Anzar Road Culvert Emergency Repair Project (Incidental Take Permit, 2081-2025-035-R4)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Anzar Road Culvert Emergency Repair Project involves the urgent restoration of a 7-foot diameter, 1,000-foot long corrugated metal pipe culvert located under US Route 101 and Anzar Road in San Benito County. The project is necessitated by advanced degradation, including the loss of the culvert invert and the formation of a sinkhole in the embankment. The scope of work includes installing rock slope protection, replacing flared end sections, relocating utilities, vegetation trimming and removal, and implementing temporary stream diversion and dewatering. The project is being executed in 2025 under an Emergency Force Account following a Director's Order Request from Caltrans District 5. To facilitate these repairs, the California Department of Fish and Wildlife issued Incidental Take Permit No. 2081-2025-035-04, authorizing the incidental take of the threatened California tiger salamander. The project is expected to cause a temporary loss of approximately 1.49 acres of upland habitat, including oak and riparian woodlands. To mitigate these impacts, the project requires the establishment of avoidance zones, permanent habitat protection, worker education, and the submission of monthly compliance reports. The project is granted a statutory exemption under CEQA as it involves immediate action to prevent damage to public infrastructure.

General Info

Caltrans emergency-repairs culvert under US 101, incidentally taking threatened tiger salamanders per state permit, bypassing bid process for public safety.

Agency

California → Fish and Wildlife, Region 4 - Central, Fresno

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Anzar Road Culvert Emergency Repair Project ITP 2081-2025-035-04

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 4 - Central, Fresno
Contacts1 person available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 4 - Central, Fresno
Office AddressN/A
Contacts
Mindy TraskSenior Environmental Scientist, Specialist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has issued an Incidental Take Permit (ITP) No. 2081-2025-035-04 authorizing Caltrans to incidentally take California tiger salamander (Ambystoma californiense) which is designated as a threatened species under the California Endangered Species Act (Fish & G. Code § 2050 et seq.; Cal. Code Regs. tit. 14 § 670.5, subd. (b)(3)(G)). The Project involves the emergency repair of a 7-foot diameter, approximately 1,000-foot-long corrugated metal pipe culvert that has experienced advance degradation including erosion and loss of the invert (bottom of the culvert), and a sinkhole has formed in the embankment above the culvert inlet. The Project also includes the installation of rock slope protection, replacement of flared end sections, utility relocation, equipment access and staging, vegetation trimming and removal, as well as temporary stream diversion and dewatering. The Project is expected to cause the temporary loss of approximately 1.49 acres of upland habitat for California tiger salamander due to vegetation removal and temporary ground disturbance associated with constructing features, access, and staging. Approximately half of the impact involves removal of oak and riparian woodland habitats that are expected to take five or more years to restore species habitat to pre-construction conditions.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS