Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on August 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

As Needed Cured In Place Pipe (CIPP) Lining Services

Closed
26-049UM-IFBState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The City of Plant City is establishing an annual, as-needed contract for Cured-In-Place Pipe (CIPP) lining services to rehabilitate its wastewater collection system, which includes approximately 160 miles of gravity sewer mains ranging from 8 to 36 inches. The scope of work encompasses trenchless rehabilitation, point repairs, lateral lining, cleanout installations, and lateral reinstatements to ensure compliance with regulatory requirements and long-term asset management goals. The contract is designed for a three-year duration with potential extensions, and the City intends to award the work to up to three of the lowest responsive and responsible bidders for each curing method. Qualified contractors must possess at least five years of experience with the specified technologies, and their crew leaders must have completed at least five similar projects within the state of Florida. Key operational requirements include a strict emergency response timeline, with estimates due within six hours and mobilization within 48 hours of a break. Technical standards require a minimum design life of 50 years for installed pipes and adherence to ASTM and NASSCO specifications. The City provides a local preference for qualifying bidders who maintain a physical office in Plant City and hold a state license. Award and payment are contingent upon inspection and acceptance by a City representative, and contractors must provide a professional engineer-sealed lining thickness calculation package prior to installation.

General Info

Plant City seeks CIPP lining contractors for a three-year wastewater system rehabilitation contract.

Documents

9

26 049UM-IFB As Needed Cured In Place Pipe (CIPP) Lining Services

PDF, High priority: read this first30 pages · ifb
High

26-049UM-IFB As Needed Cured In Place Pipe (CIPP) Lining Services

PDF, High priority: read this first31 pages · ifb
High

26-049UM-IFB As Needed Cured In Place Pipe (CIPP) Lining Services

PDF, High priority: read this firstifb
High

26-049UM-IFB CIPP Lining Services Agreement

PDF, High priority: read this first26 pages · contract-document
High

26 049UM-IFB Cured In Place Pipe Lining Services Summary of Work

PDF, High priority: read this first40 pages · ifb
High

26-049UM-IFB Cured In Place Pipelining Technical Specifications

PDF, High priority: read this first13 pages · specifications
High

26-049UM-IFB Measurement and Payment Plan

PDF, High priority: read this first7 pages · specifications
High

CIPP Line Items Pricing Schedule

XLSX, High priority: read this first4 pages · line-item-schedule
High

Plant City Collection System Map

PDF, Low priorityspecifications
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Sep 24, 2026 to Oct 8, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Utilities Maintenance
Contacts2 people available
OfficePlant City, FL, 33563, USA
Office AddressPlant City, FL, 33563, USA
Contacts
Jay KwagCIP Engineering Manager
Gaby HindsContract Specialist

Interested Companies (6)

BLD ServicesKenner, LA
jhgfytretretr
Fehl Safe Water Systemsbradenton, FL

See All 6 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The City of Plant City owns and operates an extensive wastewater collection system consisting of approximately 160 miles of gravity sewer mains, ranging in diameter from 8 inches to 36 inches, and 4‑inch and 6‑inch sewer laterals. Maintaining the integrity and performance of this aging infrastructure is essential to ensuring reliable wastewater conveyance, minimizing inflow and infiltration (I&I), and meeting evolving regulatory requirements. To support compliance with Rule 62-600.705(2), F.A.C. and to advance the City's long‑term asset management goals, the City of Plant City intends to establish an annual contract for cured‑in‑place pipe (CIPP) lining services. The selected contractor(s) will provide trenchless rehabilitation of existing gravity sewer mains throughout the collection system. Work under this contract will include, but not be limited to, CIPP lining, point repairs, reinstatement of service laterals, and related preparatory and restoration activities.

More opportunities from Florida → Utilities Maintenance

Same awarding agency

NAICS: 541330
New
SLED
Lift Station Communication Improvement (FEMA)
Solicitation # 26-051UM-RFP
The City of Plant City is soliciting proposals for the Lift Station Communication Improvement project to modernize the Remote Terminal Unit (RTU) communication platform across 55 wastewater lift stations. The primary objective is to enhance system reliability, resiliency, and operational performance by deploying a new cellular-based communication network and integrating hardware for seamless connectivity with the City's SCADA system. This turnkey project requires the contractor to provide complete system design and furnish pre-configured, pre-packaged communication assemblies. The work is partially funded by a FEMA grant through the Florida Division of Emergency Management, with a total project cost of 569,751.00 dollars, consisting of a federal share of 427,313.25 dollars and a non-federal share of 142,437.75 dollars. The project is governed by strict federal and local requirements, including compliance with the Davis-Bacon Act, the Copeland Anti-Kickback Act, and the Americans with Disabilities Act. Installation must be performed by a licensed electrical contractor, and all materials and labor must be warranted for at least two years from the date of formal acceptance. Proposals are due by November 19, 2026, and will be evaluated based on a points-based system focusing on the ability to furnish services, experience and qualifications, and cost. Award selection will be determined by the collective scores of an evaluation committee, with a specific emphasis on the proposer's ability to minimize downtime and provide a demonstrated RTU solution.
Engineering Services

POSTED

1 day ago

DEADLINE

in 22 days
View Details
NAICS: 238210
New
SLED
Plant City Utilities Communication Tower Generator Replacement (FEMA)
Solicitation # 26-056UM-IFB
The City of Plant City, Florida, is soliciting bids under solicitation number 26-056UM-IFB for the replacement of a communication tower generator. This construction project involves the removal of the existing generator and the installation of a complete standby power system, featuring an EPA-certified 14 kW diesel standby generator, an automatic transfer switch, a generator pad, and a sub-base fuel tank capable of at least 48 hours of runtime. The project is partially funded by a FEMA grant via the Florida Division of Emergency Management and must adhere to the terms of Sub-Recipient Agreement Checklist HMGP contract no. H1319. Substantial completion is required within 360 calendar days from the Notice to Proceed, with a total performance period of 390 calendar days. The contract will be awarded to the lowest responsive and responsible bidder based on evaluations of licensure, certifications, prior bond history, and references. Technical requirements include compliance with MIL-STD 705 B, NFPA 110, and NEMA MG1-22.40, with acceptance testing to be performed by a factory-trained representative and witnessed by the owner. Bidders must comply with extensive federal and state regulations, including the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Uniform Federal Accessibility Standards. Administrative requirements include quarterly invoicing with detailed supporting documentation, adherence to GAAP, and the provision of payment and performance bonds. Proposals must be submitted via OpenGov by December 3, 2026, at 2:00 p.m.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

6 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS