This Solicitation opportunity from Washington was posted on September 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Asphalt Paving and Concrete Work Order
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves comprehensive asphalt paving repair and improvement work within the King County Parks Regional Trail System and associated parking facilities. The scope includes asphalt overlay, patching, crack sealing, surface repairs, excavation, grading, compaction, and pavement marking, alongside concrete work such as walkways, curbs, and ADA ramps. Additional tasks encompass installing chain link fences, signage, root barriers, bollards, wheel stops, erosion and water pollution control measures, and temporary traffic management. The project aims to enhance the safety, accessibility, and durability of park infrastructure through these extensive repairs and upgrades. The solicitation, titled "Asphalt Paving and Concrete Work Order," was posted in September 2025 with a response deadline of October 16, 2025. The contract is valued between five and fifteen million dollars, with a not-to-exceed amount of two million dollars and a duration of up to two years. It emphasizes subcontracting opportunities, apprenticeship and small contractor utilization, and adherence to non-discrimination policies. The bidding process involves detailed technical specifications, bid schedules, and special provisions, including requirements for bid bonds, performance bonds, and compliance with wage and labor standards. The project is managed by King County’s Parks and Recreation Division, with primary contact being Julie Thiele, and aims to ensure high-quality, durable improvements to the county’s trail and parking infrastructure through competitive bidding and adherence to established technical and safety standards.
General Info
Agency
Place of Performance
WA, USASet-Aside
Documents
3AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 15 days
- PURIFIED WATER REPLENISHMENT SAN JACINTO VALLEY ADVANCED WATER PURIFICATION FACILITY SPECIFICATION NO. 1472WOpen now, due in 2 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
