Stevenson Bridge (23C0092) at Putah Creek Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Stevenson Bridge Rehabilitation Project, identified by solicitation number WA2025072 and agreement EPIMS-SOL-56689-R3, is a comprehensive infrastructure effort by Solano County to repair the 296-foot long Stevenson Bridge at Putah Creek. The project focuses on addressing seismic deficiencies, scour, cracks, spalling, and de-lamination while preserving the bridge's historical architectural features. Key structural work includes the repair and replacement of the bridge superstructure, the installation of ten cast-in-drilled-hole pilings for foundation support, the replacement of the south abutment retaining wall, and the application of rock slope protection for scour prevention. Additionally, the project involves realigning approximately 1,000 feet of the southern roadway approach and relocating two utility poles to facilitate construction. To support these activities, the project includes the construction of a permanent gravel maintenance access road on the northeast side of the bridge and the installation of a temporary creek crossing and clear water diversion, designed according to Caltrans 2017 Best Management Practices. Environmental impacts include the removal of 22 riparian trees and 6 elderberry shrubs, with total permanent impacts to stream habitat calculated at 15,943 square feet and temporary impacts at 5,823 square feet. The project is located across Solano and Yolo Counties, approximately six miles southwest of Davis, and has been approved through Notices of Determination by the California Department of Fish and Wildlife and the Central Valley Flood Protection Board based on a Mitigated Negative Declaration.

General Info

Solano County project to rehabilitate Stevenson Bridge, addressing seismic and structural deficiencies.

Agency

California → Solano County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

Notice of Determination WA2025072 Stevenson Bridge Rehabilitation

PDFnotice-of-determination

EPIMS-SOL-56689-R3 Notice of Determination for Stevenson Bridge Road Rehabilitation

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Solano County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Solano County
Office AddressN/A
Contacts
Jordan BeatonEnvironmental Scientist
Riley MartinsonLead Agency Contact

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SOL-56689-R3), pursuant to Fish and Game Code section 1602, to the project Applicant, Solano County Resource Management. The Project is limited to repairs to an existing bridge (including bridge superstructure, and foundation), construction of a permanent maintenance access road, and construction of a temporary creek crossing. The Project purpose is to rehabilitate the existing bridge to address seismic deficiencies, scour, cracks, spalling, and de-lamination, while maintaining its historical architectural features. The Project will also realign approximately 1,000 feet of the southern roadway approach to eliminate two sharp turns; realignment will occur outside of the channel and riparian zone. The existing bridge is 296 feet long and 24 feet wide with two piers within the channel, and abutments on each bank of Putah Creek. To conduct bridge repairs as they relate to Project activities and future maintenance on the bridge, a permanent access road composed of gravel will be constructed on the northeast side of the bridge. To access the bridge for repairs a temporary creek crossing and a clear water diversion will be installed in Putah Creek to isolate construction activities that occur within the creek. The crossing and diversion will be designed consistent with the Caltrans Construction Site Best Management Practices (BMP) Manual (Caltrans 2017) in accordance with Non-Storm (NS) Water Management BMP NS-4 Temporary Stream Crossing and NS-5 Clear Water Diversion. The Project will remove 22 riparian trees and 6 elderberry shrubs (Sambucus mexicana) within the riparian zone. Bridge rehabilitation will involve the following elements: 1) repair and replacement of the bridge superstructure (deck, drains, railings, etc.), 2) repair of the bridge foundation, including installation of two cast-in-drilled-hole (CIDH) pilings per pier and abutment (ten pilings in total), 3) replacement of the abutment retaining wall on the south side of the bridge, and 4) installation of rock slope protection (RSP) around abutments and piers for scour protection. Repairs of the existing bridge foundations will occur outside of the water or in de-watered areas. The access road will result in 10,019 square feet (0.23 acres) of permanent impacts to stream habitat associated with construction of the road. The clear water diversion and creek crossing will result in a total of 5,823 square feet (0.134 acres) of temporary impacts to stream habitat associated with installation of headwalls, pipes, the de-watered area for access to the piers, and the creek crossing. Bridge repairs will result in 548 square feet of impacts per CIDH piling resulting in a total of 5,480 square feet (0.126 acres) of permanent impacts to stream habitat associated with CIDH piling installation. Placement of RSP will permanently impact 436 square feet (0.01 acres) of stream habitat. The Project’s permanent impacts to stream habitat total 15,943 square feet (0.366 acres) and the temporary impacts to stream habitat total 5,823 square feet (0.134 acres).

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS