Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on September 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Asphalt Paving and Concrete Work Order

Closed
KC001500State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves comprehensive asphalt paving repair and improvement work within the King County Parks Regional Trail System and associated parking facilities. The scope includes asphalt overlay, patching, crack sealing, surface repairs, excavation, grading, compaction, and pavement marking, alongside concrete work such as walkways, curbs, and ADA ramps. Additional tasks encompass installing chain link fences, signage, root barriers, bollards, wheel stops, erosion and water pollution control measures, and temporary traffic management. The project aims to enhance the safety, accessibility, and durability of park infrastructure through these extensive repairs and upgrades. The solicitation, titled "Asphalt Paving and Concrete Work Order," was posted in September 2025 with a response deadline of October 16, 2025. The contract is valued between five and fifteen million dollars, with a not-to-exceed amount of two million dollars and a duration of up to two years. It emphasizes subcontracting opportunities, apprenticeship and small contractor utilization, and adherence to non-discrimination policies. The bidding process involves detailed technical specifications, bid schedules, and special provisions, including requirements for bid bonds, performance bonds, and compliance with wage and labor standards. The project is managed by King County’s Parks and Recreation Division, with primary contact being Julie Thiele, and aims to ensure high-quality, durable improvements to the county’s trail and parking infrastructure through competitive bidding and adherence to established technical and safety standards.

General Info

Place of Performance

WA, USA

Set-Aside

NONE

Documents

3
PDF, High priority: read this first31 pages · ifb
High
PDF, High priority: read this first208 pages · ifb
High
XLSX, High priority: read this first4 pages · other
High

Read all 3 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 15 days
  • PURIFIED WATER REPLENISHMENT SAN JACINTO VALLEY ADVANCED WATER PURIFICATION FACILITY SPECIFICATION NO. 1472WOpen now, due in 2 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → King County
Contacts1 person available
OfficeN/A

Full Description

Show more
The work will primarily involve asphalt paving repair and improvement work on the King County Parks Regional Trail System and parking lot facilities. The work includes, but is not limited to asphalt overlay, asphalt patching and repair, surfacing materials, crack sealing, pavement repair excavation including haul, grading and compaction of subgrade, pavement marking, concrete walkway, curbs, ADA ramps, chain link fence, signage, root barriers, root pruning/removal including base repair, bollards, wheel stops, erosion/water pollution control, and temporary traffic control.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS