This Solicitation opportunity from Colorado was posted on November 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Pueblo has issued solicitation 26-009 for the West Side Improvements Project, which primarily involves the construction of Sun Mountain Boulevard. This project consists of building a new 0.75-mile, two-lane roadway connecting 31st Street and 24th Street, featuring ADA-compliant curb ramps, storm sewers, water mains, and a double box culvert at the Wildhorse Creek Drainageway. The broader initiative also includes three bus stop packages covering 67 locations to enhance community connectivity and economic vitality. The project is funded through a Rebuilding American Infrastructure with Sustainability and Equity (RAISE) Grant from the U.S. Department of Transportation Federal Highway Administration (FHWA).
The contract is awarded to the responsible bidder with the lowest and most responsive total base bid plus any selected alternates. Key compliance requirements include adherence to the Davis-Bacon Act for prevailing wages, Build America Buy America (BABA) domestic sourcing preferences, and Title VI of the Civil Rights Act. Contractors must provide a bid bond for 5 percent of the grand total and furnish performance and payment bonds within ten business days of the notice to execute the contract. Additionally, the contractor is required to complete at least 100 hours of workforce development and labor-management partnership training. Work must commence within three calendar days of contract execution, with a project duration of 365 days.
General Info
City of Pueblo project for Sun Mountain Boulevard construction funded by RAISE Grant.
HighAI Summary for 26-009 Construction of Sun Mountain Boulevard - Standard Special Provisions: Standard Special Provisions for the construction of Sun Mountain Boulevard (Project 26-009) by the Colorado Department of Transportation. The document provides specific revisions to standard specifications, including General Provisions (Section 101), Buy America/BABA requirements (Section 106), Clearing and Grubbing (Section 201), and other technical requirements for excavation, paving, and concrete. It includes specific mandates on water source legality and federal-aid highway funding compliance.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Construction of Sun Mountain Boulevard (26-009): Public Improvement Invitation for Bid (IFB) issued by the City of Pueblo on September 22, 2026, for the construction of a new 0.75-mile, two-lane roadway connecting 31st Street and 24th Street. The project includes ADA compliant ramps, storm sewers, water mains, and a double box culvert at Wildhorse Creek Drainageway. Funded by a FHWA RAISE Grant, the project requires compliance with the Davis-Bacon Act. Bids are due electronically by November 4, 2026, at 10:00 am.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Construction of Sun Mountain Boulevard (IFB #26-009): Public Improvement Invitation for Bid (IFB #26-009) issued by the City of Pueblo on September 22, 2026. The project involves constructing a new 0.75-mile, two-lane roadway connecting 31st Street and 24th Street, including ADA compliant ramps, storm sewers, and a double box culvert. Funded via a FHWA RAISE Grant, the project requires compliance with the Davis-Bacon Act. Bids are due by November 10, 2026, at 10:00 am.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Construction of Sun Mountain Boulevard (IFB #26-009): Public Improvement Invitation for Bid (IFB) #26-009 issued by the City of Pueblo on September 22, 2026. The project involves the construction of a new 0.75-mile, two-lane roadway connecting 31st Street and 24th Street, including ADA compliant ramps, storm sewers, and utility lines. Funded via a FHWA RAISE Grant, the project requires compliance with the Davis-Bacon Act. Bids are due electronically by November 4, 2026, at 10:00 am.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Construction of Sun Mountain Boulevard (Project No. 26-009): Public Improvement Invitation for Bid (IFB) issued by the City of Pueblo on September 22, 2026, for the construction of a 0.75-mile, two-lane roadway connecting 31st Street and 24th Street. The project includes ADA compliant ramps, storm sewers, water mains, and a double box culvert at Wildhorse Creek Drainageway. Funded via a FHWA RAISE Grant, the project requires compliance with the Davis-Bacon Act. Bids are due electronically via OpenGov by November 4, 2026, at 10:00 am.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Examples of Workforce Development & Labor-Management Partnership Training Programs: This document provides an illustrative list of approved workforce development and labor-management partnership training programs that contractors may utilize. It categorizes acceptable training into seven areas: skills-upgrade, safety and compliance, industry-recognized certifications, LMP programs, workforce system-based training, small business technical assistance, and career pathway/pre-employment programs.
PDF
PDF, High priority: read this first10 pages · wage-determination
HighAI Summary for Federal Labor Standard Provisions for Construction Contracts: This document outlines the Federal Labor Standards Provisions applicable to construction contracts assisted by the United States government. It details requirements for minimum wages and fringe benefits for laborers and mechanics, including payment frequency, wage determination adherence, and posting obligations. The document covers classifications of labor, conformance procedures for unlisted classifications, and rules for fringe benefits not expressed as hourly rates. It also addresses unfunded plans and contractor obligations regarding wage payments and interest on unpaid wages. The provisions ensure compliance with the Davis-Bacon Act and related regulations, providing guidance for contracting officers and contractors on wage standards and classifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for FHWA-1273 Contract Provisions for Federal-Aid Construction Contracts: Revised June 25, 2026, this document provides the standard contract provisions for Federal-aid construction contracts. It outlines mandatory requirements including nondiscrimination, Davis-Bacon Act wage standards, safety, and environmental compliance. It specifies that while physical incorporation into subcontracts is now optional for contracting agencies, compliance with these provisions remains mandatory for prime contractors and subcontractors.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for FHWA Construction Oversight Checklist: A comprehensive construction oversight checklist for FHWA direct projects, revised for Addendum 2. The document outlines administrative requirements, civil rights compliance (EEO, payroll, and sublet permits), and materials testing responsibilities for the City and Contractor.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for FHWA Construction Oversight Checklist - IFB: A comprehensive construction oversight checklist for FHWA direct projects. The document outlines administrative requirements, civil rights compliance (including EEO and OJT forms), materials testing and certification (Buy America), and final project documentation requirements.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for General Decision Number CO20260008: Wage determination for highway construction projects in El Paso, Pueblo, and Teller counties, Colorado. This document (Modification 1, dated 05/18/2026) specifies prevailing wage rates and fringe benefits for various labor classifications, including electricians, power equipment operators, truck drivers, and cement masons. It also includes notices regarding Executive Orders 13706 and 13658 concerning paid sick leave and minimum wage requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Geotechnical Evaluation Report - Sun Mountain Blvd Pueblo (Rev 1): Revision 1 (August 6, 2025) of a geotechnical evaluation report prepared by Vivid Engineering Group, Inc. for Bolton & Menk, Inc. regarding the West Side Improvements of Sun Mountain Boulevard in Pueblo, CO. The document provides critical technical specifications including subsurface conditions, pavement design parameters, foundation systems, and construction recommendations.
PDF
PDF, High priority: read this first13 pages · q-and-a
HighAI Summary for IFB 26-009 Construction of Sun Mountain Boulevard - Q&A Report: Question and Answer report for Invitation for Bid (IFB) No. 26-009 (DT2401) regarding the construction of Sun Mountain Boulevard for the City of Pueblo. The document contains 20 technical clarifications dated between September 23 and October 16, 2026, covering topics such as material substitutions (RCP vs. ADS HPPP), BABA compliance, utility conflicts, asphalt specifications, and payment items. The response deadline is November 4, 2026.
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB #26-009 (DT2401) - Construction of Sun Mountain Boulevard: Invitation for Bid (IFB) issued by the City of Pueblo on September 22, 2026, for the construction of a new 0.75-mile, two-lane roadway connecting 31st Street and 24th Street. The project includes ADA compliant ramps, storm sewers, water mains, and a double box culvert. Funded via a FHWA RAISE Grant, the project requires compliance with the Davis-Bacon Act. Bid responses are due electronically by October 21, 2026, at 10:00 am.
PDF
PDF, High priority: read this first8 pages · contract-document
HighAI Summary for Sample Contract Documents - City of Pueblo: This document contains sample contract documents for a construction project by the City of Pueblo. It includes a Notice of Award, Contract Agreement, Performance Bond, and Payment Bond. The Contract Agreement outlines the obligations of the City and Contractor, referencing bid numbers, project specifications, and legal provisions. The Performance Bond and Payment Bond sections provide surety guarantees for contract performance and payment. The document is intended to formalize the contract execution and ensure compliance with terms, bonds, and legal requirements.
PDF
PDF, High priority: read this first8 pages · contract-document
HighAI Summary for Sample Contract Documents for CDOT Projects - Notice of Award and Contract Agreement: This document contains sample contract documents for CDOT projects including a Notice of Award, Contract Agreement, Performance Bond, and Payment Bond. The Notice of Award notifies the contractor of bid acceptance and requirements for contract execution and bonds. The Contract Agreement outlines the terms between the City of Pueblo and the contractor, including project details, obligations, incorporated documents, and legal provisions. The Performance Bond section guarantees faithful performance of the contract and indemnifies the City. The document is a comprehensive contract package intended for formalizing construction project agreements with the City of Pueblo.
PDF
PDF, High priority: read this first16 pages · policy-guide
HighAI Summary for Section 3 Utilization Plan - City of Pueblo HUD Compliance Guide: This document is an orientation guide for contractors, developers, and sub-grantees working with the City of Pueblo on projects covered under Section 3 of the Housing and Urban Development Act of 1968. It outlines the City's policies and procedures to ensure compliance with Section 3 regulations, which require employment and contracting opportunities for low- and very low-income persons and businesses on HUD-funded projects. The guide explains the definition of Section 3 workers and business concerns, applicable project thresholds, employment and contracting goals, and record-keeping requirements. It serves as a summary of the Act and regulations, emphasizing the City's commitment to directing economic opportunities to eligible individuals and businesses in accordance with federal law and the City's Consolidated Plan for Housing and Community Development.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Sun Mountain Boulevard Extension Mitigation Tracking Spreadsheet: A mitigation commitment monitoring and reporting document for the Colorado Department of Transportation's Sun Mountain Boulevard Extension project. It outlines specific environmental and regulatory commitments across 11 categories, including air quality, floodplains, wetlands, and cultural resources, assigning responsibility to the Contractor or City of Pueblo and specifying the life cycle phase for implementation.
PDF
PDF, High priority: read this first4 pages · specifications
HighAI Summary for Sun Mountain Boulevard Extension - Revised Plan Sheets: Revised plan sheets and Summary of Approximate Quantities (SAQ) for the Sun Mountain Boulevard Extension project. The document includes a detailed bid schedule with item numbers and quantities for clearing, excavation, paving, and utility installation, as well as typical roadway sections and utility plans. Dated October 8, 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Sun Mountain Boulevard - Standard Special Provisions (Revised for Addendum 2): Standard Special Provisions for the construction of Sun Mountain Boulevard (Project 26-009) by the Colorado Department of Transportation. This document contains specific revisions to the 2025 Spec Book, including updates to General Provisions (Section 101), Buy America/BABA requirements (Section 106), Clearing and Grubbing (Section 201), and other technical sections. It includes critical definitions for approved water sources and detailed instructions for clearing, grubbing, and disposal of materials.
XLSX
XLSX, Low priority2 pages · industry-day
LowAI Summary for 26-009 Construction of Sun Mountain Blvd Pre-Bid Meeting Attendee List: Attendee list for the pre-bid meeting held on September 29, 2026, for project 26-009 Construction of Sun Mountain Blvd. The document contains contact information for representatives from various construction firms and City of Pueblo officials.
PDF
PDF, Low priority18 pages · industry-day
LowAI Summary for City of Pueblo Bid 26-009 Pre-Bid Meeting Presentation: Presentation materials from the September 29, 2026, pre-bid meeting for the Construction of Sun Mountain Boulevard (Bid No. 26-009). The document outlines project scope (0.75 mile roadway), funding via RAISE grant, tax requirements, project duration (365 days), and submission deadlines via OpenGov (Due October 21, 2026).
PDF
PDF, Low priority6 pages · other
LowAI Summary for City of Pueblo Licensing and Sales Tax Information for Construction Contractors: This document provides licensing requirements and sales tax information for construction contractors operating within the City of Pueblo, Colorado. It outlines the necessity for contractors and subcontractors to hold appropriate licenses, details the city sales and use tax rate of 3.7%, and explains the mandatory prepayment threshold effective October 1, 2025, for contracts valued at $100,000 or more. The document also clarifies tax obligations on materials and equipment, exemptions, and the responsibilities of general contractors regarding subcontractor tax liabilities. Contact information for the Sales Tax Division and reminders about record-keeping and audits are included.
PDF
PDF, Low priority1 page · ffata-reporting-form
LowAI Summary for FFATA Reporting Form for City of Pueblo: This document is the FFATA Reporting Form/Certification required by the City of Pueblo to comply with the Federal Funding Accountability and Transparency Act (FFATA). It collects applicant information including name, address, DUNS number, project location, and a brief project description. The form requires applicants to disclose if they meet certain federal revenue thresholds and, if applicable, to report the names and total compensation of their top five highly compensated executives. The form must be signed by an authorized official and submitted to the City before any payments are made.
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
4 updates
PhaseClosed
Posted
Solicitation
Deadline changed
Response deadline changed from Oct 21, 2026 to Nov 4, 2026.
Notice updated
The notice description changed.
Notice updated
The notice description changed.
Deadline changed
Response deadline changed from Nov 4, 2026 to Nov 10, 2026.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
The City of Pueblo has initiated the West Side Improvements Project to enhance community connectivity, mobility, and economic vitality. This comprehensive effort includes the construction of Sun Mountain Boulevard and the implementation of three Bus Stop Packages encompassing 67 bus stop locations throughout the west side of the city. The project is funded through a Rebuilding American Infrastructure with Sustainability and Equity (RAISE) Grant awarded to the City of Pueblo by the U.S. Department of Transportation Federal Highway Administration (FHWA). Official Notice #1: Pre-Bid Meeting Information: The pre-bid meeting presentation and attendee list are attached. Attachments: 26-009_Pre-Bid_Meeting_Attendee_List.xlsx, 26-009_Pre-Bid_Meeting_Presentation.pdf Addendum #1: The question deadline and due dates have been extended. Addendum No. 2 will be forthcoming with additional information. Please use the See What Changed link to view all the changes made by this addendum. Official Notice #2: Addendum Information: Addendum will be forthcoming. Question deadline and due dates will be extended. Addendum #2: 1.The following changes have been made: SPECIAL PROVISIONS Section 3.8 ON THE JOB TRAINING CONTRACT GOAL has been revised to Workforce Development and Labor-Management Training Partnerships Section 3.9 Required Documentation of Workforce Development and Labor-Management Training Partnerships has been added, and subsequent items have been renumbered. Section 3.13 Control of Work has been revised. Section 3.21 Pre-Construction Conference has been revised. Section 3.61 PREQUALIFICATION WITH PUEBLO WATER has been added. SPECIAL FUNDING REQUIREMENTS Section 6.12 Workforce Development and Labor‑Management Training Partnerships has been removed, and the remaining items have been renumbered . ATTACHMENTS Attachment G - FHWA Construction Oversight Checklist - IFB has been replaced in its entirety with FHWA Construction Oversight Checklist - IFB (Revised for Addendum 2) Attachment H - Sun Mountain Boulevard - Standard Special Provisions has been replaced in its entirety with Sun Mountain Boulevard - Standard Special Provisions (Revised for Addendum 2) Attachment I - Examples of Workforce Development & Labor Management Partnership Training Programs has been added. 2. Revised Plan Sheets 3, 22, 100, and 122 are attached to this addendum. Please use the See What Changed link to view all the changes made by this addendum. Attachments: 26-009_R01_Sun_Mountain_Revised_Plan_Sheets_03_022_100_122_.pdf Addendum #3: The following changes have been made: SPECIAL PROVISIONS Section 3.61 PREQUALIFICATION WITH PUEBLO WATER has been revised. PRICING TABLE Base Bid Pricing Table Line Item 35 has been revised. Line Item 36 has been revised. Allowances Table has been revised. Please use the See What Changed link to view all the changes made by this addendum. Addendum #4: 1.The following changes have been made: The due date has been extended. PRICING TABLE Quantity on Bid Item 2 has been revised. ATTACHMENTS Attachment J - Geotechnical Evaluation Report Sun Mtn Blvd Pueblo R1_8-6-25 has been added. 2.The final Question and Answer Report is attached. Please use the See What Changed link to view all the changes made by this addendum. Attachments: 26-009_Question_&_Answer_Report.pdf