Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Annual Sewer Lateral Repair Project 2025 (Round One)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Annual Sewer Lateral Repair Project 2025 (Round One) is a City of Eureka initiative designed to reduce stormwater runoff and groundwater infiltration into the sanitary sewer system by replacing defective clay sewer laterals. The project involves the excavation and replacement of 50 to 100 laterals annually at various locations throughout the city. The scope of work includes disconnecting old pipes, installing new sewer pipes, reconnecting laterals from dwellings to the sewer main, and backfilling and compacting the sites. All work will be performed in the street, with no work conducted on the exterior of residences. The contractor is responsible for restoring any damaged sidewalks, driveways, and streets according to City of Eureka Resolution No. 6219 and EMC section 13.04.110. Construction is scheduled to take place from August 2025 through October 2025, with working hours from 8 a.m. to 5 p.m., Monday through Friday. The contractor must implement an approved traffic control plan and an erosion control plan, utilizing standard Best Management Practices to minimize disruptions to local businesses and residents. Daily site cleanup is required, and if project disturbance exceeds one acre, the contractor must comply with a Storm Water Pollution Prevention Plan per Construction General Permit Order 2009-0009-DWQ and obtain necessary land use entitlements. Additionally, all work at 1010 Broadway must follow the Soil Management Contingency Plan dated May 2005.

General Info

Repairing aging sewer laterals in Eureka, CA, 2025, with soil and environmental compliance, restoring surfaces, and community notifications.

Agency

California → City of Eureka

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

City Wide project see list in other location info, Eureka, CA, 95501

Set-Aside

NONE

Documents

(1)

Notice of Exemption - Annual Sewer Lateral Repair Project 2025

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Eureka
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Eureka
Office AddressN/A
Contacts
Taylor RayburnAssistant Planner

Full Description

Show more
The project includes the excavation and replacement of multiple defective sewer lateral lines in batches by disconnecting the old section of pipe, installing the new sewer pipe, and reconnecting the lateral pipes from the dwelling to the sewer main. After completing the lateral connections, the disturbed site will be backfilled and compacted. The replacement or repair of sidewalks, driveways, and streets damaged or removed by the sewer lateral installation will be performed to City Standards and Specifications for Construction of Sidewalk, Curbs, Gutters, and Drop Curb Entrances (City of Eureka Resolution No. 6219, EMC §13.04. 1 10, Standards for Sidewalks and Curbs) During construction, the contractor will be required to employ standard Best Management Practices (BMPs) to minimize environmental impacts, and to ensure minimal disruption to traffic, nearby residences and businesses. Erosion control will be implemented per an Erosion Control Plan developed by the contractor and approved by the City. The contractor will be required to clean the construction site at the end of each day. If the contractor obtains additional staging areas that result in total project disturbance of more than one acre, the contractor will be required to prepare and comply with a Storm Water Pollution Prevention Plan (SWPPP) in accordance with Construction General Permit Order 2009-0009-DWQ, and will obtain any required land use entitlements (such as a Use Permit or Coastal Development Permit) required for the staging areas. Traffic control will be implemented per a traffic control plan approved by the City. General circulation and access will be maintained in the areas of construction. There will be temporary lane shifts, short-term road closures with available detours, and controlled traffic. Emergency vehicles will be allowed through the construction areas. The City will provide pre-construction notices to potentially impacted businesses, and residents, and provide public service announcements that inform the public of the planned construction activities. Construction is expected to begin in August 2025 and continue through October 2025. Work will occur Monday through Friday, from 8 a.m. to 5 p.m. Finally, all sewer lateral work at 1010 Broadway (APN: 003- 121-048) will be undertaken following the Soil Management Contingency Plan prepared by SHN Consulting Engineers & Geologists, Inc, dated May, 2005. Background: The City of Eureka has approximately I 1 ,000 sanitary sewer laterals which carry wastewater from dwellings to the sanitary sewer main. The recent updates to the Sewer Lateral Ordinance codified in Eureka Municipal Code (EMC) Chapter 50: Sewers, created triggers that require laterals be inspected and repaired if found to be defective. The replacement of the sewer laterals will reduce the amount of inflow from stormwater runoff and infiltration of groundwater that enters the City’s wastewater sanitary sewer system because the pipes are made of clay which have deteriorated over the years causing stormwater intrusion. Each location is a different address within the City. The list of addresses is continuously being updated with homeowners who have been found to have a defective sewer lateral. The cost of the repair and managing a contractor can be onerous to individual property owners. To alleviate this situation, the City has created a program which allows property owners to choose to have their lower lateral replaced at a set “in lieu” fee, rather than hiring a contractor. City staff will manage a project to replace a large group of laterals (in different “rounds”) with the intent of providing an economy of scale to reduce the cost of the repairs. The funds accumulated from the in-lieu fees will be applied to the project. The City will then fund the difference in the cost of the lateral replacement, partially subsidizing the work, as required by a court ordered consent decree. In general, this project consists of: digging and replacing sewer laterals at various locations throughout the City. It is anticipated that 50 to 100 laterals per year will be replaced through this annual project, however the exact number will change depending on participation in the program and bid item costs.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 10 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 10 hours ago

DEADLINE

in about 22 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS