Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Aluminum Water Control Structure Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Aluminum Water Control Structure Installation involves the fabrication and installation of 12-gauge aluminum water control structures for prime contractors working on wetland projects under the Iowa Division of Soil Conservation and Water Quality and the NRCS IA. The scope of work includes the fabrication of the structures, the provision of metal lifting rods, and the installation of concrete bases. The final delivery must consist of fully installed aluminum water control structures complete with stop logs and lifting rods. The project requires the contractor to possess aluminum fabrication tools and provide approved shop drawings. Performance will take place in Emmet County, Iowa, under the agency of Agriculture and Land Stewardship. Interested parties must submit their responses by October 27, 2026, following the posting date of October 7, 2026.

General Info

Fabrication and installation of aluminum water control structures in Emmet County, Iowa.

Documents

This scope was carved out of 26-12.

The full solicitation package (10 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

26-12 Emm1003114B (Emmett)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIowa → Agriculture and Land Stewardship
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs 12-gauge aluminum water control structures for prime contractors on Iowa Division of Soil Conservation and Water Quality / NRCS IA wetland projects. Fabricates WCS, provides metal lifting rods, and installs concrete bases. Requires approved shop drawings and aluminum fabrication tools. Delivers fully installed Aluminum WCS with stop logs and lifting rods.

Similar Contracts

Same NAICS industry code

More opportunities from Iowa → Agriculture and Land Stewardship

Same awarding agency

NAICS: 237110
SLED
26-13 Wor982210D (Worth)
Solicitation # 26-13
The Wor982210D Nutrient Reduction Wetland Project, managed by the Iowa Department of Agriculture and Land Stewardship, involves the construction of East and West wetland systems in Worth County, Iowa. The scope of work includes selective clearing, excavation of approximately 7,500 cubic yards of earthwork, installation of 700 linear feet of pipe, and the placement of 129 tons of riprap. Key infrastructure deliverables include three solar pump systems, two modified SW-512 intake concrete structures, three modified SW-513 outlet concrete structures, and two modified SW-401 and 402 lift station concrete structures, concluding with 2.5 acres of seeding. The estimated construction cost is between $225,000 and $325,000. The contract will be awarded to the lowest responsible bidder, with a bid submission deadline of November 12, 2026. Performance requirements include a 10% bid bond and a performance/payment bond equal to 100% of the contract price, which must remain in place for one year following final acceptance. All work except seeding must be completed by September 1, 2027, with all seeding finalized by December 15, 2027. Project administration includes a 3% retainage on progress payments and requires strict adherence to OSHA safety standards and NRCS specifications. Final acceptance is contingent upon a written certification from the engineer, Bolton & Menk, and the completion of all punch list items.
Water and Sewer Line and Related Structures Construction

POSTED

10 days ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS