Stevenson Bridge (23C0092) at Putah Creek Rehabilitation Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Stevenson Bridge (23C0092) at Putah Creek Rehabilitation Project, managed by Solano County Resource Management under the oversight of the California Department of Fish and Wildlife, involves comprehensive structural upgrades to a historic bridge damaged by seismic activity, scour, cracking, and deterioration. The work includes repairing and replacing the bridge superstructure such as the deck, drains, and railings, installing ten cast-in-drilled-hole pilings to reinforce the foundation, replacing the south abutment retaining wall, and applying rock slope protection around piers and abutments for erosion control. To facilitate construction within Putah Creek, a temporary stream crossing and clear water diversion system will be installed in compliance with Caltrans Best Management Practices NS-4 and NS-5, enabling dry work conditions while minimizing aquatic disruption. A permanent gravel access road will be constructed on the northeast side of the bridge to support future maintenance, and approximately 1,000 feet of the southern roadway approach will be realigned outside the riparian zone to improve safety by eliminating sharp turns. The project requires the removal of 22 riparian trees and six elderberry shrubs, with mitigation measures in place to offset ecological impacts. Permanent habitat impacts total 0.366 acres, primarily from piling installation, the access road, and rock slope protection, while temporary impacts from the crossing and diversion amount to 0.134 acres, all requiring full restoration post-construction. The project is authorized under Lake and Streambed Alteration Agreement EPIMS-SOL-56689-R3 pursuant to Fish and Game Code Section 1602 and complies with CEQA through a Mitigated Negative Declaration. Solano County serves as the lead agency, with CDFW and the Central Valley Flood Protection Board providing regulatory oversight and final acceptance. The project’s construction is governed by state environmental standards rather than federal acquisition clauses, with no contract value, pricing, payment terms, or typical FAR clauses disclosed in the available documentation. All activities must adhere strictly to approved environmental protocols, with inspections conducted on-site by regulatory agencies to ensure compliance with water quality, habitat protection, and construction performance standards.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
