Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on August 18, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Amend SME for Engineering Support Services for Link 16 Network Integration

Closed
H92241-15-C-0001-P00003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 14 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

ATTN: AMSAM-SPK 401 Lee Blvd, FORT EUSTIS, VA, 23604, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Amsam-Spk
Contacts1 person available
OfficeFORT EUSTIS, VA, 23604-5577, USA
Office AddressFORT EUSTIS, VA, 23604-5577, USA
Contacts

Full Description

Show more
The U.S. Special Operations Command (USSOCOM) ,Technology Applications Contracting Office (TAKO) anticipates modifying existing contract H92241-15-C-0001 with S3 Defense, Inc. 403 Green Tree Cove, Newport News, VA 23663. This contract is for Engineering Support Services performed by a subject matter expert (SME) for Link 16 network integration on Army Special Operations Aviation (ARSOA) aircraft. The proposed modification will increase the level of effort from 0.5 FTE to 1.0 FTE. The intended contract action is for services for which the Government intends to solicit and negotiate with only one source under the authority of FAR 6.302-1, only one responsible source and no other supplies or services will satisfy agency requirements, as it is likely that award to any other source would result in substantial duplication of cost to the Government that is not expected to be recovered through competition. The SME will perform work on site at Fort Eustis, VA and the Government will not fund TDY. All interested, capable, and responsible sources that would like to respond to this notice are encouraged to provide a statement of interest along with supporting documentation to Stacey Kirkland , Contract Specialist via email at stacey.n.kirkland.civ@mail.mil no later than 12:00 pm Eastern Time on 02 September 2016. All responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS