Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Alvarado Trunk Sewer SDP (PTS No. 596507)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Alvarado Trunk Sewer Site Development Permit project, identified as project number 596507, is managed by the City of San Diego and involves the replacement of approximately 5.0 miles of gravity trunk sewer. The scope of work includes the use of open trench construction with an average depth of 20 feet, as well as trenchless methods such as slip-lining and micro-tunneling, with jacking and receiving pits reaching depths of 19 and 26 feet. Additionally, the project requires the abandonment of 1.6 miles of existing sewer main. The project alignment generally follows Interstate 8 from Fairmount Avenue to the City of San Diego/City of La Mesa border on Alvarado Road, impacting Fairmount Avenue, Mission Gorge Road, Zephyr Lane, Adobe Falls Road, and Alvarado Road. Construction will primarily occur within paved public rights-of-way and city-owned utility easements, with staging located in paved rights-of-way and developed private property. A specific portion of the project involves approximately 950 linear feet of open trench replacement within the Adobe Falls Open Space Canyon, utilizing an existing maintenance access path for construction entry. To mitigate impacts to Environmentally Sensitive Lands, disturbed habitats in the canyon will be revegetated using a Riparian and Diegan Coastal Sage Scrub plant palette and hydroseed mix, with ongoing monitoring until vegetation is established. The project is situated across Commercial, Industrial, Institutional, and Open Space zones within the Navajo and College Area Community Planning Areas and City Council Districts 7 and 9.

General Info

City of San Diego project replacing 5 miles of trunk sewer along Interstate 8.

Agency

California → City of San Diego

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for Alvarado Trunk Sewer SDP Project 596507

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of San Diego
Office AddressN/A
Contacts
Sheila GamuedaProject Officer 2

Full Description

Show more
A Site Development Permit (SDP) for impacts to Environmentally Sensitive Lands (ESL) to replace approximately 5.0 miles of gravity trunk sewer via open trench and trenchless construction methods. The average depth of open-trench construction is approximately 20 feet. Trenchless methods include slip-lining and micro-tunneling. Average depths of the jacking and receiving pits for trenchless construction are approximately 19 and 26 feet, respectively. The project will also abandon 1.6 miles of existing sewer main. Construction work will take place within the paved public right-of-way (streets) or city-owned utility easements. A small portion (approximately 950 linear feet) of open trench replacement will occur within Adobe Falls Open Space Canyon. Staging will occur in the paved right-of-way and developed private property including any areas immediately surrounding the driving and receiving pits (as noted on the construction plans). An existing maintenance access path is located within Adobe Falls Open Space and will be utilized for construction access. Sensitive habitat that is disturbed by trenching within Adobe Falls Open Space Canyon would be revegetated with a Riparian and Diegan Coastal Sage Scrub container plant palette and hydroseed mix. The revegetated area would be monitored and maintained until the vegetation has been established in accordance with the success criteria of the project's revegetation plan. The project would be located in various Commercial, Industrial, Institutional and Open Space zones, and unzoned public right-of-way.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 6 hours ago

DEADLINE

in about 14 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS