ATPL-5106(010) 40th Street Transit and Multi-Modal Enhancements Project

Forecast
ATPL-5106(010)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Emeryville

Place of Performance

Shellmound Street and 40th Street between Christie Avenue and Adeline Street, Emeryville, CA, 94608

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Emeryville
Contacts2 people available
OfficeN/A

Interested Companies (1)

NCEAnaheim, California

Full Description

Show more
Project Description: The project would enhance existing infrastructure on 40th Street (Adeline Street to IKEA Entrance) and Shellmound Street (IKEA Entrance to Christie Avenue) through the construction of 1.4 miles of two-way separated Class IV bikeway, transit-only lanes, transit islands, pedestrian enhancements, a transit hub with complete street intersection improvements, and closing the unsignalized intersections of Hubbard Street and Haven Street on the north side of 40th Street, partial southbound closures at the unsignalized intersections of Holden Street and Watts Street on the north side of 40th Street per the Emeryville City Council Resolution 23-105, 23-106, 23-107, and 23-108 (July 18, 2023). Project features would consist of realigning the existing lanes, removing and replacing medians, rehabilitating the pavement surface, restriping, installing green stormwater infrastructure improvements, upgrading street lighting, and reconstructing pedestrian infrastructure to accommodate a two-way separated Class IV bikeway, new sidewalk, and concrete bus pads. 40th Street (Adeline Street to IKEA Entrance) improvements would include: • Lane realignment to accommodate two-way separated Class IV bikeway on the north edge of the roadway. • Thin grind and asphalt concrete overlay. • Asphalt concrete conforms adjacent to new concrete work. • Full depth pavement reconstruction in areas of new islands for bikeway separation. • Removal of existing roadway improvements as needed. • Construction of sidewalk on Hubbard Street. • Multi-use pathway connection between Hubbard Street and Halleck Street up to 4.5 feet in height. • Addition of concrete bus pads at bus stops. Shellmound Street (IKEA Entrance to Christie Avenue) improvements would include: • Lane realignment to accommodate two-way separated Class IV bikeway on the west edge of the roadway. • Thin grind and asphalt concrete overlay. • Asphalt concrete conforms adjacent to new concrete work. • Roadway improvements, including excavation to a maximum depth of one foot below existing grade. • Addition of one concrete bus pad at one bus stop.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
STADIUM GATEWAY PARKING LOT SLURRY SEAL SERVICES
Solicitation # 26-27-12
The City of Anaheim is soliciting bids for slurry seal services at the Stadium Gateway Parking Lot, located at 1900 S. State College Blvd. The project involves cleaning and preparing approximately 158,000 square feet of asphalt, applying one coat of Type 1 slurry seal, and restriping the lot to its existing layout with two coats of paint and updated stenciling. All work must be completed within 45 calendar days of commencement, with the specific requirement that the application be finished in two moves over a single weekend. The contract will be awarded to the lowest responsive and responsible bidder, with evaluation factors including price, past performance, and the ability to meet all technical specifications. Qualified bidders must hold a valid California C-32 Parking and Highway Improvement Contractor's License and be registered as a Public Works Contractor with the Department of Industrial Relations to ensure the payment of prevailing wages. Required submittals include a bid bond, proof of insurance, and a completed vendor questionnaire. Upon award, the contractor must provide performance and labor and materials bonds equal to 100 percent of the annual contract value within 10 calendar days. The contract includes a one-year warranty against defects in workmanship and materials, and requires the submission of Safety Data Sheets for all hazardous substances used. Bids must be submitted electronically by December 18, 2026, and remain valid for 180 days following the closing date.
Convention/Sports/Entertainment

POSTED

about 8 hours ago

DEADLINE

in 30 days
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS