Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Anchor Installation & Soil Stabilization

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entitled Anchor Installation & Soil Stabilization involves the excavation, setup of a guy anchor or deadman system, and proper backfilling with compaction to ensure the structural integrity of a newly installed utility pole. The work requires strict adherence to geotechnical standards, potentially including soil testing to determine load-bearing capacity and stability conditions, ensuring the anchoring system effectively supports the pole under all environmental and operational stresses. All tasks must be executed to meet engineering specifications and regulatory requirements for utility infrastructure reliability. This subcontract is managed under Caltrans District 12 in Orange, California, with the primary work location specified as Brea. The NAICS code 238990 indicates it falls under other heavy and civil engineering construction activities, aligning the project with non-residential groundwork and site preparation services. The contract was posted on July 2, 2026, and is intended for a private contractor as part of a larger public infrastructure initiative, with no set-aside provisions identified. Performance must ensure long-term durability of the pole installation, with all materials and procedures compliant with state and local engineering norms.

General Info

Anchor installation and soil stabilization for utility pole in Brea, CA, per geotechnical and Caltrans standards.

Agency

California → Caltrans, District 12 - Orange

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

Brea, CA

Set-Aside

NONE

Documents

This scope was carved out of 1226-6US-0469.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Encroachment Permit No. 1226-6US-0469

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 12 - Orange
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Caltrans, District 12 - Orange
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Excavation, installation of a guy anchor or deadman system, and backfill/compaction to ensure structural stability of the new utility pole, possibly involving soil testing.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Floor Treatment Services
Solicitation # Floor Treatment Services
This solicitation is for professional floor care and cleaning services at the Earle C. Clements Job Corps Academy in Morganfield, Kentucky. The scope of work includes floor stripping and refinishing with the application of four coats of premium commercial-grade finish to VCT areas, carpet cleaning, terrazzo floor treatment, and kitchen tile cleaning. The selected contractor is responsible for providing all labor, materials, equipment, and supervision, ensuring all work is performed in a professional manner and meets safety standards, including OSHA compliance and the use of appropriate personal protective equipment and hazard signage. All work must be completed within sixty calendar days from the authorized start date, with final acceptance contingent upon a successful walkthrough and inspection by an academy representative. This is a subcontracting opportunity with Management & Training Corporation (MTC) and is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB. Bids must be submitted as a lump sum fee by September 11, 2026, and must include a bid sheet, self-certification form, and acceptance of terms and conditions. Award decisions will be based on best value as determined by MTC. The contract requires strict adherence to federal regulations, including Service Contract Labor Standards for prevailing wages under Wage Determination 2015-4687, Buy American provisions, and FFATA reporting for projects valued at $40,000 or more. Contractors must provide a Unique Entity ID (UEI) and submit invoices on a weekly or bi-weekly basis.
Earle C. Clements Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 13 days
View Details
NAICS: 238990
New
WOJC - Chain-Link Fence Repair
Solicitation # wojc-chain-link-fence-repair
Education & Training Resources is seeking quotes for a subcontracting opportunity to repair approximately 40 linear feet of chain-link fence at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work involves a full site assessment, demolition of damaged fabric and posts, and the installation of new materials that match the existing gauge, mesh size, and coating to restore the fence to a secure and functional condition. The project requires a one-year equipment and workmanship warranty and must adhere to industry standards, OSHA regulations, and local construction codes. Bids are due by September 11, 2026, with a site walkthrough scheduled for September 3, 2026. Eligible bidders must be registered in SAM.gov with a Unique Entity ID and provide a W-9, business licenses, and applicable insurance certificates. The evaluation process is based on a fee-for-services model, requiring a detailed cost breakdown and a proposed performance schedule, though the lowest bid does not guarantee an award. Compliance with the Davis-Bacon Act, the Service Contract Act, and specific FAR clauses regarding debarment and minimum wages is mandatory. Depending on the final contract value, performance and payment bonds may be required for projects exceeding 35,000 dollars. All submissions must include a signed Vendor Acknowledgement Form and remain valid for at least 60 days.
Westover Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 13 days
View Details