This Solicitation opportunity from California was posted on September 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Asset Protection Project – Painting and Coating is a multi-prime solicitation issued by Solano County for work located at 550/600 Union Ave in Fairfield, California. Funded by OES/FEMA, the project is part of a broader effort to protect county properties from seasonal stormwater damage. The primary scope of work includes providing all labor, materials, and equipment for the painting and coating of interior and exterior surfaces, specifically including bollards and handrails. The contractor is responsible for comprehensive surface preparation, the implementation of site protection to prevent overspray, and the submission of daily reports via Procore.
Bidders must attend a mandatory pre-bid conference on October 6, 2026, and submit their responses by October 19, 2026. Required bid documentation includes a statement of experience from the last five years, a subcontractor list for any entity performing more than 0.5 percent of the work, and a bid bond or certified check for 10 percent of the total base bid. Upon award, the successful contractor must provide performance and payment bonds for 100 percent of the contract amount within five calendar days of the Notice to Proceed.
The project is subject to strict regulatory and safety standards, including State Prevailing Wages, OSHA and Cal OSHA safety regulations, and federal procurement requirements under 2 CFR 200. Performance milestones include the submission of a 90-day detailed schedule within ten days of the Notice to Proceed, a 30-day punch list period, and a post-acceptance inspection 11 months after final acceptance. Quality control is managed through the use of approved field mock-ups, which serve as the standard for acceptable quality for the duration of the project.
General Info
Solano County painting and coating project in Fairfield; bids due October 19, 2026.
PDF, High priority: read this first22 pages · specifications
HighAI Summary for 1791 Fairfield Justice Campus - Section 09 90 00 Painting and Coating: Technical specifications for painting and coating for the Fairfield Justice Campus Asset Protection Project. Revised March 3, 2026, this document defines the scope of work, surface preparation, application methods, submittal requirements, and inspection standards for interior and exterior surfaces.
PDF
PDF, High priority: read this first9 pages · specifications
HighAI Summary for 1791 Fairfield Justice Campus - Section 31 00 00 Embankment Construction: Technical specifications for embankment construction for the Fairfield Justice Campus Asset Protection Project. This revised document (dated February 23, 2026) details requirements for engineered fill materials, ASTM testing standards, submittal procedures, and specific equipment requirements for tamping and rubber-tired rollers.
PDF
PDF, High priority: read this first77 pages · construction-drawings
HighAI Summary for 20251211 Volume 2 Parking and Security Improvements IFC Rev 1 Drawing Set: This document is the Issued For Construction (IFC) drawing set for Volume 2: Parking and Security Improvements at the Solano County Downtown Fairfield Justice Campus, dated September 29, 2025. It includes cover sheets, general notes, sheet index, and detailed construction drawings prepared by Mead & Hunt, Inc. The drawings specify project location, agency contacts, general construction notes, survey notes, and coordination requirements. The document emphasizes compliance with applicable laws, safety regulations, and coordination with utilities and contractors. It is intended for use in construction and includes instructions for phasing and asset protection.
PDF
PDF, High priority: read this first1 page · sow
HighAI Summary for Access Requirements - Construction Phasing and Vehicle Access: This document outlines access requirements related to construction phasing and vehicle/pedestrian access points for a project involving parking lot improvements. It specifies critical emergency vehicle access points that must remain open 24/7, important operational vehicle access points requiring advance notice before disruption, and major traffic access ways needing traffic control plans and permits. Pedestrian access points are also detailed with required notices and alternate access plans. The document includes references to various facilities and locations such as the Hall of Justice, Solano Justice Center, and Sheriff facilities. The version date indicated is November 21, 2025. The content is technical and critical for contractor compliance during construction activities to ensure uninterrupted access and safety.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Asset Protection Project – Painting and Coating Project Manual: Project Manual issued for bid on September 25, 2026, for the Asset Protection Project – Painting and Coating at 550/600 Union Ave, Fairfield, CA. The document includes a comprehensive table of contents covering bidding requirements (Division 00), general requirements (Division 01), and technical specifications across multiple divisions including concrete, metals, finishes, and electrical. The project involves flood protection installations funded by OES/FEMA and is being bid in a multi-prime manner by Solano County.
PDF
PDF, High priority: read this first20 pages · specifications
HighAI Summary for Asset Protection Volume 1 - General Notes and Sheet Index: Revision 4 of the Asset Protection Volume 1 document. It contains general construction notes, contractor responsibilities regarding record drawings and legal compliance, earthwork generalities, and a sheet index covering mechanical and electrical plans for pump stations and storm drainage vaults.
PDF
PDF, High priority: read this first14 pages · specifications
HighAI Summary for Asset Protection Volume 1 - General Notes and Specifications: Revision 3 of the Asset Protection Volume 1 document. It contains general construction notes, earthwork requirements, a sheet index, and technical provisions for materials and workmanship. The document outlines contractor responsibilities regarding record drawings, equipment installation, and manufacturer product compliance.
PDF
PDF, High priority: read this first12 pages · specifications
HighAI Summary for Asset Protection Volume 1 - General Notes and Specifications: Revision 1 of the Asset Protection Volume 1 document containing general notes, earthworks requirements, and a sheet index for civil and general plans. It outlines contractor responsibilities regarding record drawings, safety compliance, traffic control, and erosion/sediment control, and includes a detailed index of project sheets and sections covering geology, water quality, and wastewater management.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for Asset Protection Volume 1 - Revision 5: Technical drawing and specifications document for a Flap Gate Assembly, including top, front, and right views, as well as detailed hinge arm and bushing specifications. Prepared by Mead and Hunt.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Asset Protection Volume 2 Sheet C-630: Technical drawing or specification sheet (Sheet C-630) from Asset Protection Volume 2, Revision 4, dated 2026-08-19. The document contains a data table relating to gate numbers and Clay Street locations.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Asset Protection Volume 2 Sheet C-637 - Pedestrian Gate Details: Technical drawing and specification sheet (Revision 4) for medium/high security fencing pedestrian gates. Includes installation notes, footing details, and compliance requirements for California Building Code (CBC) Chapter 17, including special inspections for high-strength bolts, welding, concrete, and geotechnical work. Prepared by Mead & Hunt, Inc. for Solano County Department of Community Development.
PDF
PDF, High priority: read this first11 pages · contract-document
HighAI Summary for Exhibit C - General Terms and Conditions 6/12/18: This document, titled Exhibit C - General Terms and Conditions dated June 12, 2018, outlines the contractual terms between the County and Contractor. It covers key provisions including closing out procedures with final payment requirements, time of performance conditions, termination rights for both parties, and signature authority. It also details Contractor representations regarding professional standards and licensure. Insurance requirements are extensively specified, including minimum coverage limits for general liability, automobile liability, workers' compensation, employer's liability, cyber liability, and professional liability, along with provisions for deductibles, self-insured retentions, and additional insured endorsements. The document ensures the County's protection and clarifies Contractor obligations throughout the contract term.
PDF
PDF, High priority: read this first51 pages · specifications
HighAI Summary for Fairfield Justice Campus Asset Protection Project - Geotechnical Design Report: Geotechnical Design Report dated September 3, 2021, prepared by Cal Engineering & Geology (CE&G) for Mead & Hunt, Inc. The document provides subsurface investigations, laboratory testing, and design recommendations for flood protection infrastructure (floodwalls, gates, and berms) at the Solano County Justice Center in Fairfield, CA.
PDF
PDF, High priority: read this first1 page · contract-document
HighAI Summary for Purchase Order Terms and Conditions: This document outlines the terms and conditions governing a Purchase Order between a County and a Vendor. It includes provisions on acceptance, non-discrimination, assignment, cash discounts, changes, compliance with laws, governing law (California), delivery, insurance, force majeure, formal bids, hazardous materials, timeliness, indemnity, sales and use tax, and termination clauses for cause and convenience. The document is intended to ensure compliance, define responsibilities, and protect the interests of both parties in the procurement process.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for Revision 2 Asset Protection Volume 1 - Approved: Approved Revision 2, Volume 1 asset protection plan with technical drawing details, wall types, notes, dimensions, and structural/construction requirements. The content includes plaza, sidewalk, ramp, fence, curb/gutter, and wall section details, plus references to specifications and structural excavation/backfill requirements. It appears to be part of a project design/specification set rather than a solicitation or award document.
PDF
PDF, High priority: read this first9 pages · sow
HighAI Summary for Section 31 23 16 Structure Excavation and Backfill: Section 31 23 16 for the Fairfield Justice Campus Asset Protection Project, revised February 23, 2026. This project manual section specifies requirements for structure excavation and backfill, including labor, materials, excavation, shoring, dewatering, pumping, compaction, and restoration of excavated areas. It cites ASTM references, OSHA/Cal OSHA and California Labor Code requirements, and requires contractor-submitted detailed excavation and dewatering plans, including engineered shoring for deeper excavations and regulatory compliance for discharge and groundwater control.
PDF
PDF, High priority: read this first2 pages · modification
HighAI Summary for SI 099000-1 Painting and Coating Supplemental Instruction: Issued on 4/30/2026 for the Justice Center Asset Protection project, this Supplemental Instruction (SI 099000-1) provides a Painting & Coating Schedule to be added to Spec Section 09 90 00. The document specifies surface preparation, primer, and coating requirements for structural steel, tanks, and pipes. The instruction explicitly states there is no change to the Contract Sum or Contract Time.
PDF
PDF, High priority: read this first10 pages · specifications
HighAI Summary for Solano County Asset Protection Project Schedule: A project schedule and milestone document for the Solano County Asset Protection project (FEMA), featuring a data date of May 2024. It details construction phases, activity IDs, and specific bid packages for demolition, site utilities, concrete, electrical, and earth work, including detailed task timelines for various street locations.
PDF
PDF, High priority: read this first101 pages · specifications
HighAI Summary for Solano County Downtown Fairfield Justice Campus - Asset Protection Project Volume 1: Construction drawing set (Volume 1) for the Asset Protection Project at the Downtown Fairfield Justice Campus, issued for construction on September 29, 2025. The document includes the cover sheet, vicinity maps, project location details, agency/utility contacts, and general construction notes regarding record drawings, safety compliance, and site coordination.
PDF
PDF, Low priority9 pages · guidance
LowAI Summary for Hazard Mitigation Assistance Contracting Guidance for Non-State Subrecipients: This publication provides an overview of federal procurement requirements for Non-State Subrecipients receiving FEMA Hazard Mitigation Assistance funds. It outlines compliance with 2 CFR 200, FEMA Program Policy, and the PGFMS. Key content includes standards for full and open competition, record-keeping requirements, affirmative steps for DBE/LSA inclusion, and a breakdown of eligible procurement methods based on cost thresholds (Micro Purchases, Small Purchases, Sealed Bids, and Competitive Proposals).