Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from California was posted on May 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Arcade Creek Bridge at Watt Ave Scour Repair

Closed
B26151111021State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves performing several construction and repair tasks on the Arcade Creek Bridge at Watt Ave to address scour issues. The work includes extending the end diaphragms and return walls at the original abutments down approximately 5 feet to reach a total depth of 8 feet. After these extensions are installed, backfill behind the original abutments will be reconstructed. Additionally, an approach slab drainage system will be installed along with structure approach slabs that have been modified for length, specifically 10 feet at bridge widenings and about 18 feet 9 inches at the original bridge. Slope protection will be reconstructed with slopes ranging from 1.5:1 to as steep as 1:1, and benches at the top of the slope protection will be eliminated. The contract also requires the replacement of pull boxes and electrical conduit associated with street lighting near the southeast corner of the bridge. The scope of concrete placement and slope protection repairs shown in the drawings is not exhaustive, with the final work limits subject to determination by the Engineer based on field observations during construction. Any additional work not described in the proposal items will be compensated separately as additional work. The contract requires a bid bond of 10%. This project is administered by the Public Works Department - Engineering Services Department of the City of Sacramento, California, with Raquel Gonzalez serving as the primary contact. The solicitation was posted on May 13, 2026, with a response deadline of June 3, 2026.

General Info

Repair and extend bridge abutments, install drainage, replace electrical conduit, slope protection reconstruction.

Agency

California → Public Works Dept - Engineering Services Department of City of Sacramento

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

915 I Street, Room 2000 Sacramento, California 95814, CA, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Contract opportunity posted

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works Dept - Engineering Services Department of City of Sacramento
Contacts1 person available
OfficeCA, US
Organization / Agency
California → Public Works Dept - Engineering Services Department of City of Sacramento
Office AddressCA, US
Contacts
Raquel GonzalezContact

Full Description

Show more
Scope: The following items of work are to be performed in these Special Provisions: Extend end diaphragms and return walls at each original abutment down approximately 5 feet to a total depth of 8 feet.
Reconstruct backfill behind original abutments from above after installation of end diaphragm and return wall extensions.
Install an approach slab drainage system.
Install structure approach slabs, modified for length (10 feet at the widenings and approximately 18’-9” at the original bridge).
Reconstruct slope protection to a 1.5:1 or as steep as 1:1 slope.
Eliminate benches at top of slope protection.
Replace pull boxes and electrical conduit for street light near southeast corner of bridge.
The extent of the concrete placement and slope protection repair work, as depicted on the drawings, is not intended to be all-inclusive. Actual limits for the work will be defined by the Engineer, based on field observation as the work progresses. Full compensation for work not covered under the proposal items described herein shall be paid for as “additional work”.
Bid Bond: 10.00%