Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

As-Built Documentation & Record Submittals

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of SolvangView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Solvang, CA, 93463, USA

Set-Aside

NONE

Documents

This scope was carved out of 20260810007.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

PG&E Service Installation For Parking Lot 5 Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Solvang
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Solvang
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Maintenance and submission of redlined drawings, field changes, and final as-built documentation for city approval and audit readiness.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals from Disadvantaged Business Enterprise (DBE) firms for the Corydon Well Replacement Project on behalf of the Elsinore Valley Municipal Water District in California. The project involves the design of a new municipal groundwater production well to replace and abandon the existing Corydon well. The scope is divided into two phases: Phase 1 covers technical specifications, civil site design, bidding assistance, and full-time on-site construction management; Phase 2 includes architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for equipping, testing, and commissioning the well. Key technical requirements include using 24-inch diameter stainless steel Ful-Flo louvered well screens and ensuring the new pump matches existing vertical turbine equipment applications. The total estimated project cost is 2,260,788 dollars, which includes 2,000,000 dollars for construction. Award selection is based on demonstrated competence and professional qualifications rather than lowest cost, with evaluation weighted toward relevant experience (25%), project approach (25%), and scope/schedule (20%). Proposals must be submitted via the PlanetBids Vendor Portal by September 1, 2026. The contract is subject to strict federal and state regulations, including Build America Buy America (BABA) domestic-content requirements, the Iran Contracting Act, and various non-discrimination and environmental statutes. Payment is managed exclusively through the Department of Treasury Automated Standard Application for Payments (ASAP) system, with oversight provided by the Bureau of Reclamation.
Ardurra Group, Inc.

POSTED

about 8 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project, managed by GEI Consultants, Inc. for the Elsinore Valley Municipal Water District, is a professional services engagement focused on the design and construction of a new municipal groundwater production well and the abandonment of the existing Corydon Well in California. The project is divided into two primary phases: Phase 1 covers technical specifications, civil site design, bidding assistance, and full-time on-site construction management for the drilling and abandonment process; Phase 2 involves architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for the equipping, testing, and commissioning of the new well. The total estimated project cost is 2,260,788 dollars, with a significant portion allocated to contractual and construction costs. The project is partially funded by the Department of the Interior Bureau of Reclamation WaterSMART Planning and Project Design Grant, requiring strict adherence to federal grant requirements, including 2 CFR Part 200 procurement standards, the Build America, Buy America Act, and specific reporting cycles. Qualified firms, particularly certified DBE and small businesses, are encouraged to apply. Requirements for the selected consultant include providing performance and payment bonds for 100 percent of the contract price, maintaining comprehensive general and automobile liability insurance, and complying with California prevailing wage laws and Cal/OSHA standards. Proposals must be submitted via the PlanetBids Vendor Portal, and the award will be based on the most advantageous proposal, considering qualifications and price.
GEI Consultants, Inc.

POSTED

about 8 hours ago

DEADLINE

in 20 days
View Details

More opportunities from California → City of Solvang

Same awarding agency

NAICS: 237130
New
SLED
PG&E Service Installation For Parking Lot 5 Project
Solicitation # 20260810007
The City of Solvang is soliciting bids for Project PW 26-01, which involves the construction and installation of PG&E utility services for Parking Lot 5 in Solvang, California. The scope of work includes trenching, pavement restoration, and the installation of conduits, sweeps, transformers, switchboards, meter pedestals, and concrete equipment pads. Additionally, the project covers infrastructure to support future electric vehicle chargers and the replacement of a light pole at the intersection of Oak Street and 2nd Street. The contractor is responsible for providing all necessary labor, materials, and equipment, with an estimated construction cost between $200,000 and $240,000. The contract will be awarded based on the Lowest Price Technically Acceptable (LPTA) methodology, with a 5% price preference applied to local businesses. Bidders must submit sealed physical proposals by August 25, 2026, including a 10% bid security and required documentation such as experience statements and non-collusion declarations. Performance is expected to be completed within 60 working days from the Notice to Proceed. Technical compliance is measured against industry standards including NETA ATS-2021, NFPA 70, and the PG&E Greenbook, with final acceptance contingent upon on-site field testing witnessed by the City Engineer.
Power and Communication Line and Related Structures Construction

POSTED

about 22 hours ago

DEADLINE

in 13 days
View Details