorporated community of Orosi, CA. This intersection is currently controlled with Stops for east and westbound traffic only. In response to concerns regarding traffic and pedestrian safety due to increased traffic volumes, the Tulare County Resource Management Agency (RMA) conducted an investigation. To improve the vehicular circulation, traffic and pedestrian safety at this location, the Traffic Operations Division determined that this intersection meets the requirements of Section 2B.07 Multi-Way Stop Applications of the California Manual on Uniform Traffic Control Devices (CA MUTCD), and is consistent with the California Vehicle Code (CVC), Section 22450(c), which states in part that “a local authority may adopt rules and regulations by ordinance or resolution providing for the placement of a stop sign at any location on a highway under its jurisdiction where the stop sign would enhance traffic safety”.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 7 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS