Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Georgia was posted on May 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

As-Built Drawing Preparation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessments. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid date of September 11, 2026, and a response deadline of September 30, 2026. Eligible bidders include Disadvantaged, Minority, Women, and Other Business Enterprises, provided they hold certifications from recognized agencies such as the SBA or MBDA. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Furthermore, Kiewit, as a signatory to various collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. For further information or to review plans and specifications, interested parties should contact Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 12 hours ago

DEADLINE

in 18 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 12 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract titled As-Built Drawing Preparation requires the preparation of precise as-built drawings that document the final configuration of conduit routing, equipment placements, and electrical connections following installation. These drawings must accurately reflect all changes made during the construction process to ensure compliance with design specifications and operational needs. The work is classified under NAICS code 541330, indicating it falls within architectural and engineering services, and is structured as a subcontract under the Georgia Savannah Airport Commission. The solicitation was posted on May 11, 2026, with a firm deadline of June 16, 2026, for responses, and the place of performance is associated with the Savannah Airport Commission in Georgia, though specific location details are not provided. The project demands technical precision and attention to detail to deliver documentation that supports future maintenance, modifications, and regulatory compliance.

General Info

Preparation of accurate as-built electrical drawings for Savannah Airport Commission, supporting maintenance and compliance.

Agency

Georgia → Savannah Airport CommissionView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of RFP 2026-0022.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFP 2026-0022 Fuel Farm Electrical Feed to Emergency Generator

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Savannah Airport Commission
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → Savannah Airport Commission
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Prepare accurate as-built drawings reflecting final conduit routing, equipment locations, and electrical connections post-installation.

More opportunities from Georgia → Savannah Airport Commission

Same awarding agency

NAICS: 541370
SLED
RFQ 2026-0027 Turnkey Precision Aerial Application and Survey Unmanned Aircraft System (
Solicitation # RFQ 2026-0027
The Savannah Airport Commission is soliciting bids under RFQ 2026-0027 for a brand new, field-ready, turnkey Unmanned Aircraft System (UAS) Ecosystem. The required system must include one autonomous heavy-lift precision aerial application UAS for spraying and spreading, one long-endurance survey and photogrammetry UAS, a unified handheld Ground Control Station capable of multi-aircraft command, and a shared RTK GNSS base station network. The package must also include all necessary flight batteries, rapid-charging equipment, hot-swappable payloads, spare parts, software licenses, and manufacturer regulatory onboarding services. All equipment must be manufactured within the United States and fully comply with the National Defense Authorization Act (NDAA), with systems from DJI, Autel, and XAG strictly excluded. Technical requirements include autonomous obstacle detection for vertical objects at a minimum distance of 15 meters and the storage of geofencing boundaries in non-volatile memory to ensure containment during communication loss. Bidders must be bona fide wholesale stocking distributors, dealers, or manufacturers. The contract will be awarded to the most responsible and responsive bidder at the lowest cost. Responses must be submitted exclusively through the Bonfire portal by September 24, 2026, and must include a completed pricing sheet, vendor certification, and a specifications confirmation form. Payment terms are net 30 days following the receipt of goods and validation of services. Awardees are required to maintain liability and workman's compensation insurance, as well as all necessary licenses and permits.
Surveying and Mapping (except Geophysical) Services

POSTED

18 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS