Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

AMENDMENT 002 - ODR Countertop & Cabinets Replacement

Closed
FA254326R0012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 5 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 5 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 5 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

Solicitation FA254326R0012 is a total small business set-aside for the demolition and replacement of the reception area at the Buckley Space Force Base Outdoor Recreation facility in Building 1022. The project requires the removal of existing casework and the installation of a new L-shaped front counter featuring a seamless 100% acrylic surface with two 42-inch high reception caps and a 30-inch ADA-compliant section. Additionally, the contractor will install a 16-foot, three-tiered back-wall storage system consisting of lockable base cabinets, a whiteboard layer, and open overhead shelving, along with two ski desks and the necessary electrical and data infrastructure to support web-based Point of Sale systems. The contract will be awarded based on the Lowest Price Technically Acceptable (LPTA) method, with an anticipated period of performance of 60 calendar days from the Notice to Proceed. Key requirements include compliance with the Davis-Bacon Act for wage determinations, OSHA safety standards, and the submission of material submittals via AF Form 66. Proposals must be submitted in two volumes, technical and pricing, and the final project acceptance is contingent upon a physical walkthrough and the resolution of all punch list items by the ODR Manager. The proposal deadline was extended via Amendment 002 to September 17, 2026.

General Info

Small business contract for reception area demolition and replacement at Buckley Space Force Base.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Aurora, CO, 80011, USA

Set-Aside

SBA

Documents

16

Atch 1 ODR Countertop and Cabinets SOW

PDF, High priority: read this first3 pages · sow
High

C020260016 Wage Determination - Colorado, Arapahoe County

PDF, High priority: read this firstwage-determination
High

FA254326R0012 - ODR Countertop & Cabinets Amendment Two

PDF, High priority: read this firstamendment
High

FA254326R0012 RFP - ODR Countertop & Cabinets

PDF, High priority: read this first5 pages · rfp
High

ODR Countertop & Cabinets Replacement - Schedule of Material Submittals

XLSX, High priority: read this firstspecifications
High

ODR Countertops & Cabinets Consolidated RFI QA

XLSX, High priority: read this firstq-and-a
High

ODR Countertops & Cabinets Consolidated RFI QA

PDF, High priority: read this firstq-and-a
High

ODR Countertops & Cabinets SOW Rev 1

PDF, High priority: read this firstsow
High

ODR Specifications - Front Desk Counter Renovation, Bldg. 1022

PDF, High priority: read this first6 pages · specifications
High

Buckley SFB Form 128 - Request for Visitor Unescorted Access

PDF, Low priority1 page · form
Low

NAF Standard Clauses Incorporated by Reference - Full Text

PDF, Low priority134 pages · contract-clauses
Low

RFI Template (2 Feb 2026)

PDF, Low priority2 pages · rfi
Low

Buckley-MainDesk-Visitor-View1_counter+new+design+2.jpg

JPG

Buckley-MainDesk-Visitor-View2_counter+new+desgin.jpg

JPG

Outdoor+Rec+4.jpg

JPG

Outdoor+Rec+5.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Sep 16, 2026 to Sep 17, 2026. The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2543 460 Cons
Contacts2 people available
OfficeBUCKLEY AFB, CO, 80011-9572, USA
Office AddressBUCKLEY AFB, CO, 80011-9572, USA
Contacts

Full Description

Show more

AMENDMENT 002: Updated the Statement of Work (SOW), incorporated the pre-award RFI Q&A Log, added the AF Form 66 Submittal Schedule, and revised the RFP Volume I Technical Factors. Additionally, the proposal due date is extended from 16 September 2026 to 17 September 2026. These updates are reflected on the Request for Proposal (RFP) Amendment Two. All other terms and conditions remain unchanged.


AMENDMENT 001: Updated Notice ID from FA254326Q0035 to FA254326R0012. This update is also reflected on the Request for Proposal (RFP) V2. All other terms and conditions remain unchanged.


The Buckley SFB Outdoor Recreation (ODR) facility (Bldg. 1022) is upgrading its reception area to improve service delivery and organizational workflow.

This project involves the complete demolition of the existing front desk and the single-phase installation of a new, ADA-compliant L-shaped front counter paired with a structured, three-tiered back-wall storage system. The upgraded reception counter features a durable, seamless 100% acrylic surface with two 42-inch high caps and a 30-inch high accessible section, while the rear storage unit integrates lockable lower cabinets, a middle whiteboard layer, and open overhead shelving. Additionally, the contractor will install two ski desks, route supporting electrical conduits, and complete necessary plumbing utility hookups without disruption to ongoing operations. For additional details please reference the Statement of Work (SOW). 


Site Visit: As prescribed in RFO 52.237-1, Site Visit, all prospective offerors are urged and expected to inspect the site where the work will be performed. The site visit will be conducted on Tuesday, 01 September 2026 at 10:00 A.M. Mountain Standard Time (MST) at BSFB. We will meet at the Buckley SFB Outdoor Recreation Facility (Bldg. 1022). Any personnel that require base access shall submit the BSFB Access Form 128 (Attachment 2) to the Contract Specialist (CS) and Contracting Officer (CO) no later than Wednesday, 26 August 2026 at 10:00 A.M. Mountain Standard Time (MST) in advance of the site visit with the Name, DOB, and Driver’s License Number/State, and Foreign Status.

More opportunities from Department Of Defense → FA2543 460 Cons

Same awarding agency

NAICS: 541990
New
Federal
Industrial Control Technician
Solicitation # FA2543_FY27
This Sources Sought inquiry, solicitation number FA2543_FY27, seeks capable small businesses to provide industrial control and system administration services for Buckley Space Force Base in Colorado. The requirement involves providing an Industrial Control Technician and an Industrial Technician to perform maintenance, configuration, and cybersecurity hardening of field-level Operational Technology infrastructure and Civil Engineering Control Systems. Key responsibilities include diagnosing electromechanical faults in control cabinets, managing network protocols such as BACnet/IP and Modbus TCP/IP, and performing system administration for servers and specialized software including NexGen IT, AutoCAD, and BUILDER. The contractor must ensure all personnel possess and maintain a fully adjudicated Secret (T3) security clearance and provide a DoD Secret level facility security clearance. Critical deliverables include a Quality Control Plan due within 10 business days of award, an OCI Mitigation Plan submitted at the time of proposal, and Monthly Status Reports. Performance is measured by strict quality standards, including 100 percent compliance with OT physical security, weekly data backups, and the mitigation of CAT I vulnerabilities within 15 days. All work is to be performed at the 460 CES facility offices at Buckley Space Force Base, with adherence to DISA STIGs and IAVMs for cybersecurity compliance.
All Other Professional, Scientific, and Technical Services

POSTED

about 23 hours ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS