Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
The City of Florence is soliciting sealed bids from qualified vendors to provide asbestos abatement and demolition services for structures and lot clearing at 306 and 605 W. Sumter Street in South Carolina. Asbestos abatement is specifically required for the 306 W. Sumter Street location. The selected contractor is responsible for obtaining all necessary permits and ensuring all work is performed according to generally acceptable professional standards and applicable governmental regulations. Laboratory analysis for asbestos reports must be conducted by facilities accredited by the National Voluntary Laboratory Accreditation Program.
The project must be completed within 45 days after the issuance of a Notice to Proceed, with liquidated damages of $100.00 per day assessed for failure to meet this timeline. The City intends to award the contract to the lowest responsible and responsive bidder, evaluating factors such as past performance, client references, geographic location, and timeliness of delivery. Bidders must adhere to equal opportunity employment standards and may be required to provide bonding, though alternatives such as a general liability insurance policy or a certified check for the full contract amount may be accepted. The solicitation is identified as number 2026-79, with a response deadline of December 4, 2026.
General Info
Florence seeks bids for asbestos abatement and demolition at two Sumter Street sites.
HighAI Summary for 314_1_2-warley.pdf: A technical specification document requiring that all labels, dimensions, legends, callouts, and notes be included in the image.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 602 Lynch Street Asbestos Inspection Report: An asbestos inspection report dated July 29, 2026, prepared by ECH Consultants for the City of Florence. The report details a visual inspection and bulk sample analysis of a single-story wooden structure at 602 Lynch Street intended for future demolition. The survey found no asbestos-containing materials (ACM) in the analyzed samples.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Asbestos Inspection Report - 205 Timmons Street: An asbestos inspection report dated July 29, 2026, prepared by ECH Consultants for the City of Florence. The report details a visual inspection and bulk sample analysis of a structure at 205 Timmons Street scheduled for demolition to ensure compliance with EPA and SCDES regulations. The inspection concluded that no asbestos-containing materials (ACM) were identified.
PDF
PDF, High priority: read this first19 pages · specifications
HighAI Summary for Asbestos Inspection Report - 306 W. Sumter Street: An asbestos inspection report dated August 28, 2026, prepared by ECH Consultants for the City of Florence. The report identifies asbestos-containing materials (specifically joint compound) at 306 W. Sumter Street to be removed prior to scheduled demolition.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Asbestos Inspection Report - 312 Mortimer Street: An asbestos inspection report dated July 29, 2026, prepared by ECH Consultants for the City of Florence. The report details a visual inspection and bulk sample analysis of the structure at 312 Mortimer Street prior to scheduled demolition, identifying positive asbestos findings in window glazing and drywall joint compound.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Asbestos Inspection Report - 314 1/2 Warley Street: An asbestos inspection report dated July 29, 2026, prepared by ECH Consultants for the City of Florence. The report details a visual inspection and bulk sample analysis of a two-story wooden structure at 314 1/2 Warley Street to identify asbestos-containing materials (ACM) prior to scheduled demolition. Key findings include positive results for non-friable cementitious siding.
PDF
PDF, High priority: read this first29 pages · specifications
HighAI Summary for Asbestos Inspection Report - 459 Pine Street: An asbestos inspection report dated July 15, 2026, prepared by ECH Consultants for the City of Florence. The report details a visual inspection and bulk sample analysis of a single-story wooden structure at 459 Pine Street scheduled for demolition. The findings indicate that no asbestos-containing materials (ACM) were identified across eleven samples of plaster, glazing, and shingles.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Asbestos Inspection Report - 515 W. Marion Street: An asbestos inspection report dated July 29, 2026, prepared by ECH Consultants for the City of Florence. The report details a visual inspection and bulk sample analysis of a single-story wooden structure at 515 W. Marion Street scheduled for demolition. Ten samples of drywall and joint compound were analyzed via Polarized Light Microscopy (PLM), and no asbestos-containing materials (ACM) were detected.
PDF
PDF, High priority: read this first26 pages · specifications
HighAI Summary for Asbestos Inspection Report - 605 W. Sumter Street: An asbestos inspection report dated August 28, 2026, prepared by ECH Consultants for the City of Florence. The report details a visual inspection and bulk sample analysis of a single-story wooden structure at 605 W. Sumter Street scheduled for demolition. The inspection found no asbestos-containing materials (ACM) in the tested glazing and shingles.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Asbestos Inspection Report - 707 N. Bradford Street: An asbestos inspection report dated July 29, 2026, prepared by ECH Consultants for the City of Florence. The report details a visual inspection and bulk sample analysis of the property at 707 N. Bradford Street to identify asbestos-containing materials (ACM) prior to scheduled demolition. Findings indicate that approximately 200 linear feet of glazing is positive for non-friable asbestos.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Asbestos Inspection Report - 708 W. Dixie Street: An asbestos inspection report dated July 29, 2026, prepared by ECH Consultants for the City of Florence. The report details a visual inspection and bulk sample analysis of a 650 sq ft wooden structure at 708 W. Dixie Street intended for future demolition. The findings indicate that no asbestos-containing materials (ACMs) were detected in the sampled texture, drywall, and shingles.
PDF
PDF, High priority: read this first26 pages · specifications
HighAI Summary for Asbestos Inspection Report - 823 Waverly Avenue: An asbestos inspection report dated August 28, 2026, prepared by ECH Consultants for the City of Florence. The report details a visual inspection and bulk sample analysis of a structure at 823 Waverly Avenue scheduled for demolition. It identifies approximately 1,000 square feet of friable asbestos-containing tan wall mud that must be removed prior to demolition.
PDF
PDF, High priority: read this firstitb
HighAI Summary for City of Florence - Asbestos Abatement and Demolition ITB: An Invitation to Bid (ITB) issued by the City of Florence seeking qualified companies to provide asbestos abatement and demolition services. The document outlines bidder instructions, definitions for responsible and responsive bidders, and detailed policies regarding local, minority, woman, and veteran-owned business preferences.
PDF
PDF, High priority: read this firstitb
HighAI Summary for City of Florence - Baroody Street Streetscape Invitation for Bids: Invitation for Bids (ITB) for the Baroody Street Streetscape project for the City of Florence. Includes requirements for South Carolina Contractor's Licensing, a mandatory pre-bid meeting on October 13, 2026, and bid security requirements (5% bid bond). Inquiries are due by October 19, 2026.
PDF
PDF, High priority: read this first11 pages · itb
HighAI Summary for City of Florence ITB No. 2026 80 - Asbestos Abatement and Demolition Services: Invitation to Bid (ITB) No. 2026 80 issued by the City of Florence for asbestos abatement and demolition services at 823 Waverly Avenue and 459 Pine Street. Sealed bids are due by December 2, 2026, at 2:00 pm. The document outlines submission requirements, non-discrimination policies, and specific preference guidelines for local and minority-owned business enterprises.
PDF
PDF, High priority: read this firstmaster-plan
HighAI Summary for City of Florence Pedestrian Master Plan: This document is the City of Florence Pedestrian Master Plan developed under the South Carolina Department of Health and Environmental Control's SC PHASE Pedestrian Planning Project. It aims to improve pedestrian connectivity, safety, and walkability in Florence through community engagement, equity-based planning, and safe access to healthy foods. The plan includes project background, community context, data collection, existing conditions analysis, recommendations, and an implementation plan. It emphasizes enhancing pedestrian infrastructure, increasing walking trips, and leveraging the trail network to link residents to key destinations. The plan supports economic development, neighborhood strengthening, and quality of life improvements for all ages and abilities.
PDF
PDF, High priority: read this firstpolicy-manual
HighAI Summary for City of Florence Purchasing and Contracting Policies and Procedures Manual: This document is the Purchasing and Contracting Policies and Procedures Manual for the City of Florence, SC. It serves as a comprehensive guide for city employees and vendors on procurement policies and procedures to ensure fair, equal, and impartial administration. The manual includes sections on responsibilities of the Purchasing Agent, ethics in purchasing, purchasing policies, procedures for bids and proposals, specifications, payments to contractors, and appeals processes. It emphasizes ethical conduct, prohibition of conflicts of interest, and compliance with local, state, and federal laws. The manual is subject to periodic revision with City Manager approval and aims to promote integrity, competition, and efficiency in city procurement activities.
PDF
PDF, High priority: read this firstmaster-plan
HighAI Summary for City of Florence SC Stormwater Master Plan: This Stormwater Master Plan (SWMP) for the City of Florence, South Carolina, provides a comprehensive guide for stormwater management and flood mitigation. Prepared by AECOM, the plan integrates existing stormwater program components into a cohesive strategy addressing infrastructure design, ecological restoration, and NPDES compliance. It serves as a living document to prioritize projects over 20 years, incorporating asset management, community input, and regulatory compliance. The plan includes detailed sections on baseline data, stormwater modeling, design standards, capital improvement projects, project prioritization, and funding sources. It aims to enhance collaboration among responsible parties and ensure long-term viability and environmental stewardship.
PDF
PDF, High priority: read this firstmaster-plan
HighAI Summary for City of Florence Sewer Collection System Master Plan 2025: This document is the Sewer Collection System Master Plan prepared for the City of Florence, South Carolina, dated 2025. It provides a comprehensive evaluation of the city's sanitary sewer system, including hydraulic modeling, flow monitoring, and system capacity analysis. The plan addresses existing deficiencies and projects future growth through 2045, proposing a 20-year Capital Improvement Program (CIP) with phased infrastructure projects to ensure system reliability and accommodate growth. Key components include system characterization, hydraulic analysis, growth projections, and prioritized CIP projects, including an Inflow and Infiltration Reduction Program. The plan aims to mitigate capacity constraints and sanitary sewer overflows, supporting sustainable sewer system management.
PDF
PDF, High priority: read this firstmaster-plan
HighAI Summary for City of Florence Water Distribution Master Plan: The City of Florence Water Distribution Master Plan, prepared by AECOM Technical Services, Inc., is a comprehensive guide for managing and optimizing the city's water distribution system through 2045. It evaluates current system conditions, projects future water demands, and outlines a strategic Capital Improvement Program to ensure system reliability, resiliency, efficiency, and regulatory compliance. The plan addresses challenges such as expanding storage capacity, reducing non-revenue water, and improving water quality. It includes recommendations for infrastructure upgrades, system monitoring, and control enhancements, as well as a proactive water supply management strategy to secure existing capacity and maintain emergency resilience. The document also provides population and demand growth projections and prioritizes capital improvements with cost estimates and timelines.
PDF
PDF, High priority: read this firstcomprehensive-plan
HighAI Summary for Florence, South Carolina Comprehensive Plan Adopted 06.12.23: This document is the Florence, South Carolina Comprehensive Plan adopted by the Florence City Council on June 12, 2023. It serves as a long-range planning framework guiding development, redevelopment, and community enhancement efforts through 2041. The plan includes sections on growth capacity, land use and development, housing and neighborhoods, transportation, economic development, recreation and amenities, and plan implementation. It also contains an Existing City Report finalized in 2021. The plan was developed with input from city officials, planning commissions, advisory committees, and consultants, and aims to address challenges and opportunities for Florence's future while preserving its history and quality of life.
PDF
PDF, High priority: read this first11 pages · itb
HighAI Summary for Invitation to Bid No. 2026-79: Asbestos Abatement and Demolition Services: Invitation to Bid (ITB) No. 2026-79 issued by the City of Florence for asbestos abatement and demolition services at 306 and 605 W. Sumter Street. Bids are due by December 4, 2026, at 2:00 pm. The document outlines submission requirements, non-discrimination policies, and specific preferences for local and minority-owned businesses (MBE/WBE/VBE).
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for ITB No. 2026-76 Addendum No. 1 - Asbestos Abatement and Demolition Services: Addendum No. 1 to Invitation to Bid No. 2026-76 for Asbestos Abatement and Demolition Services. This document modifies the scope of work to include specific demolition requirements for 205 Timmons Street, 515 W. Marion Street, 602 Lynch Street, and 708 W. Dixie Street, including full structure removal, utility disconnection, site clearing, grading, and seeding.
PDF
PDF, Low prioritybid-tabulation
LowAI Summary for 2026-86 Bid Tabulation: A bid tabulation document for project 2026-86 containing factual data and source references.
PDF
PDF, Low priorityplan
LowAI Summary for Florence Downtown Plan Final Adopted June 2023: The Florence Downtown Plan, finalized and adopted in June 2023, outlines a comprehensive vision and strategy for the development and revitalization of Downtown Florence through 2030. It builds on previous master plans and recent successes, emphasizing economic vitality, design, housing, infrastructure, and partnerships. The plan includes detailed sections on key areas, corridors, housing goals, economic development, and infrastructure improvements, aiming to create a connected, vibrant, and inclusive downtown community. It reflects extensive community and stakeholder input and serves as a guiding document for future growth and development initiatives.
he City of Florence is accepting sealed bids from qualified vendors to provide asbestos abatement and demolition services at 306 and 605 W. Sumter Street.
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.