Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Animal Control Facility Improvements

Closed
CP 25-049State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 10 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 10 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The contract titled "Animal Control Facility Improvements" is a solicitation issued by the California Municipal Services-Engineering department, with a posted date of May 20, 2026, and a response deadline of June 15, 2026. The Engineer's Estimate for the project is valued at $248,000. The solicitation is managed under the reference number CP 25-049 and pertains to facility improvements within the animal control sector, with the place of performance being in California, specifically affiliated with Turlock city offices. Key contacts for this project include Stephen Fremming, the Principal Civil Engineer, and Gloria Aguilera, Staff Services Assistant, both accessible via provided phone numbers and email addresses. The solicitation is not designated under any specific set-aside or NAICS code, and it is handled by the State and Local Government category. Interested parties can find further details and submit responses through the specified online procurement portal.

General Info

Solicitation for Animal Control Facility improvements in Turlock, California, budget $248,000, deadline June 15, 2026.

Documents

16

Bidder's Bond for City of Turlock Project

PDF, High priority: read this firstbidder-bond
High

City of Turlock CP 25-049 Animal Control Facility Improvements

PDF, High priority: read this firstrfp
High

City of Turlock CP 25-049 Animal Control Facility Improvements RFP

PDF, High priority: read this firstrfp
High

City Project No. 25-049 Animal Control Facility Specifications

PDF, High priority: read this firstspecifications
High

Construction Waste Management Plan (CWMP) Template

PDF, High priority: read this firstconstruction-waste-management-plan
High

Exhibit 12-B Bidder’s List of Subcontractors

PDF, High priority: read this firstsow
High

Exhibit 15-H Proposer/Contractor Good Faith Efforts

PDF, High priority: read this firstsow
High

Public Improvement Agreement for Animal Control Facility Improvements CP 25-049

PDF, High priority: read this firstcontract-document
High

SECTION 081113 Hollow Metal Doors and Frames Technical Specifications

PDF, High priority: read this firstspecifications
High

Subcontractors Listing Form for California Public Contract

PDF, High priority: read this first1 page · subcontractors-listing
High

Affidavit of Non-Collusion for Bid Submission

PDF, Low priority1 page · affidavit
Low

Disadvantaged Business Enterprises (DBE) Certification Status Change Instructions

PDF, Low priority2 pages · other
Low

Disclosure of Lobbying Activities SF-LLL

PDF, Low priority2 pages · disclosure-of-lobbying-activities
Low

Exhibit 15-G Construction Contract DBE Commitment

PDF, Low priorityform
Low

Exhibit 17-F Final DBE Utilization Report

PDF, Low priorityform
Low

Turlock Animal Control Facility Improvements Project Plans

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Municipal Services-Engineering
Contacts2 people available
OfficeTurlock, CA, 95380, USA
Office AddressTurlock, CA, 95380, USA
Contacts
Stephen FremmingPrincipal Civil Engineer
Gloria AguileraStaff Services Assistant

Interested Companies (18)

Dodge Construction NetworkGrand Prairie, TX
Taylor Backhoe ServiceMerced, CA
SAN Francisco Builders ExchangeSAN FRANCISCO, CA

See All 18 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Engineer's Estimate is $248,000.

More opportunities from California → Municipal Services-Engineering

Same awarding agency

NAICS: 237310
SLED
Transit Area Asphalt Resurfacing
Solicitation # 26-044
The Transit Area Asphalt Resurfacing project, solicitation number 26-044, is a municipal construction contract for the City of Turlock, California, with an engineer's estimate of 233,000.00 dollars. The scope of work involves the cold milling and removal of a two-inch asphalt concrete layer, scarifying the native subgrade to 95 percent relative compaction, and applying a new asphalt concrete overlay across approximately 28,400 square feet of pavement at an active Transit Corporation Yard. The project concludes with the installation of permanent thermoplastic striping for bus parking stalls, which must be performed seven calendar days after paving to allow for proper curing. Due to the facility's role in daily CNG bus fueling, the project is subject to strict operational constraints, requiring work to be phased within tight weekend-only windows. The contract will be awarded to the lowest responsive and responsible bidder possessing either a Class A General Engineering or Class C-12 Earthwork and Paving contractor license. Required securities include bid and indemnity bonds of at least 10 percent of the bid amount, and performance and payment bonds equal to 100 percent of the contract price. All work must adhere to California prevailing wage rates for Stanislaus County and City of Turlock Standard Specifications. Performance is tightly scheduled, with substantial completion required within ten days of the Notice to Proceed.
Highway, Street, and Bridge Construction

POSTED

7 days ago

DEADLINE

in 8 days
View Details
NAICS: 237110
SLED
Water Line Replacement on S Center Street and Crane Avenue
Solicitation # 24-022
City Project No. 24-022 is a public improvement agreement for the replacement of water lines on S Center Street and Crane Avenue in Turlock, California. The scope of work involves installing approximately 1,677 lineal feet of new PVC water main pipe and new water service laterals, removing the existing water main pipe, and restoring trenches. The project is managed by the Municipal Services-Engineering division, with Oscar Molina serving as the primary contract administrator. The Engineer's Estimate for the project is 1,100,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder possessing either a General Engineering Contractor (A) or Pipeline Contractor (C-34) license. Bidders must submit proposals via the OpenGov Procurement Portal by November 4, 2026, including a bid bond of at least 10 percent of the total bid. Once awarded, the contractor must provide performance and payment bonds equal to 100 percent of the contract price. Work must commence within 10 working days of the Notice to Proceed, with substantial completion required within 60 working days and final completion within 65 working days. Delay damages are set at 2,800 dollars per substantial working day and 700 dollars per final working day. Compliance requirements include adhering to California Department of Industrial Relations prevailing wage rates, submitting weekly certified payroll, and following highway repair safety standards. The project also emphasizes Disadvantaged Business Enterprise (DBE) participation, requiring specific reporting and commitment documentation. All improvements are subject to inspection and approval by the City of Turlock and its engineers prior to entering service.
Water and Sewer Line and Related Structures Construction

POSTED

20 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS