Arrowbear Boat Storage

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The proposed project involves developing a 3.93-acre portion of a 5.88-acre parcel in Arrowbear Lake, an unincorporated area of San Bernardino County, into a personal property storage facility specializing in indoor boat storage. The parcel is zoned with a split designation—1.95 acres under Multiple Residential (RM) and the remaining 3.93 acres under General Commercial-Sign Control overlay (CG-SCp), with development limited to the CG-SCp area. The facility will consist of one new 10,974-square-foot modular building for storage and the repurposing of an existing 1,757-square-foot building as an office, while two other existing structures will be demolished. Construction will involve demolition, site clearing, grading, utility improvements, and installation of prefab structures on footings, with access maintained via an upgraded gravel entrance converted to concrete. The project will include seven parking spaces, one of which is handicap-accessible, and will rely on the Arrowbear Park County Water District for potable water and wastewater services, with an existing well retained solely for irrigation. Electrical service will be provided by Southern California Edison. Operations will be year-round by appointment only, with reduced hours during winter months, and will employ a maximum of three staff members. The facility is designed to accommodate up to 252 boats and trailers per season, with an anticipated two truck trips per year for 80% of the operations. The project’s timeline includes phased activities: demolition scheduled for June to July 2025, site preparation and grading in August and September 2025, and modular building installation in July and August 2026, with architectural casting to follow. Compliance with the 2007 California Building Code and ASCE 7-16 standards governs geotechnical and structural requirements, including a minimum 90% compaction rate for fill material, restrictions on oversized soil particles, and erosion controls verified by a geotechnical consultant. Environmental compliance triggers include a pre-construction nesting bird survey if work occurs between March 15 and August 31, submission of a cultural resources study, and a waste management plan with documentation of recycling diversion percentages. No federal acquisition regulations, contract clauses, or procurement-specific administrative data such as payment office details, contracting officer roles, or invoice systems are applicable, as this is a local land use approval process administered by San Bernardino County. The applicant, RKAA-Arch

General Info

Developing 3.93-acre CG-SCp parcel into indoor boat storage with modular building, gravel-to-concrete access, 252-boat capacity, year-round appointment-only ops.

Agency

California → San Bernardino County

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Hilltop Blvd. and Powers Lane, CA, 92382

Set-Aside

NONE

Documents

(11)

Preliminary Drainage Report for Boat Storage Project 2025-00020

PDFpreliminary-drainage-report

NOA-NOI for CEQA Circulation PROJ-2023-00088 Arrowbear Boat Storage

PDFspecial-notice

Biological Resources Assessment for Arrowbear Boat Storage Project

PDFbiological-resources-assessment

Boat Yard Storage CEQA Appendix A CalEEMod Outputs Report

PDFother

San Bernardino County Boat Storage Trip Generation Analysis December 2024

PDFtechnical-memorandum

San Bernardino County Initial Study for Arrowbear Lake Storage Facility POJ-2023-00088

PDFinitial-study

Paleontological Assessment for 32864 Hilltop Boulevard Project

PDFpaleontological-assessment

Arrowbear Boat Storage CEQA Summary Form

PDFceqa-summary

Cultural Resources Survey for 32864 Hilltop Boulevard Project

PDFcultural-resources-survey

Update Report of Geotechnical Study for Proposed Boat Storage Buildings, Arrowbear Lake, CA

PDFgeotechnical-report

Arrowbear Boat Storage CEQA Notice of Completion

PDFceqa-notice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino County
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Bernardino County
Office AddressN/A
Contacts

Full Description

Show more
The Applicant is requesting approval of a Minor Use Permit to develop approximately 3.93 acres of a 5.88-acre parcel into a Personal Property Storage facility that will provide indoor boat storage. The Project Site is located in Arrowbear Lake, an unincorporated area of San Bernardino County (see Figure 1 – Regional Location). The parcel is described as Assessor’s Parcel No. 0328-165-16 and has a split Countywide Plan zoning of Multiple Residential (RM) (1.95 acres) and General Commercial-Sign Control overlay (CG-SCp) (3.93 acres). The Applicant intends to develop the designated CG-SCp portion of the property; the remainder of the property will remain undeveloped. One of the three existing structures near the entrance and adjacent to Highway 18 (SR-18) is vacant with a second structure being used for storage. An existing shed on the property is also used for storage. Access to the Project Site would continue to be provided by the existing gravel entrance directly off SR-18 that would be graded and paved with concrete. The Applicant also owns an adjacent property (APN 0328-165-07) that is shown on the Site Plan, but will not be developed. This parcel has a Countywide Plan zoning of Single Residential (RS). The Project is proposed as a Personal Property Storage facility that would include the construction of one 10,974-square-foot (SF) building to be used for storage, and the use of a 1,757-SF existing building to be used as an office (see Figure 2 – Site Plan). Two of the three existing buildings would be demolished (see Figure 2 – Site Plan). All new structures would be prefab/modular, constructed off-site, and installed on footings. The scope of the construction work would consist of demolition, site clearing, site preparation, various utility improvements, and installation of the modular structures with on-site parking and open space. The Proposed Project will operate 12 months of the year by appointment only and require a maximum of 3 employees. Proposed hours of business = Summer-10am-2pm (by appointment only); Winter (Nov-April) by appointment only. Anticipated truck trips to deliver and/or pick-up is two per year for 80%. Client would like to move 252 boats and trailer in and out each way every season. The Proposed Project would include a total of 7 parking spaces (including one handicap accessible space) for the Project Site. Parking will be placed along a concrete sidewalk. Wastewater would be treated by Arrowbear Park County Water District. Potable water would also be provided by Arrowbear Park County Water District. There is an existing on-site well that will remain for irrigation only. The Proposed Project would rely on Southern California Edison (SCE) electric facilities to meet energy demands.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SEEKING QUALIFIED SUBCONSULTANTS IN RIVERSIDE COUNTY/SOCAL TO SUPPORT WELL REPLACEMENT PROJECT WITH WATER DISTRICT
Solicitation # seeking-qualified-subconsultants-riverside-countysocal-support-well-replacement-project-water
GHD Inc. is soliciting qualified subcontractors to support the Corydon Well Replacement Design Project for Elsinore Valley Municipal Water District in Riverside County, California, with a focus on engaging Disadvantaged Business Enterprises, Small Business Enterprises, Women-Owned Business Enterprises, Minority-Owned Business Enterprises, and other eligible firms under SBA set-aside programs. The scope of work encompasses a broad range of professional services including engineering, environmental consulting, surveying, geotechnical analysis, permitting, public outreach, and utility location, aligned with NAICS codes such as 541330 and others related to architectural and engineering services, construction, and regulatory support. Interested firms must submit a qualifications package by August 7, 2026, and request solicitation documents by 5 p.m. PST on August 14, 2026, to receive full project details, with the formal response deadline for proposals set for September 15, 2026. All interactions and submissions should be directed to Charlie Brown at charles.brown@ghd.com, and performance is expected to occur within the service area of the Elsinore Valley Municipal Water District in Southern California.
GHD Inc.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals from Disadvantaged Business Enterprise (DBE) firms to provide comprehensive design, bidding support, and engineering services during construction for the Corydon Well Replacement Project in California, under solicitation number corydon-well-replacement-c2305-1. The project entails designing a new municipal groundwater production well to replace and abandon the existing Corydon well, with work divided into two phases: Phase 1 includes technical specifications, civil site design, line-bid items for drilling and abandonment, bidding assistance, and full-time on-site construction management oversight in compliance with Riverside County and California State Water Resources Control Board requirements; Phase 2 involves detailed architectural, civil, mechanical, structural, electrical, and instrumentation and controls design drawings along with a line-item bid schedule for equipping, testing, and commissioning. The new well must meet AWWA standards, utilize a 24-inch diameter stainless steel Ful-Flo louvered screen, match existing vertical turbine equipment, tie into the Corydon Blend station and Malaga blending location, and comply with SWRCB-DDW, DWR, and EVMWD requirements. Key deliverables include a Preliminary Design Report at up to 30% design completion, review of approximately 200 submittals, assistance with a Domestic Water Supply Permit Amendment, and development of Record Drawings reflecting field changes alongside start-up and operator training support. The contract is governed by the Federal Acquisition Regulation with incorporated clauses including 2 CFR Subtitle A, Part 200, 2 CFR 1400 and 1401, DOI Standard Award Terms, and 48 CFR 52.203-17 for subawards over the simplified acquisition threshold. Respondents must complete mandatory certifications in Attachment “2,” including American Iron and Steel Certification, Debarment and Suspension Certification, SAM Information, Executive Order N-6-22 Certification, Conflict of Interest Disclaimer, Insurance Acknowledgment, Public Works Contractor Registration, and DBE Subconsultant Information. The RFP requires strict adherence to Build America Buy America Act compliance, including domestic-content documentation and waiver procedures for non-compliant materials, and prohibits procurement of equipment from Huawei or ZTE. The award will be based on demonstrated competence and professional qualifications, with evaluation factors weighted as follows: Relevant Qualifications/Experience (25%), Understanding of Project and Project Approach (25%), Scope of Work and Schedule (20%),
Ardurra Group, Inc.

POSTED

about 8 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project entails the design of a new municipal groundwater production well to replace and formally abandon the existing Corydon Well on Elsinore Valley Municipal Water District (EVMWD) property, with all work conducted in compliance with California State Water Resources Control Board and Riverside County regulations. The project is divided into two phases: Phase 1 focuses on hydrogeological evaluation, aquifer analysis, well design matching the existing casing depth and sanitary seal standards per AWWA guidelines, civil and site engineering for wellhead facilities, bidding assistance, and full-time on-site construction management and hydrogeological oversight during drilling. Phase 2 involves engineering design for well equipping—including architectural, structural, mechanical, electrical, instrumentation, and controls systems—alongside support during bidding and ongoing engineering oversight during construction. Technical specifications require a 24-inch diameter stainless steel Ful-Flo louvered screen compatible with local geology, and all materials must comply with the Build America, Buy America Act and domestic content requirements under 2 CFR Part 184, with documented efforts to source U.S.-produced iron, steel, and manufactured products. The project spans from initiation in November 2026 through completion in May 2028, with a contract value not exceeding $1,000,000, partially funded by a $400,000 Bureau of Reclamation grant requiring adherence to federal administrative, audit, and procurement rules under 2 CFR Part 200. Proposals must include detailed qualifications, resumes of key personnel, relevant municipal water and groundwater project experience, current California professional licensure, DBE subconsultant participation details, and a comprehensive cost proposal broken down by task with hourly rates and incidental costs. Submissions must be made through EVMWD’s PlanetBids portal by the September 1, 2026 deadline and include mandatory certifications for debarment and suspension, lobbying compliance, American Iron and Steel compliance, executive order N-6-22 sanctions screening, insurance acknowledgment, and non-collusion declarations. Evaluation prioritizes demonstrated technical competence and experience (25%), followed by understanding of project objectives (25%), schedule and risk management (20%), innovation (10%), cost value (10%), and overall proposal quality (10%), with the award based on qualifications rather than lowest cost. The consultant must provide monthly progress reports, detailed invoices, and maintain full records for four years post-final payment subject to audit. All
GEI Consultants, Inc.

POSTED

about 8 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
SLED
A/E RFQ - Ballistic Aero-Optics and Materials Range Phase 2 - Bryan, Texas
Solicitation # TAMUS-RFQ-01-3489
The Texas A&M University System, through its Office of Facilities Planning & Construction, is seeking qualified Architect/Engineer firms to support the Ballistic Aero-Optics and Materials Range Phase 2 project at the RELLIS Campus in Bryan, Texas. This initiative expands upon a facility completed in 2024 to significantly enhance capabilities in aero-optics and hypersonic testing, including extending aero-optics performance beyond 1,000 meters and hypersonic testing beyond 500 meters, while doubling the recovery tube length from 305 meters to approximately 610 meters. The project calls for the design and construction of critical infrastructure components including a new Tail Building at the south end of the range to house the relocated Laser Firing Tank and final sections of the recovery tube, as well as at least two additional test buildings aligned with project test sections. Standardized 14.6-meter range tube sections will be used throughout the expansion. The total planning budget for the project is $70,605,000, with $17,129,803 allocated specifically for the construction contract, while the remainder covers fees, furnishings, contingencies, and related expenses. Selection will proceed through a qualifications-based process where firms submit statements of qualifications via the e-Builder portal by 2:00 p.m. Central Time on September 1, 2026. The top-ranked respondents may be invited to present their qualifications in an interview, but no pricing or cost information is solicited at this stage. All firms must complete the State of Texas Subcontracting Plan form, for which guidance and a tutorial are provided by the system’s Office of Procurement & Business Services. Inquiries must be directed to Jeff Herring at the Texas A&M University System Office of Facilities Planning & Construction, with contact information provided for phone and email. The solicitation is issued under NAICS code 541330 and administered by a state educational agency with no set-aside provisions identified.
Texas A&M University System

POSTED

about 13 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
International
Transportation and Economic Corridors - Request for Proposal - CON0025815-OVERLAYS of HWY 49:06 and HWY 49:08
Solicitation # AB-2026-05586
Alberta Transportation and Economic Corridors is soliciting proposals from three pre-qualified firms—Associated Engineering Alberta Ltd., Progressive Engineering and Consulting Ltd. (dba CAP Engineering), and ISL Engineering and Land Services Ltd.—for comprehensive engineering services on two sections of Highway 49: Overlay limits 34.946 to 52.425 (WAC0077705) and 0.000 to 2.486 (WAC0077705). The scope includes preliminary engineering, detailed design, contract tendering, contract administration, construction supervision, post-construction review, and warranty inspections. Proposals must be submitted in two separate PDF files under 10 MB each: one detailing technical qualifications and the other containing the proposal fee. This is a Request for Proposal, not an Invitation to Tender, and only submissions from the listed firms will be considered. Alberta Transportation and Economic Corridors reserves the right to request clarifications, accept or reject proposals without negotiation, or negotiate changes with the selected firm. There is no reimbursement for proposal preparation costs. Selection will be based on overall value, not simply the lowest price. The deadline for submissions is September 2, 2026, at 5:30 AM MT, and inquiries should be directed to Rence Balaccua, Project Procurement Officer.
Transportation and Economic Corridors

POSTED

about 16 hours ago

DEADLINE

in 25 days
View Details