Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Vermont was posted on October 18, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ANR Fire Tower Improvements at Bear Hill & Burke Mountain

Closed
61741State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 4 hours ago

DEADLINE

in 5 days
NAICS: 238160
New
SLED
Gatesville ISD Intermediate Campus Roof Repair
Solicitation # RFP2026-1030
Gatesville Independent School District is soliciting sealed proposals under RFP 2026-1030 for comprehensive roof repairs at the Intermediate campus, with an expanded scope via addendum to include a portion of the High School campus facility. The project requires a qualified contractor to provide all labor, supervision, equipment, and materials for a commercial roofing layover. Key technical specifications include the removal of existing gravel, installation of 2.2 inch ISO board for the main area and 1 inch ISO board for the addendum area, and the application of 60mil GAF-TPO or an equivalent system. The scope also encompasses the installation of ten GAF speedtite drains with 4 inch piping, tapered ISO boards at drains, steel deck system patching for caved-in areas, and the installation of proper flashing and pipe boots according to manufacturer specifications. The contract will be awarded based on a competitive solicitation process rather than low price alone, considering factors outlined in the Texas Education Code. Successful bidders must provide a five-year workmanship warranty, general liability insurance, and a standard manufacturer warranty. Proposers must submit a complete packet including mandatory certifications such as the SB 9 Criminal History Record, House Bill 89 Verification, and Senate Bill 252 Certification. All proposals must be submitted in sealed envelopes by October 30, 2026, at 2:30 p.m., with the final award scheduled for November 16, 2026. Bids must remain firm for 60 days following the award date.
GATESVILLE ISD

POSTED

about 11 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

This contract involves the renovation and safety upgrades of two fire towers located at Bear Hill in Brookfield and Burke Mountain in Vermont, on behalf of the Vermont Department of Buildings & General Services and the Agency of Natural Resources. The scope includes implementing structural repairs, installing safety features such as fencing, lightning protection, and railing systems, and repainting all steel elements to match existing colors. Specific work at Bear Hill includes reinforcing stair treads, replacing cab flooring with pressure-treated wood, and removing the existing cab stairwell railing, while Burke Mountain requires installing new railing systems and replacing bolts at certain structural points. An optional scope may extend to installing stairwell railings at additional towers, including Okemo Mountain and others. The project emphasizes adherence to design plans, with provisions for modifications in cooperation with the state's engineer, and includes a contingency fund of 10% of the bid amount for unforeseen changes. Bidders are required to submit sealed electronic bids by November 22, 2024, with mandatory pre-bid meetings and a question period to clarify project details. The project is federally funded, necessitating compliance with prevailing wage laws under the Davis-Bacon Act, and emphasizes adherence to procurement and anti-lobbying regulations, domestic sourcing preferences, and restrictions on Russian-sourced goods. Full bonding is mandatory, and contractor performance evaluations may be conducted for projects exceeding $100,000.

General Info

Place of Performance

VT, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont Office of General Services
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
STATE OF VERMONT Department of Buildings & General Services REQUEST FOR PROPOSALS AGENCY OF NATURAL RESOURCES FORESTS, PARKS AND RECREATION FIRE TOWER IMPROVEMENTS AT BEAR HILL AND BURKE MOUNTAIN BROOKFIELD AND BURKE, VERMONT OCTOBER 2024 INVITATION TO BID DEPARTMENT OF BUILDINGS AND GENERAL SERVICES STATE OF VERMONT Contractors are invited to bid on the Fire Tower Improvements at Bear Hill and Burke Mountain for Buildings and General Services on behalf of the Agency of Natural Resources – Forests, Parks and Recreation in Burke and Brookfield, Vermont. This project consists of, but is not limited to: The contractor shall implement designed improvements at the Bear Hill and Burke Mountain fire towers in accordance with the typical plans and specifications detailed below. The contractor shall prior to executing work determine if the work can be executed directly from the plans or if modifications are necessary. Necessary improvements by tower are listed in the attached assessment report titled “Vermont State Lands Fire Tower Structural Assessment Report”. Typical designs for the additional safety elements are described in a plan set titled “Fire Tower Upgrades”, both developed by Engineering Ventures (hereinafter called EV). If modifications are necessary, the contractor shall engage the State’s engineer and in cooperation with that engineer develop specific solutions for approval by the State and then execute the modified improvements. The contract shall include a contingency amount to address necessary changes to the design as described above. The contingency shall be set at 10 % of the lump sum bid price as submitted. The contingency shall not be a guaranteed payment amount but shall be available to address minor changes in scope and materials due directly to deviations between the designs and physical conditions on site. Payment from the contingency shall only be available following written pre-approval by the state. The bidder shall bid on the project assuming direct application of the standard design. Specific Improvements The state has selected two fire towers for initial treatment - Bear Hill and Burke Mountain. Treatment will include all structural and maintenance items noted for those towers in the report. The referenced report covers all State Fire Towers, this scope of work applies to the two towers detailed below. Work that has already been accomplished is noted in the report in red. Bear Hill, located in Brookfield, Vermont and Burke, located in Burke, Vermont. The scope of repairs for each tower are described below. The additional safety elements developed have typical designs developed by EV and fall into the following categories: fencing (between railing and stair treads and at platform corners), cab railing alongside stairwell opening, and lightning protection. Both Locations: 1. Lightning Protection Contractor shall install lightning protection as described in S-2.5 in the plan set “Fire Tower Upgrades”. 2. Fencing Contractor shall install fencing between all stair railings and steps and in all corner platforms as described in the plan set “Fire Tower Upgrades”. The product described in the drawing set can produce sharp edges where the galvanization has dried improperly. Contractor will be responsible for sanding any sharp edges formed by galvanization or finding a product that has the same specifications but does not produce sharp edges as the galvanization dries. If a comparable product is identified it will need to be approved by FPR. 3. Painting Both towers will be repainted. The contractor will be responsible for cleaning and repainting all steel elements including the frame, stair stringers, railings, window frames, and the interior and exterior of the cab sheet metal siding and roofing. All elements will be power washed prior to paint application. Paint will be color matched to existing grey used on the fire towers, the same paint color will be used at all locations. Paint will be anodic self-priming paint, Super Therm brand or state approved equivalent. Bear Hill Fire Tower: 1. Metal Grating Bear Hill currently has metal grating as stair treads and as the corner platforms. This grating will be left in place. The lowest two sections of stair treads will need to be structurally reinforced per the plans shown in S-2.4 in the plan set “Fire Tower Upgrades”. 2. Cab Flooring • Bear Hill cab flooring will be replaced. Cab flooring shall be two layers. A subfloor of #2 grade or better, 2-inch thickness (nominal), width dimension to match existing. Pressure treated meeting AWPA UC Category UC3B, UC4A, UC4B, or UC4C. Top layer shall be #1 grade or better 1-inch thick (nominal) width dimension to match subfloor, Pressure treated meeting AWPA UC Category UC3B, UC4A, UC4B, or UC4C. Top layer shall be installed perpendicular to sub flooring. All new hardware will be required for replaced elements. • Contractor shall engage with the State’s engineer to ensure compatibility of preservative type with tower material via treatment material selection, isolation, or both. 3. Cab Stairwell Railing System Cab stairwell railing system shall be replaced as described in S-2.3 in the plan set “Fire Tower Upgrades”. Bear Hill has an existing cab stairwell railing system that will need to be removed. It will be the contractor’s responsibility to remove this existing cab stairwell railing system and dispose offsite in accordance with all state laws and regulations. 4. General Maintenance Remaining operable cab window to be bolted shut. Burke Mountain Fire Tower: 1. Metal Grating Burke Mountain fire tower has recently had steps and corner platforms replaced. There will be no replacement of these elements with metal grating at this time. 2. Cab Stairwell Railing Cab stairwell railing system will be installed are described in S-2.3 in the plan set “Fire Tower Upgrades”. 3. General Maintenance • Replace bolt missing at the column splice connection at Level 2 at the northeast corner with ASTM A325 HDG bolt with lock washer and heavy hex nut. Bolt assumed to be ¾” dia. x 1 ½” length but could not be reached to verify in field. • Replace the bolts that were used to add the (2) steel tubes to the side of the frame with HDG ASTM A325 bolts of diameter and length to match existing, (8) total. Remove the two tubes. Optional Add Alternate Scope of Work – The State may elect to award the following scope in this contract. 1. Cab Stairwell Railing Installations Cab stairwell railing systems are described in S-2.3 in the plan set “Fire Tower Upgrades”. These railing systems will be installed at the following fire towers: Spruce Mountain, Elmore Mountain, Okemo Mountain, Bald Mountain, and Mt. Olga. Okemo Mountain has existing cab stairwell railing systems that will need to be removed and replaced in accordance with fire tower upgrade specifications. It will be the contractor’s responsibility to remove these older cab stairwell railing systems and dispose offsite in accordance with all state laws and regulations. Sealed Bids accompanied by proper Bid Security will be received by email to the Department of Buildings and General Services at contact@example.gov until November 22, 2024, at 4:30 PM. Documents may be obtained from Blueprints Etc, 20 Farrell Street, South Burlington VT 05403, by phone at 802- 865-4503, by fax at +1 (555) 000-0000 or email to: contact@example.gov. Project Manuals and Plans are available for preview at: http://www.blueprintsetc.com in the Public Plan Room. Any and all notifications, releases and addendums associated with this project will be posted at http://www.blueprintsetc.com. There is a non-refundable fee for each set of documents purchased. Fee to Include one (1) Hard Copy & one (1) Digital CD-ROM Copy: $TBD 1. Please be advised that all notifications, releases, and addendums associated with this RFP will be posted on-line in the plan room where the original solicitation resides unless otherwise determined that a hard copy is necessary. The state will make no attempt to contact contractors with updated information. It is the responsibility of each contractor to periodically check the posting site for any and all notifications, releases and addendums associated with the RFP. 2. NOTE: On occasion hard copy addendums may be required due to size or type of media/requirements. If applicable and as determined by the Department of Buildings and General Services, addendums that require hard copy distribution, a copy of such addenda will be mailed or delivered for each set of plans and specifications issued to the bidders, prior to the bid date. However, it is the responsibility of the bidder to be sure they have received all addenda and must so state the number of addenda they have received on the proposal. 3. If Bidders choose to pull information from other third-party sites, Bidders’ do so at their own risk as there is one official source of information for documents as indicated above. There will be a mandatory pre-bid meeting at the site on November 1, 2024 at 10:00AM. Bidders are to meet at the gate of Allis State Park located at 284 Allis State Park Road in Randolph, Vermont. QUESTION AND ANSWER PERIOD: Any vendor requiring clarification of any section of this RFP or wishing to comment or take exception to any requirements of the RFP must submit specific questions in writing to contact@example.gov no later than 4:30 PM on November 12, 2024. All questions should include Fire Tower Improvements at Bear Hill and Burke Mountain Project in the subject line. Any comments, questions, or exceptions not raised in writing on or before the last day of the question period are waived. At the close of the question period a copy of all questions or comments and the State's responses will be posted at http://www.blueprintsetc.com. Every effort will be made to post this information as soon as possible after the question period ends, contingent on the number and complexity of the questions. Bidder’s attention is directed to: 1. General Conditions for Construction Contracts. It is the Bidder’s responsibility to thoroughly read and comply with all requirements. Please pay close attention due to changes that have been made. 2. Funding Source: This project is being funded using federal monies (Economic Development Authority and Federal Highway Administration – RTP) and shall require compliance with the Davis-Bacon Act. Wages shall be paid using rates no less than those established under the Davis-Bacon prevailing wage rates. Complete information related to Davis-Bacon and Related Acts is available at: http://www.dol.gov/whd/contracts/dbra.htm . SOV business users must take affirmative steps that include at least the following Socioeconomic affirmative steps per 2 C.F.R. § 200.321: 1. Placing qualified small and minority businesses and women’s business enterprises on solicitation lists; 2. Assuring that small and minority businesses and women’s business enterprises are solicited whenever they are potential sources; 3. Dividing total requirements, when economically feasible, into smaller tasks or quantities to permit maximum participation by small and minority businesses, and women’s business enterprises; 4. Establishing delivery schedules, where the requirement permits, which encourage participation by small and minority businesses, and women’s business enterprises; 5. Using the services and assistance, as appropriate, of such organizations as the Small Business Administration and the Minority Business Development Agency of the Department of Commerce; and 6. Requiring the prime/general contractor, if subcontracts are to be let, to take the same affirmative steps as listed in numbers 1 through 5. If a bidder requires assistance in preparing their proposal, registering with SAM.gov or needs guidance on socioeconomic certifications, the bidder may contact the Agency of Commerce & Community Development (ACCD), Department of Economic Development (DED), APEX Accelerator. The Vermont APEX Accelerator (formerly the Procurement Technical Assistance Center (PTAC)) specializes in helping small businesses navigate the documentation associated with State and Federal procurement. There is no cost to the Contractor for assistance provided by APEX Accelerator. Their website is: https://accd.vermont.gov/economic-development/programs/ptac 3. BYRD ANTI-LOBBYING CERTIFICATION Contractor has provided the certification required by the Byrd Anti-Lobbying Amendment, 31 U.S.C. § 1352 (as amended, and will follow the requirements for certification of each lower tier (subcontract) to disclose any lobbying with non-federal funds that takes place in connection with obtaining any federal award. Such disclosures will be forwarded from tier to tier up to the Contractor who in turn will forward the certification(s) to the federal awarding agency. 4. DOMESTIC PREFERENCE FOR PROCUREMENTS As appropriate, and to the extent consistent with law, the contractor should, to the greatest extent practicable, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States. This includes, but is not limited to iron, aluminum, steel, cement, and other manufactured products. For purposes of this clause: Produced in the United States means, for iron and steel products, that all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States. Manufactured products mean items and construction materials composed in whole or in part of non-ferrous metals such as aluminum; plastics and polymer-based products such as polyvinyl chloride pipe; aggregates such as concrete; glass, including optical fiber; and lumber.” 5. NOTICE TO BIDDERS – PROHIBITION OF RUSSIAN GOODS: The Contractor is hereby notified that, pursuant to Vermont Executive Order No. 02-22, dated March 3, 2022, the purchase of Russiansourced goods and goods produced by Russian entities (defined as institutions or companies that are headquartered in Russia or have their principal place of business in Russia) is prohibited. The awarded Contractor must fill out and sign the Executive Order 02-22 Vendor Certification as part of the Contract awarding process. This certification is required for all subcontracts for work performed solely for the State of Vermont and subcontracts for work performed in the State of Vermont. 6. BID SUBMISSION INSTRUCTIONS: a. CLOSING DATE: Bids must be received by the State by the due date specified on the front page of this RFP. Late bids will not be considered. i. The State may, for cause, issue an addendum to change the date and/or time when bids are due. If a change is made, the State will inform all bidders by posting at the webpage indicated on the front page of this RFP. ii. There will not be a public bid opening. However, the State will record the name, city and state for any and all bids received by the due date. b. BID DELIVERY INSTRUCTIONS: i. ELECTRONIC: Electronic bids will be accepted. ii. E-MAIL BIDS. Emailed bids will be accepted. Bids will be accepted via email submission to contact@example.gov. Bids must consist of a single email with a single, digitally searchable PDF attachment containing all components of the bid. Multiple emails and/or multiple attachments will not be accepted. There is an attachment size limit of 40 MB. It is the Bidder’s responsibility to compress the PDF file containing its bid, if necessary, in order to meet this size limitation. iii. FAX BIDS: Faxed bids will not be accepted. iv. PAPER BIDS: Paper format bids will not be accepted. 7. Full Bonding is required for this job. 8. CONSTRUCTION CONTRACTOR EVALUATION FORM: The Department of Buildings and General Services (BGS) may require contractor evaluations on construction projects over $100,000 or at the discretion of the BGS Director. Evaluations will be used to compile a contractor’s performance on BGS projects to provide a history and assessment of the contractor’s performance. 9. It is the Bidder’s responsibility to thoroughly read and comply with all instructions and requirements of this bid solicitation.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS