Almaden Calero Canal Emergency Maintenance

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

San Jose, CA, 95120

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clara Valley Water District
Contacts1 person available
OfficeN/A

Full Description

Show more
In anticipation of an unprecedented El Nino winter weather season Valley Water is planning emergency maintenance of Almaden Calero Canal. Valley Water would mechanically remove an estimated 676 CY of excess sediment, in-channel vegetation, and organic debris from 3,650 linear feet of Almaden Calero Canal (stations 114+00 to 150+50) using an excavator and dump truck stationed on the adjacent canal maintenance road. The work area would have an average width of 40 feet (the average width of the canal and adjacent maintenance road). The excavated material would be temporarily stockpiled at the Calero Valve Lot and tested prior to being hauled to an appropriate disposal facility. All work and disturbance would occur within the existing footprints of the Almaden Calero Canal and adjacent canal maintenance road.

More opportunities from California → Santa Clara Valley Water District

Same awarding agency

NAICS: 237990
SLED
Tularcitos Creek Downstream North Hillview Drive Levee RepairThe Tularcitos Creek Downstream North Hillview Drive Levee Repair Project, managed by the Santa Clara Valley Water District, focuses on repairing approximately 2,932 linear feet of the west bank levee in Milpitas, California. The project aims to address erosion and damage caused by rodent burrowing to protect public safety and property. Reconstruction will utilize SMP-2 Method 1A, which involves installing a buried rock buttress to stabilize the channel embankment and provide a stable foundation over saturated soils. The scope of work includes dewatering, the installation and removal of two temporary access ramps, and bank stabilization, with a total temporary disturbance area of approximately 2.7 acres. A key objective is to restore the levee to design elevation to support a Letter of Map Revision and achieve FEMA accreditation. Construction is anticipated to take place from summer to fall 2027. The project is subject to strict environmental compliance under CEQA and NEPA, with specific requirements for equipment emissions. Contractors must use diesel engines meeting U.S. EPA Tier 4 Final standards and CARB-certified Level 3 filters for equipment over 50 horsepower, and haul trucks must be 2010 model year or newer. Additional mandates include the use of electric or alternative-fueled equipment where feasible, strict hazardous material containment protocols, and the performance of nesting bird surveys by a qualified biologist. The project also requires rigorous dust control measures and the submission of all equipment specifications for agency confirmation prior to the start of construction.
Other Heavy and Civil Engineering Construction

POSTED

8 days ago

DEADLINE

N/A
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS