RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICO

Active
W51DQV26RA002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation W51DQV26RA002 is a request for a single firm-fixed-price, design-bid-build construction contract for the Rio de la Plata Flood Control Project, Supplemental Contract 1, located in Dorado and Toa Baja, Puerto Rico. Managed by the Department of Defense W2SR Endist Caribbean, the project has an estimated magnitude between 250 million and 350 million dollars. The scope of work involves extensive civil engineering tasks, including the excavation of 1.78 million cubic meters of channel, placement of 772,000 cubic meters of levee fill, and the installation of 160,000 cubic meters of scour protection stone. Key infrastructure deliverables include a 1.3-mile earthen levee, four concrete culvert structures with pre-cast concrete piping, composite flap gates, and the relocation of a 72-inch water supply aqueduct along with other water, sewer, and electrical utilities. Additional requirements include the construction of maintenance roads, drainage ditches, and the completion of wetland mitigation. The project is classified under NAICS code 237990 with a small business size standard of 45 million dollars. The estimated period of performance is 1,619 calendar days from the receipt of the notice to proceed, though the government notes that all real estate rights for site access must be obtained before the full notice to proceed is issued. Liquidated damages for delays are set at 23,940 dollars per calendar day. Offerors must submit proposals electronically via the Procurement Integrated Enterprise Environment portal by the deadline. A bid guarantee of 20 percent of the bid price or 3 million dollars, whichever is less, is required, and the awardee must provide payment and performance bonds equal to the total bid price within 10 days of the award. Technical inquiries are managed through ProjNet using the provided bidder inquiry key.

General Info

Flood control project in Puerto Rico; levees, culverts, drainage; $250M-$500M; 1,619-day fixed price contract.

Agency

Department Of Defense → W2SR Endist Caribbean(provis)View Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Toa Baja, Puerto Rico, PR, 00951

Set-Aside

NONE

Documents

(2)

Site Visit Presentation for Solicitation W51DQV26RA002

PDFsite-visit-presentation

Site Visit Sign-In Sheet W51DQV26RA002 for RDLP Flood Control Project

PDFsign-in-sheet

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

8 updates
PhaseSolicitation
Posted

Presolicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Type Changed

Presolicitation → Solicitation

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Amendment 6

Contract was updated

Amendment 7

Contract was updated

Amendment 8

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SR Endist Caribbean(provis)
Contacts1 person available
OfficeSAN JUAN, PR, 00918-0000, USA
Organization / Agency
Department Of Defense → W2SR Endist Caribbean(provis)
View Agency Profile
Office AddressSAN JUAN, PR, 00918-0000, USA

Full Description

Show more
THIS REQUEST FOR PROPOSAL (RFP) WILL RESULT IN AWARD OF ONE (1) FIRM-FIXED-PRICE (FFP) DESIGN-BID-BUILD (DBB) CONSTRUCTION CONTRACT. GENERAL SCOPE OF WORK: REFER TO SECTION 00 31 32.THE NORTH AMERICAN INDUSTRY CLASSIFICATION (NAICS) IS CODE 237990, WITH A SMALL BUSINESS STANDARD SIZE STANDARD OF $45 MILLION.PROJECT MAGNITUDE: FOR INFORMATIONAL AND BONDING PURPOSES, THE ESTIMATED MAGNITUDE OF THIS CONSTRUCTION PROJECT IS BETWEEN $250,000,000 AND $350,000,000. AN ORGANIZED SITE-VISIT HAS BEEN SCHEDULED. SEE SECTION 00 73 00 FOR DETAILS.*** OFFERORS ARE NOTIFIED THAT ALL REAL ESTATE RIGHTS HAVE NOT YET BEEN OBTAINED FOR ACCESS TO THE ENTIRE CONSTRUCTION SITE. OUTSTANDING RIGHTS NEEDED TO PROVIDE THE CONTRATOR ACCESS TO CONTRUCT THE PROJECT WILL BE OBTAINTED BEFORE ISSUANCE OF THE FULL NOTICE TO PROCEED. ***NOTICE: Amendment 0001 was posted on July 2, 2026. Amendment 0002 was posted on August 4, 2026. Amendment 0003 was posted on August 13, 2026. Amendment 0004 was posted on September 3, 2026. To access the official Solicitation, Solicitation Supporting Documents, and Amendments click on PIEE Solicitation Module Link for W51DQV26RA002 link. You will be directed to the PIEE system where you can scroll down to the bottom of page and find all the documents that are available for this solicitation.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and pipe installation, as well as structural and finishing tasks including masonry, welding, roofing, electrical work, and interior finishes. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected system, with a response deadline of September 17, 2026, at 10:00 a.m. The project is partially financed by the Water Infrastructure Finance and Innovation Act (WIFIA) and administered by the EPA, making it subject to the American Iron and Steel (AIS) Provisions, Davis-Bacon Related Acts, and DBE Program requirements. Qualified bidders must possess a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, with bond premiums reimbursed by Kiewit. The solicitation specifically encourages participation from certified DBE, MBE, WBE, and other small business enterprises, requiring evidence of certification from recognized agencies such as the US EPA, SBA, or CA DOT.
Kiewit Infrastructure West Co.

POSTED

about 11 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. Located in Haleiwa, Oahu, Hawaii, the scope of work involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal south of Oahu, vegetation clearance, and repairs to the revetted mole, including stone rework and filling voids. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for small businesses, including SDB, WOSB, HUBZone, VOSB, and SDVOSB concerns, with a specific price evaluation preference for HUBZone small businesses. Bids must be submitted as sealed physical envelopes by September 30, 2026, as electronic submissions are not permitted. Key requirements for a responsive bid include active SAM registration, a bid guarantee, and the submission of SF 1442. The contractor must provide key personnel, including a Project Manager and Site Safety and Health Officer, and adhere to Davis-Bacon Act wage requirements. Acceptance of the dredging work is based on pre- and post-dredge multi-beam hydrographic surveys conducted by a third-party qualified surveyor. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 11 hours ago

DEADLINE

in 25 days
View Details

More opportunities from Department Of Defense → W2SR Endist Caribbean(provis)

Same awarding agency

NAICS: 237120
New
Federal
Freedom Connection Natural Gas Pipeline
Solicitation # W51DQV26Z1BHC
The U.S. Army Corps of Engineers, Latin America and Caribbean District, is conducting market research for the Freedom Connection Natural Gas Pipeline project in Puerto Rico. Funded by the U.S. Department of Energy, the project aims to enhance the resilience of the northern power grid by constructing an approximately 4.2-mile, 20-inch diameter natural gas pipeline to supply the Palo Seco Power Plant from the San Juan liquid natural gas terminal. The anticipated procurement will be a design-bid-build contract under NAICS code 237120, with an estimated construction magnitude between 25 million and 100 million dollars. The anticipated award date is the second quarter of Fiscal Year 2027, with a performance period of 365 calendar days from the notice to proceed. The scope of work encompasses integrated procurement, labor, and services, including the acquisition of long-lead materials, site preparation, and pipeline installation using both open trench and trenchless methods such as horizontal directional drilling. Responsibilities also include the construction of mainline block-valve stations, pig launcher and receiver stations, delegated design management, and final testing and commissioning. This current notice is a request for information to gauge the capabilities and interest of various small business concerns and certified entities. Interested firms must submit a capability statement of no more than ten pages by September 24, 2026, detailing their corporate information, bonding capacity, and relevant project experience.
Oil and Gas Pipeline and Related Structures Construction