Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on February 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ARPA System Improvements Fire Hydrant Replacement

Closed
PE-33084-NONST-2025-000000003State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 13 hours ago

DEADLINE

in 12 days
NAICS: 238910
New
SLED
26-037-CIP
Solicitation # 26-037-CIP
The SportsOhio PowerPlay Demolition project, identified as solicitation 26-037-CIP, is a City of Dublin, Ohio, contract for the demolition and restoration of specific areas at 6314 Cosgray Road. The scope of work includes the removal of the Can-Am/go cart track, batting cages, a concrete seating pad, associated walkway connections, and a mini golf course. The project has an engineer's estimate of $259,606.50 and must be completed by April 30, 2027. Key technical requirements include adhering to the 2026 City of Dublin and City of Columbus Construction and Material Specifications, following National Electric and Safety Codes, and ensuring tree clearing occurs specifically between October 1 and March 31. Bids are submitted via Bid Express and are evaluated based on a lowest and best analysis, with a strong preference for Ohio-based bidders or those from reciprocal border states. Qualified bidders must provide a bid guaranty per the Ohio Revised Code, evidence of similar experience, and a noncollusion affidavit. The contract mandates the payment of prevailing wages and requires the use of domestic source end products. Payment is structured monthly at a rate of 95% until the work is 50% complete, after which the retention amount may be reduced at the City's discretion. All inspections are managed by the City of Dublin, though the contractor must coordinate utility abandonment inspections with AEP, Columbia Gas, and other communications companies.
City of Dublin, OH - Engineering

POSTED

about 15 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

This contract involves the installation of approximately 400 linear feet of 8-inch watermain, along with the installation and replacement of fifteen 3-way fire hydrant assemblies and four hydrant replacements. The scope includes excavation around hydrant perimeters, removal of existing fire hydrants, and the reconstruction of curb, gutter, sidewalk, and asphalt in affected areas to facilitate service transfers and upgrades. The new hydrants will be AFC B84B models equipped with Storz connections on a 5¼-inch pumper connection, ensuring compatibility with existing firefighting infrastructure. The project is overseen by the Eatonton - Putnam Water & Sewer Authority in Georgia, with a contract value estimated between $500,000 and $1,000,000. The solicitation was posted on February 20, 2025, with a response deadline of March 20, 2025. Interested contractors can contact Brice Doolittle via email or phone for further details. The project aims to improve fire protection infrastructure through comprehensive hydrant replacement and watermain upgrades, ensuring enhanced safety and service reliability in the area.

General Info

Agency

Georgia → Eatonton - Putnam Water & Sewer Authority

Place of Performance

GA, USA

Set-Aside

NONE

Documents

1

PE-33084-NONST-2025-000000003 ARPA Water System Improvements (Black Hydrants)

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 33084 EATONTON PE-33084-NONST-2025-000000003 to PE-33084-NONST-2025-000000003.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Eatonton - Putnam Water & Sewer Authority
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → Eatonton - Putnam Water & Sewer Authority
Office AddressN/A

Full Description

Show more
In general, construction shall consist of installation of approximately 400 L.F. 8¿ watermain, fifteen (15) 3-way fire hydrant assemblies, Four (4) 3-way fire hydrant replacements, and excavation around a hydrant perimeter. Also, the project includes removal of existing fire hydrants, installation curb and gutter removal/replacement, sidewalk removal/replacement, and asphalt removal/replacement for impacted areas and service transfers. New hydrants shall be AFC B84B with Storz connection on 5¼¿ pumper connection.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS