Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Agriculture was posted on June 11, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Aquatic Passage Battle Creek

Closed
AG-04R3-S-09-0006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, and kitchen/BCT areas. Additionally, the contractor must repair five storm sewer drain structures and five potholes, ensuring all work meets industry standards and proper drainage grades. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, and submission requires a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and proof of a mandatory physical site visit. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance with Construction Wage Rate Requirements (CWRR) is mandatory, requiring weekly certified payroll and adherence to prevailing wage determinations. Final payment is contingent upon a successful final inspection and the submission of operation and maintenance manuals.
Joliet Job Corps

POSTED

about 6 hours ago

DEADLINE

in about 22 hours
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 7 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
2027022
Solicitation # 2027022
RFP# 2027022 is a unit price solicitation issued by the Spartanburg County Government in South Carolina for the Twin Tier 3 Subdivision Reclamation project, specifically focusing on Group 1, which includes the Timberlake and Wicklow areas. The scope of work involves roadway improvements and reclamation, with key pay items including the removal and disposal of existing asphalt pavement, the application of maintenance stone, 8-inch full depth patching, and wrecker services. Technical specifications require adherence to SCDOT Standard 401.3.19.2, specifically mandating the use of a sloped edge longitudinal shoulder joint attachment for all surface mixtures placed at 150 lb/sq yd or greater to ensure a consolidated wedge-shaped pavement edge between 25 and 35 degrees. The contract is administered as a unit price agreement where final payment is based on field-verified quantities of work performed. Proposers must maintain statutory worker's compensation and commercial general liability insurance of at least $1 million, naming Spartanburg County as an additional insured. Proposals must be binding for 60 days and are subject to the South Carolina Freedom of Information Act. Award eligibility is contingent upon the proposer's certification of non-debarment by the State of South Carolina, compliance with federal civil rights and labor laws, and the absence of conflicts of interest. Payment for undisputed invoices is due upon receipt and considered past due after 30 days, with no interest accruing on late payments.
Spartanburg County Government

POSTED

about 8 hours ago

DEADLINE

in 9 days

General Info

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

North Fork Ranger District, UKIAH, OR, USA

Set-Aside

HZC

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Umatilla National Forest R6
Contacts1 person available
OfficePENDLETON, OR, 97801, USA
Office AddressPENDLETON, OR, 97801, USA
Contacts
Peggy K. PattenContract Specialist

Full Description

Show more
Synopsis Solicitation Number AG-04R3-S-09-0006 Response Date: July 15, 2009 Solicitation Issue Date: June 15, 2009 Set-Aside: 100% HUBZone Firms NAICS: 237310 Highway, Street and Bridge Construction, $31.0 million BATTLE CREEK FISH PASSAGE IMPROVEMENT PROJECT This solicitation is for fish passage improvement construction project on the North Fork Ranger District (Ukiah, Oregon) of the Umatilla National Forest. The Battle Creek culvert replacement project is a fish passage improvement project that includes the removal of the existing culvert and the installation of an approximately 19-0 Span Pipe Arch, 110 feet in length, precast footing and streambed simulation material inside the new structure. Performance of this contract will be completed between July 15th and August 15th (instream work window). An extension to September 1st instream work window has been requested, but at this time has not been approved. Project location: project is located on Forest Road 10; starting from the Junction of Hwy 395 and Hwy 244 near Ukiah continue South on Hwy 395 approximately 12 miles, turn left on Forest Road 55. Continue on Forest Road 55 approximately 0.25 miles, right turn on Forest Road 10. Continue on Forest Road 10, 16.2 miles to Battle Creek, project location. Township 8 South, Range 33 East, Section 20. Estimated Start Work Date is: July 23, 2009 PLEASE NOTE: Solicitation date has been changed to 6/15/2009, Response Date has been changed to 7/15/09, Start Work Date has been changed to 7/23/2009. PLEASE NOTE: An extension to September 1st instream work windows has been requested and has now been approved.

More opportunities from Department Of Agriculture → Umatilla National Forest R6

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS