Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Commerce was posted on August 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Atomic Layer Deposition (ALD) Batch Reactor

Closed
1333ND26QNB030533Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This amendment for the Atomic Layer Deposition (ALD) Batch Reactor solicitation clarifies technical and logistical requirements for the vendor. NIST will provide the vacuum pump, precursors for testing, and facility utilities, and will handle the final connections to the tool. The contractor is responsible for the ozone destruct and vented precursor cabinet, ensuring they interface with standard flexible duct hoses. The system must support four precursor sources and ozone simultaneously and be capable of processing at least one 200 mm wafer or smaller substrates. Delivery is established as FOB destination at NIST shipping and receiving, and NIST will perform all acceptance tests and metrology using government personnel and equipment. A minimum warranty of one year after acceptance is required. The deadline for quote submission remains September 1, 2026, at 9:00 AM EST.

General Info

NIST seeks bids for an ALD Batch Reactor by September 1, 2026.

Contract Value

$248,988

NAICS

333242 - Semiconductor Machinery Manufacturing

Place of Performance

Gaithersburg, MD, 20878, USA

Set-Aside

NONE

Award Issued Date

Documents

1

SF 1449 Solicitation/Contract Form

PDF, High priority: read this first25 pages · contract-document
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Nist
Contacts1 person available
OfficeGAITHERSBURG, MD, 20899, USA
Organization / AgencyDepartment Of Commerce Nist
Office AddressGAITHERSBURG, MD, 20899, USA

Full Description

Show more

AMENDMENT 1: The purpose of this amendment is to provide a list of timely submitted vendor questions along with the Government's responses. Please see below:


1. Question: Please identify the facility interfaces available for the existing dry vacuum pump, pump exhaust, ozone destruct system and vented precursor cabinet, including applicable connection types and their approximate distance from the intended tool location. Please also identify whether chilled water or any utility not listed in the Statement of Requirements will be available or required. 


Response: To clarify, as the requirements indicate, only a vacuum pump is provided by NIST. The inlet is NW40 and the pump outlet is either NW25 or NW40 depending upon the pump used. If the tool pump port is smaller than NW40, NIST can use a reducer to use one of its existing pumps. Ozone destruct and vented precursor cabinet are the contractor's responsibility and can have any external duct connection that is suitable for interfacing with common flexible duct hoses. We typically use hoses with inner diameters of 2.5" or 3.0" to connect to house exhaust. The distances between utilities and the tool location are on the order of 36". NIST will run gas and exhaust lines from the tool to the utility connection points. Per the requirements, utility requirements should be limited to power, compressed air, and carrier gas. Chilled water is not readily available.



2. Question: Please clarify the required delivery handoff point. Does FOB Destination delivery end at NIST Shipping and Receiving, or must the contractor also provide uncrating, rigging, cleanroom wipe-down, and final placement?


Response: FOB destination at NIST shipping and receiving is sufficient.



3. Question: Please confirm whether NIST or the contractor is responsible for furnishing the ALD and SAM precursors required for commissioning and acceptance testing. If the contractor is responsible, please identify the required chemicals, quantities and purity grades.


Response: NIST will furnish the precursors required for commissioning and acceptance testing.



4. Question: Please confirm whether NIST will perform the listed acceptance tests and associated metrology using Government personnel and equipment, or whether the contractor must provide OEM personnel, process qualification, metrology and a separate qualification data package. If contractor or OEM support is required, please identify the expected on-site scope, required deliverables and acceptance criteria.


Response: NIST will perform acceptance tests and metrology using government personnel and equipment.



5. Question: The solicitation requires a warranty but does not specify its duration or service requirements. Please confirm the minimum warranty period, warranty start date and whether on-site warranty service or a specific response time is required.


Response: Warranty period is specified in the requirements document as a minimum of one year after acceptance.



6. Question: The system is identified as an ALD batch reactor, but the solicitation does not specify a minimum batch capacity. Would a system capable of processing a single 200 mm wafer, as well as smaller substrate pieces, satisfy this requirement, or must the system accommodate multiple wafers simultaneously? If multiple-wafer processing is required or preferred, please identify the minimum desired batch capacity.


Response: Yes, a system capable of processing a single 200 mm wafer and smaller pieces would satisfy requirements.



7. Question: The technical specifications require five single-port precursor sources, including one source valve dedicated to ozone, as well as four independently heated 50 mL precursor cylinders. Please confirm whether the system must support all four precursor cylinders and the dedicated ozone source simultaneously without reconfiguring or exchanging source connections.


Response: The system must support all four precursor sources and ozone simultaneously.



8. Question: The solicitation states that the system must be end-user installable, with assembly limited to connecting the compressed-air supply, nitrogen supply, electrical power and reactant sources. Please confirm that NIST will provide the required facility utilities at or immediately adjacent to the intended tool location and that the contractor is not responsible for extending, rerouting or orbitally welding facility gas lines. 


Response: NIST will provide facility utilities close to the intended tool location and NIST will make the connections to the tool. Contractor is not responsible for welding or making the external connections.



** Due date for quote submission has not changed. All quotes must be received no later than 9:00AM EST on 9/1/2026.**


END OF AMENDMENT 1. 


________________________________________________________


Please see attached Form SF1449.

More opportunities from Department Of Commerce Nist

Same awarding agency

NAICS: 236210
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Industrial Building Construction

POSTED

7 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS