Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Massachusetts was posted on June 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Call 001 612004-133792

Closed
612004-133792State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Federal
ID FLAP ADA 2019(1), Western Heritage Byway - Swan Falls Road
Solicitation # 69056726R000010
This contract opportunity is issued under the Idaho, Montana, and Surrounding Areas MATOC IDIQ vehicle for a federally funded transportation project along the Western Heritage Byway – Swan Falls Road, located approximately seven miles south of Kuna, Idaho. The work involves comprehensive highway improvements including shoulder widening, paving, signage installation, parking lot enhancements, and culvert replacements over a stretch of up to 8.5 miles. The project is structured with four separate bid schedules, but only one will be awarded under a Firm-Fixed-Price task order. Estimated value ranges between $5 million and $10 million, with a tentative solicitation date in summer 2026 and planned completion by summer 2027. Performance is governed by the Federal Highway Administration’s Standard Specifications for Construction of Roads and Bridges (FP-24), along with FLH Standards 619-3 and 635-1, which dictate material, construction, and traffic control requirements. Detailed plans, including permanent traffic control layouts and pavement marking details, are available as attachments. The contract will be administered by the Western Federal Lands Division of the Department of Transportation, based in Vancouver, Washington, with inquiries directed to the contracting office. Only prequalified IDIQ contractors eligible under the MATOC program may respond, and interested parties must register on SAM.gov to access the Interested Vendors List. No evaluation factors, contract clauses, representations, certifications, or detailed pricing structure beyond the estimated range have been published at this pre-solicitation stage. Notification of solicitation posting is available by following the opportunity on SAM.gov.
690567 Western Federal Lands Division

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
I-84: Emigrant Hill WIM Site Repaving Project
Solicitation # S-73000-00017767
The I-84 Emigrant Hill WIM Site Repaving Project, solicitation S-73000-00017767, is a state-funded public improvement contract issued by the Oregon Department of Transportation. The project involves replacing weight-in-motion detection at mile post 227.54 westbound, requiring full depth continually reinforced concrete pavement repair and the temporary removal of median concrete barriers to maintain two-way traffic on the eastbound side. The scope includes mobilization, traffic control, excavation, electrical systems installation, and the use of agency-furnished materials such as sensors and cameras. The project is scheduled to start no earlier than April 1, 2027, with substantial completion by June 18, 2027, and final completion by June 25, 2027. A critical performance requirement mandates that the removal, installation, and activation of the WIM system be completed within 21 consecutive calendar days once the system is taken out of service. Award will be granted to the responsible bidder submitting the lowest responsive bid. Bidders must be certified with the Confederated Tribes of the Umatilla Indian Reservation Tribal Employment Rights Office and adhere to a 15% Indian Employment Preference Goal. The contract requires compliance with BOLI prevailing wage rates, State Buy America requirements for steel and iron, and ADA standards. Submission must be made via OregonBuys, including a bid security equal to 10% of the total bid amount. Performance and payment bonds are required upon award. Quality control is emphasized through specific material packaging requirements for geosynthetics and rigorous compressive strength testing for hardened concrete.
Procurement

POSTED

about 20 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The Mystic River Bicycle and Pedestrian Bridge Design-Build project, located in District 4, Massachusetts, is a $53 million initiative led by the Massachusetts Department of Transportation (MassDOT) under solicitation number 612004-133792, with proposals due June 26, 2026. The project follows a Best Value Design-Build selection process, where award is determined by the lowest cost per quality point, with technical approach weighted at 67% and project management and coordination at 33%. The scope includes full design and construction of a new bicycle and pedestrian bridge crossing the Mystic River, requiring compliance with the 2026 edition of MassDOT Standard Specifications for Highways and Bridges, AASHTO LRFD Bridge Design Specifications, and numerous federal and state regulations. Key deliverables encompass structural design for moment slabs on MSE walls, fabrication shop drawings for steel and precast concrete, and comprehensive O&M manuals bound in heavy-duty nickel-plated binders with specific dimensions and labeling requirements. The bridge must feature LED lighting with IP66, IK10, and 3G vibration ratings, CCTV systems, police call boxes, and bearings, all meeting NEMA 4X and 3R standards for electrical enclosures. Environmental and regulatory compliance is extensive, requiring adherence to NEPA, Section 106 of the National Historic Preservation Act, US Army Corps of Engineers Section 404 and 408 permissions, MassDEP Chapter 91 and 401 water quality certification, and the Massachusetts Wetlands Protection Act, with active coordination with Everett and Somerville Conservation Commissions. A suite of environmental documentation, including NOAA biological assessments, USCG bridge permit applications, and SHPO concurrence letters, has been prepared and must be addressed in proposals. The contractor must also implement a Stormwater Pollution Prevention Plan, Hazardous Materials Management Plan, Health and Safety Plan, and Groundwater and Soil Management Plan in accordance with federal and state requirements. The project prohibits copyrighting any work product developed under the agreement, with all designs and materials becoming the sole property of MassDOT without restriction. The anticipated Notice to Proceed is October 7, 2026, with milestones requiring field completion within 1,029 calendar days, substantial completion by day 989, and full beneficial use by day 958. MassDOT will provide a $112,000 stipend to

General Info

Design-build contract for Mystic River bike-pedestrian bridge linking Everett and Somerville, MA.

Agency

Massachusetts → MASSDOTView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

District 4, MA, USA

Set-Aside

NONE

Documents

(34)

document

HTML

document

HTML

document

HTML

EVERETT-SOMERVILLE-612004-133792-A-8R.pdf

PDF

EVERETT-SOMERVILLE Mystic River Bicycle and Pedestrian Bridge Design-Build Addendum No. 4

PDFamendment

EVERETT-SOMERVILLE Mystic River Bicycle and Pedestrian Bridge Design-Build Addendum No. 3

PDFamendment

document

HTML

document

HTML

document

HTML

EVERETT-SOMERVILLE-612004-133792-A-9.pdf

PDF

document

HTML

EVERETT-SOMERVILLE-612004-133792-A-10.pdf

PDF

612004-133792_Insurance Forms for Execution.pdf

PDF

EVERETT-SOMERVILLE Mystic River Bicycle and Pedestrian Bridge Design-Build Addendum No. 6

PDFamendment

document

HTML

document

HTML

Addendum No. 1 to Everett-Somerville Mystic River Bicycle and Pedestrian Bridge RFP

PDFamendment

document

HTML

document

HTML

document

HTML

document

HTML

document

HTML

EVERETT-SOMERVILLE Mystic River Bicycle and Pedestrian Bridge Design-Build Addendum No. 5

PDFamendment

document

HTML

document

HTML

EVERETT-SOMERVILLE-612004-133792-A-7.pdf

PDF

document

HTML

document

HTML

612004-133792_Contractor Forms for Execution.pdf

PDF

document

HTML

612004-133792_ Insurance Forms (Professionsal Liability) for Execution.pdf

PDF

document

HTML

document

HTML

Addendum No. 2 to RFP 612004-133792 Everett-Somerville Mystic River Bicycle and Pedestrian Bridge Design-Build

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → MASSDOT
ContactsNo contacts available
OfficeMA, USA
Organization / Agency
Massachusetts → MASSDOT
View Agency Profile
Office AddressMA, USA
ContactsNo contact information available

Full Description

Show more
Mystic River Bicycle and Pedestrian Bridge Design-Build [EVERETT -SOMERVILLE ]

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS