Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Asphalt and Concrete Repaving Services

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

San Bernardino, CA, 92415, USA

Set-Aside

NONE

Documents

This scope was carved out of SPD127-SPDAD-6610.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Cedar Avenue and Santa Ana Avenue Streetlight Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 27 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 7 documents on the prime contractFrom Cedar Avenue and Santa Ana Avenue Streetlight Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Administration
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Administration
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs repaving of asphalt or concrete surfaces for prime contractors on San Bernardino County Department of Public Works projects. Removes old pavement, grades, and installs new asphalt or concrete to match existing site conditions. Ensures ADA compliance for pedestrian and curb areas. Delivers restored road and sidewalk surfaces.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 25 days
View Details
NAICS: 237310
New
SLED
Grand Avenue Rehabilitation: First Street To Santa Ana Boulevard
Solicitation # 26-6711
The City of Santa Ana is soliciting bids for the rehabilitation of Grand Avenue from First Street to Santa Ana Boulevard under project number 26-6711. The scope of work includes excavation, cold milling, grading, and the removal and replacement of asphalt concrete pavement, Portland cement concrete, sidewalks, curb ramps, cross gutters, and curb and gutter. Additional requirements include adjusting utility covers and survey monument frames, as well as new signing and striping with the installation of new traffic loops. The contractor must utilize Procore construction management software and adhere to 2018 Caltrans Standard Specifications, the 2014 California Manual on Uniform Traffic Control Devices, and City of Santa Ana Standard Plans. The contract will be awarded to the lowest responsible bidder based on the total base bid. Required submissions via PlanetBids must include a bid proposal guaranty of at least ten percent of the bid aggregate. Upon award, the contractor must provide performance and payment bonds each totaling one hundred percent of the contract price, a warranty bond, and evidence of Worker's Compensation Insurance. The project is subject to California State Labor Code prevailing wage rates and requires compliance with the Copeland Anti-Kickback Act and various nondiscrimination clauses. There is no specified set-aside status for this solicitation.
CITY OF SANTA ANA

POSTED

about 2 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237310
New
SLED
Contract For Construction Of Hud-Funded Ada Improvements For The Community House At 2020 R Street
Solicitation # 26-27-19
The City of Bakersfield Purchasing Division is soliciting bids for the construction of HUD-funded ADA improvements at the Community House located at 2020 R Street. The project scope includes the installation of concrete sidewalks, curb and gutter, and asphalt paving, with a total budgeted amount of $60,000. The project is expected to be completed within 25 working days, and the resulting contract will be for a one-year period. Bids must be submitted under sealed cover by December 1, 2026, and must include a bid security deposit of 10% of the bid amount. The contract will be awarded to the lowest responsive and responsible bidder based on criteria including price, federal compliance, reputation, experience, and capacity to initiate work. The contractor is responsible for providing all labor, materials, and equipment, ensuring that all work meets current ADA requirements and Caltrans standards. Compliance with the Davis-Bacon Act, Federal Labor Standards, and HUD Section 3 economic opportunities is mandatory. Successful bidders must provide performance and labor and materials bonds for 100% of the bid amount within ten days of request. Payment will be issued within 30 days of an approved itemized invoice, potentially as a lump sum upon completion. There is no set-aside status for this solicitation.
Purchasing Department of City of Bakersfield

POSTED

about 3 hours ago

DEADLINE

in 11 days
View Details

More opportunities from California → Administration

Same awarding agency

NAICS: 237130
New
SLED
Cedar Avenue and Santa Ana Avenue Streetlight Project
Solicitation # SPD127-SPDAD-6610
The Cedar Avenue and Santa Ana Avenue Streetlight Project is a construction solicitation issued by the San Bernardino County Department of Public Works - Special Districts for County Service Area SL-1. The project scope requires the contractor to provide all supervision, labor, equipment, and materials to install 1,220 linear feet of 3-inch conduit to serve four streetlights at the intersection of Cedar Avenue and Santa Ana Avenue in Bloomington, California. The work includes backfilling, repaving of asphalt or concrete, and the management of permitting and traffic control. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid, with responsiveness requiring the submission of at least three projects of similar size and scope completed within the last five years. Bidders must possess a California Class A Contractor's License and be registered with the Department of Industrial Relations. The project mandates compliance with California Labor Code sections 1770 and 1773 regarding prevailing wages, as well as OSHA and California State Construction Safety Orders. Key requirements include the provision of a bid bond of at least 10% of the total bid price, and performance and payment bonds equal to 100% of the contract sum. Technical standards are governed by SCE's MC 860 and Underground Structures Standards, with specific quality criteria for precast vaults and manholes. The contractor must also adhere to the Americans with Disabilities Act and various federal and state non-discrimination executive orders. There is no specified set-aside status for this solicitation.
Power and Communication Line and Related Structures Construction

POSTED

about 15 hours ago

DEADLINE

in 26 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS