American Jewish University - Camp Alonim Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
American Jewish University is seeking authorization to substantially expand its Camp Alonim facility in Simi Valley, California, through a major modification to Conditional Use Permit No. 1776 and a discretionary tree permit. The project involves constructing a 4,460 square foot Welcome Center with lobby, staff lounge, offices, and meeting rooms; 13 new camper cabins, each 1,930 square feet with two bunkrooms and two bathrooms; three head counselor cabins at 441 square feet each; a 2,307 square foot open-air Arts Pavilion; and a new 58-space parking lot adjacent to the Welcome Center. Landscaping improvements will accompany the new structures. To make way for the development, three housing trailers, two cottages, and a garage will be demolished. The project requires the removal of 74 trees, including 15 protected trees—nine coast live oaks, one sycamore, and five heritage trees comprising four pepper trees and one eucalyptus. Additionally, 67 existing trees will be encroached upon, 42 of which are protected, including 20 oaks, 18 sycamores, and four heritage-sized pepper trees. The camp’s maximum capacity for attendees will increase from 472 to 572, with the allowable number of annual event days expanding significantly: up to 150 days with attendance of up to 300 people, up to ten days with up to 500 attendees, and up to six days with up to 1,000 attendees, while the number of camp staff will remain capped at 200. Access to the property via Peppertree Lane will not change, and water services will continue through the Brandeis-Bardin Mutual Water Company, which receives imported water from Calleguas Municipal Water District, while wastewater will be managed by the City of Simi Valley. As part of the modification, the Conditional Use Permit will be expanded to include authorization of all existing and proposed Brandeis-Bardin Mutual Water Company facilities, and its expiration date of 2042 will be eliminated, making the permit valid indefinitely. Construction is scheduled to occur between June 2026 and March 2028, with demolition beginning in June 2026, followed by site preparation, grading, trenching, building construction, paving, and architectural coating. The project is subject
General Info
Agency
NAICS
Place of Performance
Tapo Canyon Road and Guardian Street, CA, 93064Set-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description
Similar Contracts
Same NAICS industry code
