Annual Street Resurfacing Program - Cycle 2 Measure P - MP2026

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Vallejo is preparing to implement the Annual Street Resurfacing Program Cycle 2 under Measure P, focusing on comprehensive rehabilitation of existing roadways throughout the city. Work will include pavement treatments such as rubberized cape seal applications, cold planing, localized base repairs, installation of a Stress Absorbing Membrane Interlayer, and asphalt overlays of varying thicknesses, alongside wedge and conform grinding and utility cover adjustments. Concrete curb and gutter systems will be replaced where damaged, ADA-compliant curb ramps will be constructed, and all pavement striping, markings, and raised pavement markers will be renewed to ensure visibility and safety. All activities are confined to the existing public right-of-way and are designed to extend the life of current infrastructure without expanding its footprint. Temporary traffic control measures will be implemented in strict compliance with the latest California Manual on Uniform Traffic Control Devices to ensure public safety during construction. All work must adhere to the City-approved plans, specifications, and contract documents, encompassing all incidental and appurtenant tasks necessary for full project completion. The initiative is part of a broader effort to maintain and improve the city’s transportation infrastructure under Measure P funding, with coordination directed by the Planning Manager and Public Works Director. The project is forecasted for solicitation in July 2026, with performance limited to the City of Vallejo, California, specifically the 94590 zip code area.

General Info

Vallejo to resurface streets under Measure P with sealants, overlays, curb repairs, and ADA ramps in 94590, 2026.

Agency

California → City of Vallejo

NAICS

N/A

Place of Performance

Multiple locations in the City of Vallejo - Columbus PKWY & Ascot PKWY, Jordan St. & Magazine St, Vallejo, CA, 94590

Set-Aside

NONE

Documents

(1)

Annual Street Resurfacing Program_NOE

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Vallejo
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Vallejo
Office AddressN/A
Contacts
Cesar OrozcoPlanning Manager
Leonard JobPublic Works Director

Full Description

Show more
The proposed project consists of the rehabilitation of existing roadway improvements on various streets throughout the City of Vallejo. Project activities are limited to the repair, maintenance, and rehabilitation of existing transportation facilities within the existing public right-of-way and include, but are not limited to: Pavement rehabilitation using rubberized cape seal (consisting of a recycled rubber chip seal followed by a slurry seal treatment), cold planing of existing asphalt pavement, localized pavement repairs (dig-outs/base repairs), installation of a Stress Absorbing Membrane Interlayer (SAMI), asphalt concrete overlays of varying thicknesses, wedge grinding and conform grinding, and adjustment of utility covers as necessary; and Removal and replacement of damaged concrete curb and gutter, construction of Americans with Disabilities Act (ADA)-compliant curb ramps, and replacement of pavement striping, markings, and raised pavement markers; and Implementation of temporary traffic control measures in accordance with the most current edition of the California Manual on Uniform Traffic Control Devices (CA MUTCD); and All associated incidental and appurtenant work necessary to complete the project in accordance with City-approved plans, specifications, and contract documents.