Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Alondra Boulevard Pavement Rehabilitation from Gridley Road to West City Limits

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Norwalk is forecasting a pavement rehabilitation project for Alondra Boulevard, extending from Gridley Road to the West City Limits in Norwalk, California. This infrastructure project, categorized under NAICS code 237310, involves comprehensive roadwork including cold milling of existing AC pavement, AC removals and reconstructions, ARHM overlay, and AC base overlay. Additionally, the scope of work includes adjusting utilities to grade, implementing signing, striping, and traffic control, and the removal and replacement of cross gutters, spandrels, adjacent curbs, gutters, sidewalks, and ADA curb ramps. The project is managed by Albert Mendoza, P.E., the Public Services Director and City Engineer. According to the Notice of Exemption filed on June 30, 2026, the project is classified under Categorical Exemption 15301 Class I (c) of the Public Resources Code, as it consists of minor alterations to existing public facilities without significant expansion or environmental impact. The project is located within the 90650 zip code area of Los Angeles County.

General Info

City of Norwalk pavement rehabilitation project for Alondra Boulevard including roadway and utility improvements.

Agency

California → City of Norwalk

Place of Performance

Piuma Ave, Gridley Road, Norwalk, CA, 90650

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Norwalk
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Norwalk
Office AddressN/A
Contacts
Albert MendozaPublic Services Director/City Engineer

Full Description

Show more
The project involves cold milling existing AC pavement, AC removals and Reconstructions, ARHM overlay, AC base overlay and adjusting utilities to grade; signing, striping, and traffic control; removal and replacement of existing cross gutters and spandrels, including adjacent existing curb and gutter, existing sidewalk, existing ADA curb ramps and other appurtenant work.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS