Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Anderson Dam Seismic Retrofit Project Draft Environmental Impact Report (EIR)

Forecast
ENV25492State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Anderson Dam Seismic Retrofit Project, led by the Santa Clara Valley Water District, focuses on the removal and reconstruction of Anderson Dam in Morgan Hill, California, to meet public safety requirements. This initiative allows for the restoration of Anderson Reservoir to its original capacity while minimizing environmental impacts. The scope of work includes decommissioning existing hydroelectric facilities, surrendering the associated Federal Energy Regulatory Commission license exemption, and implementing conservation measures along Coyote Creek. Post-construction activities involve an adaptive management program, conservation measure operations, and modified reservoir releases under the Fish and Aquatic Habitat Collaborative Effort (FAHCE)-Plus. The project has undergone comprehensive environmental review in compliance with the California Environmental Quality Act (CEQA), resulting in the preparation of an Environmental Impact Report and the adoption of specific mitigation measures and monitoring plans. Administrative filings and notices of determination have been submitted to the State Water Resources Control Board and the County of Santa Clara. Project management is coordinated by Tiffany Chao, and the project is categorized under NAICS code 541620. Financial records indicate the payment of administrative filing fees totaling 4,173.50 dollars to the Santa Clara County Clerk-Recorder's office.

General Info

Santa Clara Valley Water District retrofits Anderson Dam for seismic safety, restores reservoir, and implements environmental offsets via CEQA process.

Place of Performance

Coyote Ranch and Cochrane Road, Morgan Hill, CA, 95118

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The Santa Clara Valley Water District's Project retrofits Anderson Dam to meet public safety requirements, allowing Valley Water to restore Anderson Reservoir to its original capacity while minimizing environmental impacts. It also decommissions the Dam's hydroelectric facility and implements Conservation Measures (CMs) along Coyote Creek. Post-construction activities include FAHCE-Plus Modified reservoir releases, CM operations, and an adaptive management program.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 14 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 17 hours ago

DEADLINE

in 24 days
View Details

More opportunities from California → Santa Clara Valley Water District

Same awarding agency

NAICS: 237990
New
SLED
Tularcitos Creek Downstream North Hillview Drive Levee RepairThe Tularcitos Creek Downstream North Hillview Drive Levee Repair Project, managed by the Santa Clara Valley Water District, focuses on repairing approximately 2,932 linear feet of the west bank levee in Milpitas, California. The project aims to address erosion and damage caused by rodent burrowing to protect public safety and property. Reconstruction will utilize SMP-2 Method 1A, which involves installing a buried rock buttress to stabilize the channel embankment and provide a stable foundation over saturated soils. The scope of work includes dewatering, the installation and removal of two temporary access ramps, and bank stabilization, with a total temporary disturbance area of approximately 2.7 acres. A key objective is to restore the levee to design elevation to support a Letter of Map Revision and achieve FEMA accreditation. Construction is anticipated to take place from summer to fall 2027. The project is subject to strict environmental compliance under CEQA and NEPA, with specific requirements for equipment emissions. Contractors must use diesel engines meeting U.S. EPA Tier 4 Final standards and CARB-certified Level 3 filters for equipment over 50 horsepower, and haul trucks must be 2010 model year or newer. Additional mandates include the use of electric or alternative-fueled equipment where feasible, strict hazardous material containment protocols, and the performance of nesting bird surveys by a qualified biologist. The project also requires rigorous dust control measures and the submission of all equipment specifications for agency confirmation prior to the start of construction.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS