Apache Avenue Decompaction and Delineation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The California Tahoe Conservancy is undertaking internal land management activities on parcel AN 034-084-004 adjacent to 1941 Apache Avenue in South Lake Tahoe, California, to restore soil health and prevent future unauthorized vehicle access. The work includes decompacting soil in areas impacted by illegal parking and installing single-rail fencing along the full property perimeter, along with vehicle barrier posts at the front entrance to deter encroachment. This project qualifies for categorical environmental exemptions under California Code of Regulations Title 14, Sections 15303 and 15304, which permit minor land alterations and small structure construction without full environmental review. There is no competitive bidding process, and the project is executed as an internal administrative action, with no external contractor engaged. The contract is classified as a forecast and lacks formal pricing, CLINs, or federal accounting identifiers such as TAS or AAC, reflecting its non-competitive, agency-led nature. Administrative execution is conducted via electronic signature through DocuSign, with key personnel Haley Lazar, Environmental Planner, serving as the primary point of contact and COTR, and Kevin Prior, Director of the Land Division, acting as the approving authority and PCO. The sole documentation required is a two-page PDF submission, with no additional volumes, format restrictions, or page limits specified. No standard Federal Acquisition Regulation clauses, packaging requirements, inspection criteria, invoicing methods, or socioeconomic certifications apply, as this is not a federal procurement. The place of performance is strictly within South Lake Tahoe, and delivery or performance schedules are not formally defined, with the execution dates of January 20–26, 2026, marking administrative clearance rather than work timelines. Environmental compliance through CEQA exemptions is the primary regulatory framework guiding the project, replacing typical federal contract clauses and oversight mechanisms.
General Info
Agency
NAICS
Place of Performance
South Lake Tahoe, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
