This Solicitation opportunity from Connecticut was posted on June 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Arch Street Complete Streets Improvements

Closed
37743State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Arch Street Complete Streets Improvements project in New Britain, Connecticut, aims to transform a 2,100-foot corridor along Arch Street from its intersection with Whiting Street to Main Street, including the Monroe Street crossing, through a Complete Streets approach focused on safety, accessibility, and community revitalization. The scope includes constructing new concrete and brick paver sidewalks with ADA-compliant ramps, installing curb extensions and mid-block crossings, restriping roadways, adding new signage, enhancing drainage, integrating ornamental street lighting, planting street trees, and implementing minor landscaping and placemaking features. Traffic signals at the Arch Street and Monroe Street intersection, as well as the Hart/Whiting at Arch intersection, will be upgraded. Critical material standards are mandated, including ASTM A-185-02 reinforced concrete base slabs with welded wire mesh and detectable warning pavers with UV- and slip-resistant powder coating, all requiring prior color sample approval. All materials must remain in original, unopened manufacturer packaging until installation, stored in dry conditions to preserve integrity. All contractor personnel must hold a 10-Hour OSHA Construction Safety and Health Certification before starting work, and traffic control must be managed by municipal police officers or uniformed flaggers. Additional requirements include temporary protective fencing, high-intensity barricade lights, traffic drums, and 42-inch cones, as added through Addendum #1. Work near Eversource utilities demands specific coordination protocols, and mast arm installations must meet structural engineering specifications. The project’s deliverables are subject to inspection and acceptance on-site by the City’s Engineer, who holds sole authority to approve materials, installation methods, and final compliance. While the solicitation number is 37743 and posted on June 30, 2026, with a response deadline of July 28, 2026, no contract value, pricing figures, or formal evaluation criteria are provided in the documents—only blank placeholders for bid pricing. The place of performance is strictly within New Britain, Connecticut, and while the procurement is managed by DAS Procurement under the state’s oversight, no payment details, contracting officer information, accounting identifiers, or invoicing systems are specified. Bidders must certify under penalty of perjury that their submissions are truthful and free from collusion, but no information regarding entity identification, socioeconomic status, or size certification is included.

General Info

Arch Street improvements enhance pedestrian safety, add sidewalks, lighting, trees, and traffic signals along 2,100-foot corridor in Connecticut.

Agency

Connecticut → DAS ProcurementView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CT, USA

Set-Aside

NONE

Documents

(2)

Addendum 1 to Arch Street Complete Streets Improvements Bid Documents

PDFamendment

Solicitation Change Details Report for Solicitation 37743

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
Contacts1 person available
OfficeCT, USA
Organization / Agency
Connecticut → DAS Procurement
View Agency Profile
Office AddressCT, USA
Contacts
Jason OutlawPrimary Contact

Full Description

Show more
The purpose of this project is to utilize a “Complete Streets” design approach, aiming to enhance pedestrian safety, implement traffic calming measures and utilize landscaping and placemaking appurtenances to revitalize the area. The project is approximately 2,100 feet in length, beginning at the intersection of Arch Street and Whiting Street and continuing north to the intersection of Arch Street and Main Street. The project limits also encompass the Monroe Street and Arch Street intersection. The scope of work generally consists of the construction of new concrete sidewalks and sidewalk ramps, brick paver sidewalk and sidewalk ramps, curbing, proposed bump outs, new mid-block crossings, restriping, new signage, limited drainage improvements, brick paver banding, proposed ornamental street lighting, street trees and minor landscaping, new placemaking appurtenances, and traffic signal improvements at both the Arch Street and Monroe Street and Hart/Whiting at Arch intersection.

More opportunities from Connecticut → DAS Procurement

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS