Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on September 4, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Architectural Services

Awarded
BT-2019-160Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Government of Canada → County of LambtonView Agency

Contract Value

$0

NAICS

N/A

Place of Performance

ON, CAN

Set-Aside

NONE

Awardee

a+LiNK ArchitectureView Profile

Award Issued Date

Documents

(7)

14037RPT. Rev 1.pdf

PDF

Minutes Site meeting.Architectural Services OMC.2019-160.final.pdf

PDF

Q&A #1.Arhcitectural Services.2019-160.final.pdf

PDF

Response Form 2019-160 - Architectural Services.pdf

PDF

2019-160 - Architectural Services RFP.FINAL.pdf

PDF

Oil Museum Asbestos Report 2009.pdf

PDF

Addendum# 1.Architectural Services OMC.2019-160.final.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → County of Lambton
ContactsNo contacts available
OfficeN/A
Organization / Agency
Government of Canada → County of Lambton
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Thescope of work required under this request includes the provision of Architectural Services for the following:HVAC:§ Replacement of the chiller and air cooled condenser based on itscurrent age § Air handling unit repair and/or part replacement§ Replace electric steam humidifier in mechanical room§ Replacement of two exhaust fans§ Building Automation System upgrades§ Establish concrete base for existing propane fuel tank on propertyPLUMBING: § Review of sump pump system, basin, pumps and piping, and possibleinstallation of oil interceptor§ Replacement of toilet fixtures in two washrooms, and verificationthat code requirements are being met for wastewater§ Installation of wall-mounted water fountain/bottle fill stationELECTRICAL:§ Replacement of existing interior fluorescent lighting with new LEDfixtures§ Repair, replacement and/or relocation of several power and datareceptacles throughout DOORS & WINDOWS:§ Replace outer set of double-leaf doors at the main entrance§ Replacement of weather stripping for all exterior doors§ Installation of new interior office window frame and door (existingopening)§ Minor demolition to remove non-structural partition wall at entranceto exhibit gallery, and at entrance to theatre space§ Replacement of door and hardware in basement collections storage§ Installation of window inserts in rear exterior double-leaf doorBUILDING ENVELOPE:§ Refurbish the exterior curtainwall and waterproof concrete sills.Painting of exterior window frames and doors. BUILDING SHELL:§ Waterproof foundation wall to floor slab joints at masonry walls andfront entrance vestibule. Review and replacement of perimeter weeping tile.Establish gravel/stone perimeter around building foundation. Review andwaterproof entrance walkway.PAINTING/FINISHING:§ Minor painting of walls, frames, doors, ceilings and bulkheads - and repair of former water damage asrequired throughout.The scope of work will also include a review to determine if further modifications to theHVAC system are required (over and above those recommended through the BCA andengineering review) to facilitate the relocation of office spaces as part ofthis renovation and ensure that the museum can meet standards related to stabletemperature and relative humidity.