ARJOU RESERVOIR DAM AND SPILLWAY REPAIR PROJECT

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Araujo Reservoir Dam and Spillway Repair Project involves comprehensive upgrades to bring the dam into compliance with Division of Safety of Dams requirements. Key improvements include excavating and removing the downstream portion of the existing embankment, installing a seepage barrier through a cutoff trench, adding internal drainage systems to manage and redirect seepage, and reconstructing the dam with increased height to ensure adequate freeboard. Borrow material for the new embankment will be sourced from adjacent sites. The existing spillway will be demolished and replaced with a new concrete drop inlet spillway designed to handle the design stormflow, with its control section restored to the original elevation to preserve the reservoir’s intended storage capacity. The new spillway will connect via a conduit to the existing downstream pipe that directs flows to the primary stream channel. Additionally, the current outlet will be removed and substituted with a new outlet conduit that meets current DSOD safety standards, ensuring proper control and discharge of reservoir water. The project is being coordinated by Napa County, with the place of performance located in Calistoga, California, 94515. The solicitation was posted on June 30, 2025, and inquiries can be directed to Dana Morrison, Supervising Planner at the County of Napa, or David Lounsbury of WBECorp, the consulting civil engineers. No set-aside or NAICS code information is provided, and the project is currently in forecast status with no formal solicitation number yet assigned. The goal is to enhance structural integrity, manage water flow safely, and restore the reservoir’s original functionality under upgraded safety protocols.

General Info

Repair and upgrade Araujo Reservoir Dam and spillway in Calistoga, California, to meet safety standards and restore reservoir capacity.

Agency

California → Napa County

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Pickett Rd & Rosedale Rd, Calistoga, CA, 94515

Set-Aside

NONE

Documents

(1)

NOE ENG24-00008 Arjou Reservoir Dam and Spillway Repair Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Napa County
Office AddressN/A
Contacts
Dana MorrisonSupervising Planner
David LounsburyConsulting Civil Engineers

Full Description

Show more
The Araujo Reservoir 1 dam requires several improvements to bring the facility into compliance with Division of Safety of Dams (DSOD) requirements. The improvements generally includes the following: (i) measures to enhance the stability of the dam and (ii) construction or improvement of the spillway structures, and (iii) installation or modifications to the emergency outlet conduit facilities. The repair plans include the excavation and removal of the downstream portion of the existing dam embankment; establishment of a seepage barrier (cutoff trench) within the embankment to limit subsequent seepage; installation of internal drainage features to collect and convey seepage through and away from the dam; and reconstruction of the dam embankment with additional height to provide adequate freeboard. Borrow material for the added embankment volume is proposed to be developed from borrow sites adjacent to the dam. The existing spillway structure will be removed and replaced with a new concrete drop inlet type spillway structure with adequate capacity to pass the design stormflow. Below/downstream of the dam embankment, the spillway discharge conduit will be connected to the existing spillway pipe that conveys and discharges stormflows from the reservoir to the primary stream channel below the dam. The control section of the spillway will be constructed to the original spillway elevation (pre-DSOD-required emergency repairs) to restore the original storage capacity of the reservoir. The existing outlet will be removed and replaced with a new outlet conduit that will meet DSOD requirements.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Hawaii. This firm-fixed-price contract, issued as an Invitation for Bid under NAICS code 237990, has an estimated value between 1 million and 5 million dollars. The scope of work includes mobilization and demobilization, the dredging and ocean disposal of 4,260 cubic yards of material, and revetted mole repairs involving stone rework, CRM wall repair, and vegetation removal. The period of performance is 200 calendar days from the date of the Notice to Proceed. The project requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. The contract includes a liquidated damages clause of 2,297 dollars per calendar day of delay. Award is based on a lowest responsive and responsible bidder selection process, with specific set-asides for various small business categories, including HUBZone, WOSB, and SDVOSB. Invoicing is conducted monthly, and the contractor must provide a detailed breakdown of pay items within 30 days of the Notice to Proceed.
Healy Tibbitts Builders, Inc.

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19.3 million dollars, the project scope involves designing the removal of existing trailer-mounted Electrodialysis Reversal, slab-mounted Membrane Filtration, and Reverse Osmosis units. These will be replaced with new slab-mounted Membrane Filtration and Reverse Osmosis units to create a demineralization facility aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks quotes for various trade services including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project emphasizes socioeconomic participation, specifically seeking SLBE and ELBE firms with DBE, MBE, WBE, or SBE certifications, and is open to various small business set-asides. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Contracting will be based on Garney Standard PO and Subcontract Forms, and any exceptions must be submitted as redlines with the quote. Proposals are due by August 27, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 13 days
View Details