Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Georgia was posted on January 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ARPA #2 MAIDEN LANE LIFT STATION

Closed
PE-66990-NONST-2026-000000004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and pump system, the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified DBE, MBE, and WBE firms across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026. Primary coordination for this opportunity is handled by Christina Pauls at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

1 day ago

DEADLINE

in 15 days
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies, along with the abandonment of existing water mains. The work is located on Walnut Street, Ebony Lane, and 247th Place in California. W.A. Rasic Construction Company, Inc. is acting as the prime contractor and is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and material testing. The response deadline for subcontractor quotations is October 19, 2026, at 1:00 PM. This is an SBA set-aside opportunity encouraging participation from DBE, MBE, WBE, and SBE firms. Qualified subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Additionally, subcontractors may be required to provide payment and performance bonds totaling 100 percent of their bid, with bond premiums reimbursed up to 1.5 percent. All selected subcontractors must execute the standard subcontract agreement and insurance requirements of W.A. Rasic Construction Company, Inc.
W.A. Rasic Construction Company

POSTED

1 day ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The City of Lula is seeking qualified contractors to submit bids for the installation of a new lift station project titled "ARPA #2 MAIDEN LANE LIFT STATION." The scope of work includes installing approximately 180 linear feet of 8-inch gravity sewer, 480 linear feet of 3-inch PVC force main, five manholes, a 6-foot diameter wet well, and two 4 horsepower Flygt submersible pumps. The contractor must also supply a control panel and various miscellaneous equipment necessary for a fully operational pump station. Additionally, the contractor is responsible for furnishing all other equipment and appurtenances, including electrical service, site lighting, and water service, as well as providing all labor and equipment to complete the installation according to the provided construction drawings. The solicitation, identified by number PE-66990-NONST-2026-000000004, was posted on January 19, 2026, with a bid response deadline of February 20, 2026. The project is managed under the City of Lula in Georgia and is designated as a state and local government solicitation without any specific set-aside requirements. Interested parties can contact Frank Etheridge at the City of Lula for further information. The full solicitation details and submission guidelines are available through the Georgia procurement portal online.

General Info

City of Lula seeks contractors to install lift station with pumps, sewer lines, control panel; bid due February 2026.

Documents

1

Advertisement for Bid ARPA #2 Maiden Lane Lift Station

PDF, High priority: read this first2 pages · advertisement-for-bid
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Lula
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Lula
Office AddressN/A

Full Description

Show more
City of Lula is soliciting bids from qualified contractors for the installation of approximately 180 LF of 8¿ gravity sewer, 480 LF of 3¿ PVC force main, five (5) manholes, one (1) 6 ft diameter wet well, two (2) 4 HP Flygt submersible pumps, control panel and miscellaneous equipment. Contractor shall also be responsible for furnishing all other equipment and related appurtenances, including the electrical service, site lighting and water service. Contractor shall be responsible for the provision of labor and equipment or any other item(s) necessary to provide a fully functioning pump station, as shown on the Construction Drawings.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS