Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Stevenson Bridge (23C0092) at Putah Creek Rehabilitation Project

Forecast
WA2025072State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Stevenson Bridge Rehabilitation Project, identified by solicitation number WA2025072 and agreement EPIMS-SOL-56689-R3, is a comprehensive infrastructure effort by Solano County to repair the 296-foot long Stevenson Bridge at Putah Creek. The project focuses on addressing seismic deficiencies, scour, cracks, spalling, and de-lamination while preserving the bridge's historical architectural features. Key structural work includes the repair and replacement of the bridge superstructure, the installation of ten cast-in-drilled-hole pilings for foundation support, the replacement of the south abutment retaining wall, and the application of rock slope protection for scour prevention. Additionally, the project involves realigning approximately 1,000 feet of the southern roadway approach and relocating two utility poles to facilitate construction. To support these activities, the project includes the construction of a permanent gravel maintenance access road on the northeast side of the bridge and the installation of a temporary creek crossing and clear water diversion, designed according to Caltrans 2017 Best Management Practices. Environmental impacts include the removal of 22 riparian trees and 6 elderberry shrubs, with total permanent impacts to stream habitat calculated at 15,943 square feet and temporary impacts at 5,823 square feet. The project is located across Solano and Yolo Counties, approximately six miles southwest of Davis, and has been approved through Notices of Determination by the California Department of Fish and Wildlife and the Central Valley Flood Protection Board based on a Mitigated Negative Declaration.

General Info

Solano County project to rehabilitate Stevenson Bridge, addressing seismic and structural deficiencies.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SOL-56689-R3), pursuant to Fish and Game Code section 1602, to the project Applicant, Solano County Resource Management. The Project is limited to repairs to an existing bridge (including bridge superstructure, and foundation), construction of a permanent maintenance access road, and construction of a temporary creek crossing. The Project purpose is to rehabilitate the existing bridge to address seismic deficiencies, scour, cracks, spalling, and de-lamination, while maintaining its historical architectural features. The Project will also realign approximately 1,000 feet of the southern roadway approach to eliminate two sharp turns; realignment will occur outside of the channel and riparian zone. The existing bridge is 296 feet long and 24 feet wide with two piers within the channel, and abutments on each bank of Putah Creek. To conduct bridge repairs as they relate to Project activities and future maintenance on the bridge, a permanent access road composed of gravel will be constructed on the northeast side of the bridge. To access the bridge for repairs a temporary creek crossing and a clear water diversion will be installed in Putah Creek to isolate construction activities that occur within the creek. The crossing and diversion will be designed consistent with the Caltrans Construction Site Best Management Practices (BMP) Manual (Caltrans 2017) in accordance with Non-Storm (NS) Water Management BMP NS-4 Temporary Stream Crossing and NS-5 Clear Water Diversion. The Project will remove 22 riparian trees and 6 elderberry shrubs (Sambucus mexicana) within the riparian zone. Bridge rehabilitation will involve the following elements: 1) repair and replacement of the bridge superstructure (deck, drains, railings, etc.), 2) repair of the bridge foundation, including installation of two cast-in-drilled-hole (CIDH) pilings per pier and abutment (ten pilings in total), 3) replacement of the abutment retaining wall on the south side of the bridge, and 4) installation of rock slope protection (RSP) around abutments and piers for scour protection. Repairs of the existing bridge foundations will occur outside of the water or in de-watered areas. The access road will result in 10,019 square feet (0.23 acres) of permanent impacts to stream habitat associated with construction of the road. The clear water diversion and creek crossing will result in a total of 5,823 square feet (0.134 acres) of temporary impacts to stream habitat associated with installation of headwalls, pipes, the de-watered area for access to the piers, and the creek crossing. Bridge repairs will result in 548 square feet of impacts per CIDH piling resulting in a total of 5,480 square feet (0.126 acres) of permanent impacts to stream habitat associated with CIDH piling installation. Placement of RSP will permanently impact 436 square feet (0.01 acres) of stream habitat. The Project’s permanent impacts to stream habitat total 15,943 square feet (0.366 acres) and the temporary impacts to stream habitat total 5,823 square feet (0.134 acres).

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, subsurface investigation, and shoring; pipeline and utility installation involving tunneling, boring, jacking, micro tunneling, and cathodic protection; and surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. The project also emphasizes adherence to storm water pollution prevention standards. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Additionally, Kiewit seeks partners capable of maintaining labor harmony and notes its existing signatory status with several collective bargaining agreements. Quotes are due by November 18, 2025, and should be submitted via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237310
New
SLED
Stow Road Sidewalk Improvements (Ravenna Street to E. Streetsboro (SR 303))
Solicitation # 50011
The City of Hudson, Ohio, is soliciting bids for the Stow Road Sidewalk Improvements project, which involves the installation of 5,045 linear feet of five-foot-wide concrete sidewalk extending from Ravenna Street northward toward E. Streetsboro (SR 303). The scope of work includes clearing, grubbing, drainage improvements, the installation of Type 3 catch basins and 24-inch HDPP conduit, and the implementation of erosion control measures and a StormWaterPollutionPreventionPlan. All work must adhere to City of Hudson standards and specific ODOT specifications, including ODOT 301 for asphalt concrete and ODOT 614 for maintenance of traffic. Additionally, curb ramps must be installed in compliance with ADA standards and ODOT SCD BP 7.1. Bids are submitted on a unit price basis via the Bid Express website and must be accompanied by bid security, such as a Bid Guaranty and Contract Bond or a certified check for 10% of the bid. Evaluation is based on bidder qualifications, responsibility, and compliance with prescribed requirements. The successful contractor will be required to provide a performance bond and certificates of insurance before commencing work. Payments are processed via applications for payment submitted to the project engineer, with payment due within 60 days of presentation to the owner. The project requires a registered Professional Surveyor in the State of Ohio for construction layout and verification.
City of Hudson

POSTED

1 day ago

DEADLINE

in 23 days
View Details
NAICS: 237310
New
SLED
Multi-Purpose Path along Barlow Road (Phase 2)
Solicitation # 50012
The City of Hudson, Ohio, is soliciting bids for the Multi-Purpose Path along Barlow Road (Phase 2) project. The scope of work involves the installation of approximately 200 lineal feet of seven-foot wide Class C concrete trail, along with grading, pavement striping, storm and road improvements, and potential railroad improvements. Key deliverables include the installation of traffic signs and supports, and the contractor is required to maintain two-way traffic on Barlow Road during construction. The project must be completed, including all punch list items, by April 30, 2027, with liquidated damages of $1,000 per day for delays beyond this date. The contract will be awarded to the lowest and best bidder based on compliance, responsiveness, and the bidder's financial and professional qualifications. Eligible bidders must demonstrate at least three years of experience in similar work and the successful completion of at least three comparable projects. This is a unit price contract requiring bid security of 10% of the bid amount, as well as performance and payment bonds and three specific insurance policies. All work must adhere to the City of Hudson Engineering Standards, ODOT Construction and Material Specifications, and OSHA confined space requirements. Furthermore, the contractor must comply with Ohio Revised Code Chapter 4115 regarding prevailing wage rates. Bids must be submitted electronically via Bid Express.
City of Hudson

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS