This Pre-Solicitation opportunity from International Boundary And Water Commission: Us-Mexico was posted on August 15, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Amistad Dam Plugging of Penstock #4

Closed
191BWC24B0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 14 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
SLED
Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)
Solicitation # IFB-395-26-JM
The City of Hollywood, Florida, is soliciting bids under IFB-395-26-JM (Project No. 25-4261A) for the Water Treatment Plant Maintenance Package A Degasifier Package. The project involves the replacement of packing media in three degasifiers (units 2, 3, and 4) at the Water Treatment Plant located at 3441 Hollywood Boulevard. The scope of work includes power washing vessel interiors, replacing media support grids and differential pressure gauges, vessel disinfection, and resealing access doors. To maintain continuous plant operations, work must be performed on one unit at a time. The project requires a prime contractor holding an active Florida General Contractor license, a project manager with at least five years of experience in similar projects, and a factory-trained service technician for field performance testing. The contract follows a strict timeline with substantial completion required within 180 calendar days and final project closeout within 210 calendar days from the Notice to Proceed. Bidders must provide a bid guaranty of 5 percent of the bid amount, and the successful awardee must provide performance and payment bonds equal to 100 percent of the contract price. Award will be granted to the lowest responsive and responsible bidder. Key financial terms include a City Contingency Allowance of 86,000 dollars, with mobilization and demobilization capped at 5 percent and 2 percent of the cost, respectively. The final bid submission deadline was extended to November 18, 2026, at 3:00 PM via the OpenGov e-Procurement Portal.
Public Utilities

POSTED

about 16 hours ago

DEADLINE

in 20 days

General Info

Agency

International Boundary And Water Commission: Us-Mexico

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Del Rio, TX, USA

Set-Aside

SBA

Documents

1

USIBWC Penstock #4 Plugging Presolicitation Notice

PDF, Low prioritypresolicitation
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyInternational Boundary And Water Commission: Us-Mexico
Contacts2 people available
OfficeEl Paso, TX, 79902, USA
Organization / Agency
International Boundary And Water Commission: Us-Mexico
Office AddressEl Paso, TX, 79902, USA

Full Description

Show more
The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation (sealed bid) for the purpose of permanently plugging of Penstock #4 to eliminate the need for continued maintenance of penstock and irrigation gates. Most work takes place 190 feet below the Dam's service deck. Contractor must manage the confined space and any water infiltrations. The major construction efforts include, but not limited to, the following tasks: - Remove Irrigation Gate - Design and install a man lift needed to access personnel and materials down to Penstock #4 plug area - Install temporary brackets to the Penstock Gate - Clean, measure, and repair monolith base adjacent to the Penstock Gate - Clean and prepare the surface of the concrete plug, install sheer brackets, formwork, place concrete and grout in the plug area. Upon completion of the plug and repair work, the temporary brackets shall be removed. - Remove the Penstock Gate The following site constraints apply: - The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor, and any subcontractors, shall only work onsite during these proposed hours. USIBWC facilities, including the dam, are closed during all Federal Holidays. - There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Use of the bulkhead must be coordinated with Amistad Field Office Area Operations Manager through the COR. The bulkhead is approximately 14.3 feet wide by 24.6 feet tall. The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons). - Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds. - Workers must pass through the port of entry to access the worksite. The port of entry is open from 10:00 a.m. to 6:00 p.m. DHS may change these hours without notice. If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Field Office Area Operations Manager. Workers crossing through the port of entry need to have proper documentation for reentry to the United States. Per FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000. The work is located in Val Verde County, Texas. A site visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price. All work shall be completed within three hundred (300) calendar days after the Notice to Proceed. - One hundred and eighty (180) calendar days are allotted for construction. - The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction. The time for completion of final paperwork is included in the three hundred (300) calendar days. The time stated for completion shall include final cleanup of the premises. The Solicitation, plans, and specifications are expected to be posted on or about August 1, 2024 (this is a target date which may slip or change). The Solicitation will be available for a minimum of thirty (30) calendar days. This is a Presolicitation Notice. The Solicitation will include information on how to obtain the plans and specifications. All responsible sources may submit a bid to be considered by the Agency.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS