This Solicitation opportunity from Pennsylvania was posted on September 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
2026 Road Program Kennedy Township
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The 2026 Road Program for Kennedy Township, Pennsylvania, is a mill-and-overlay resurfacing project covering five roadway segments: Rose Avenue, Terra Drive, Warbler Drive, Wren Drive, and Rossi Drive. The scope of work requires milling existing bituminous pavement to a depth of two inches from gutter to gutter, performing base repairs as directed by the engineer, adjusting utilities and manholes, and placing a two-inch Superpave asphalt wearing course. The contractor is responsible for all mobilization, maintenance and protection of traffic, restoration of disturbed lawns, and replacement of pavement markings. The project is divided into two base bids, with the 2026 construction phase anticipated to run from October 12 to December 11, 2026, and the 2027 phase scheduled from April 1 to May 31, 2027. Bids must be submitted electronically via PennBid and include a 10% bid security, a consent of surety, and various corporate and nondiscrimination certifications. The successful bidder must provide performance and payment bonds for 100% of the contract value, as well as a two-year maintenance bond upon completion. The project is subject to the Pennsylvania Prevailing Wage Act and Title II of the Americans with Disabilities Act. Remington & Vernick Engineers will provide full-time inspection during normal working hours. Award decisions will be based on the lowest responsible bidder, with evaluations considering the contractor's competency, financial integrity, and past performance. Final payment is generally issued within 30 days of final acceptance, contingent upon the submission of all required warranties and a Certification of Site Safety Conditions.
General Info
Place of Performance
Select County and State, PA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (29)
See All 29 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Scope of work includes milling the existing pavement to a depth of two inches across the full roadway width gutter to gutter, performing base repairs where directed, adjusting existing manholes, inlets, and utilities, repairing asphalt wedge curb as needed, and placing a two-inch Superpave asphalt wearing course from curb to curb. The contractor is also responsible for maintenance and protection of traffic throughout the project, restoration of any disturbed lawn or grass areas, and replacement of pavement markings removed or disturbed during construction.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS