Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on July 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Armstrong Avenue Pedestrian Bridge (CIP No.70257) & Neighborhood D South Phase 2 Package #2 Improvements (CIP No.70256)

Closed
CIP No. 70257 and 70256State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 10 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 16 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The contract pertains to the construction of the Armstrong Avenue Pedestrian Bridge and Neighborhood D South Phase 2 Improvements under CIP Nos. 70257 and 70256, with a projected duration of 250 working days and an engineer’s estimate of $10 million. Bids must be submitted electronically through the City of Tustin’s OpenGov procurement portal by the deadline of August 25, 2026, and remain valid for 60 calendar days. Contractors are required to hold a valid California Class A license, and both individual entities and joint ventures must be properly licensed at the time of bid and award. Liquidated damages of $6,700 per calendar day apply for delays beyond the contract completion date, and retainage of 5% is held on progress payments until final acceptance. The work must comply with the 2022 Caltrans State Standard Specifications and the 2021 Greenbook, alongside applicable federal and state standards such as the National Electrical Code, OSHA, ASTM, and California Title 8. All materials must be delivered to the project site in Tustin, CA, in original, undamaged packaging with intact labeling and suitable for forklift handling, though no specific military packaging standards are mandated. Performance requires strict adherence to environmental and safety regulations, including compliance with CARB’s In-Use Off-Road Diesel Fleet Regulation, submission of valid compliance certificates, and display of required equipment signage. A certified Stormwater Pollution Prevention Plan must be developed and implemented by a Qualified Stormwater Pollution Prevention Plan Developer or Supervisor, with weekly training conducted and reports submitted to the Regional Water Quality Control Board. The contractor must also register with the California Department of Industrial Relations to ensure prevailing wage compliance and submit certified biweekly payroll records. Utility coordination is critical, with inspections and acceptance performed directly by agencies such as Southern California Edison, SoCalGas, AT&T, and Cox Communications after installation at the site. Payments are processed electronically via Procore, with final payment due within 60 days of Notice of Completion after submission of lien waivers and as-built Record Drawings in both PDF and CAD formats. All subcontractors exceeding 0.5% of the bid value must be disclosed, and failure to submit required insurance, bonds, or compliance documentation within 10 days of award results in forfeiture of the contract. Special fees apply for after-hours and holiday work unless directed by the agency, and substitutions of materials require prior written approval from the

General Info

Armstrong Avenue bridge project, $10M, 250 days, Class A contractor required, $6,700 daily delay penalty, bids due August 25, 2026.

Agency

California → Public WorksView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(11)

SCE TD2218700 MPED Final Work Order Map

PDFwork-order

SCE_TR18197-TD2124190_WO3 Precast Tub-Type Valves and Site Map

PDFspecifications

Tustin_Legacy_-_Gas_Plan_-_Phase_2.pdf

PDF

BID_SET_CIP_70256_Package_2_DELTA_1_revised Approved Utility and Construction Notes

PDFcontract-document

Invitation for Bids Armstrong Avenue Pedestrian Bridge & Neighborhood D South Phase 2 Package #2 CIP No. 70257 and 70256

PDFifb

COX_REDLINE_19-0919

PDFother

SCE Work Order TD2142747 Dual Purpose Meter Pedestal Installation

PDFwork-order

Bid Bond Submittal Instructions for City of Tustin

PDFspecial-notice

AT&T_LE(70)_A01QK1Y.pdf

PDFother

Armstrong 100% Plans Revision 1 Approved Signed

PDFspecifications

Tustin-Legacy Neighborhood D South Phase 2 Infrastructure Construction Project - Package 2 Specifications

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
Contacts1 person available
OfficeTustin, CA, 92780, USA
Organization / Agency
California → Public Works
View Agency Profile
Office AddressTustin, CA, 92780, USA
Contacts
Cheyenne VerduzcoSenior Management Assistant

Interested Companies (28)

Show more
Arroyo Sitework Consulting
Tustin, CA
Certified Coatings
Fairfield, CA
ConstructConnect
Cincinnati, OH

See All 28 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Project Schedule (contract days): 250 Working Days Engineer's Estimate: $ 10 Million Liquidated Damages: $ 6700 / Calendar Day Bid Valid (calendar days): 60 Days Contractor's License(s): Class A

More opportunities from California → Public Works

Same awarding agency

NAICS: 541360
New
SLED
Vegetation Monitoring Survey and Report for the Napa County Flood Protection Project RFP
Solicitation # FDRFP20260908
The Napa County Flood Control and Water Conservation District is seeking proposals from qualified firms to perform a comprehensive vegetation survey and monitoring report for restoration areas associated with the Napa River Flood Protection Project. The selected contractor will analyze biological, chemical, and physical changes over time based on the Project Mitigation and Monitoring Plan and previous reports from 2017 and 2022. The scope of work involves a two-scale assessment consisting of high-resolution aerial photo interpretation to determine habitat types and extent, followed by ground-truthing to verify boundaries and document ecological parameters across seventeen vegetation monitoring transects and approximately one hundred ninety sample plots. This solicitation, identified as FDRFP20260908, was posted on September 8, 2026, with a response deadline of November 13, 2026. The project is managed by the Public Works agency in Napa, California, with Mark Snyder serving as the primary point of contact. All deliverables must adhere to ADA and Section 508 accessibility standards and comply with Government Code section 7550 regarding the disclosure of contract and subcontract amounts. The final monitoring report will use specific indicators to evaluate the biological and chemical responses to physical habitat modifications against established performance standards and restoration goals.
Geophysical Surveying and Mapping Services

POSTED

4 days ago

DEADLINE

in 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS