Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

AmeriCorps Trails Improvement Project (Notification of Lake or Streambed Alteration, No. EPIMS-SON-55944-R3)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The AmeriCorps Trails Improvement Project, executed by the California Department of Fish and Wildlife under Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SON-55944-R3, authorizes the City of Sebastopol to extend an existing trail system along the Laguna de Santa Rosa in Sonoma County. Pursuant to Section 1602 of the Fish and Game Code, the project involves the installation of a 48-foot-long by 8-foot-wide aluminum pedestrian bridge spanning Zephyr Creek, supported by 10-foot-wide by 2-foot-long cast-in-place concrete abutments. To manage water flow toward the Laguna de Santa Rosa, a 12-inch-wide by 8-foot-long high-density polyethylene culvert will also be constructed. The project is classified under a Class 3 categorical exemption for small facility construction and is designed to ensure the bridge remains outside the 100-year flood elevation with abutments located above the top of the bank. Environmental impacts include the removal of two riparian trees and approximately 392 square feet of permanent impact to riparian habitat. All access and staging for the project are restricted to existing roads and developed trails. Administrative oversight is provided by James Hansen of the California Department of Fish and Wildlife and Elissa Overton of the City of Sebastopol Public Works Department.

General Info

City of Sebastopol to build bridge and culvert near Laguna de Santa Rosa, impacting 392 sq ft riparian habitat.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption EPIMS-SON-55944-R3 AmeriCorps Trails Improvement Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A
Contacts
James HansenEnvironmental Scientist
Elissa OvertonPerson or Public Agency Carrying Out Project

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SON-55944-R3, pursuant to Section 1602 of the Fish and Game Code to City of Sebastopol. The project is limited to the extension of an existing trail system that runs along the Laguna de Santa Rosa. The project includes the construction of a new 48-foot-long by 8-foot-wide pedestrian bridge fully spanning Zephyr Creek and new 10-foot-wide by 2-foot-long cast-in-place concrete bridge abutments on both sides of Zimpher Creek. The new pedestrian bridge will be composed of aluminum and assembled on-site, and then placed on the new concrete abutments. Abutments will be located above the top of bank and the bridge will be outside of the 100-year flood elevation. The project also involves the construction of a 12-inch-wide by 8-foot-long high-density polyethylene (HDPE) culvert along the trail to pass sheet water flow under the trail and towards the Laguna de Santa Rosa. The project will result in approximately 392 square feet of permanent impact to riparian habitat. The project will also result in the removal of two riparian trees. Access and staging will occur via existing roads and developed trails.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS