Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Energy was posted on March 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ATR Ion Exchange Column Fabrication

Closed
INL-26-037Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Idaho Falls, ID, 83415, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstexpression-of-interest
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Battelle Energy Alliance–doe Cntr
Contacts1 person available
OfficeIdaho Falls, ID, 83415, USA

Full Description

Show more

INTRODUCTION


Battelle Energy Alliance, LLC (BEA) Management & Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is seeking an Expression of Interest (EOI) from qualified vendors capable of fabricating a complete Ion Exchange Column Assembly to support operations at the Advanced Test Reactor (ATR). The fabricated system will play a critical role in radiochemical process performance, shielding effectiveness, and facility reliability.


BACKGROUND


INL is a U.S. Department of Energy (DOE) national laboratory dedicated to nuclear energy, national security, and clean energy innovation. The ATR facility relies on highly specialized purification and shielding systems, which include the Ion Exchange Column Assembly. BEA is requesting vendor capabilities statements for the fabrication of a multi-component assembly that must meet strict nuclear, metallurgical, and structural performance standards. Project-specific INL engineering reports, detailed drawings, structural analyses, and procedural references will be furnished.


The scope of work includes the following:


  • Fabrication of one complete Ion Exchange Column Assembly, including:
    • Two stainless steel ion exchange columns
    • Shield box
    • Access port covers
    • Lead shot shielding material
    • All mounting hardware and handling hardware following detailed drawings and engineering reports
  • Development of procedures for lead-shot and rigging handling of the completed assembly

The scope of work does not include the following:


  • Installation at the facility
  • Interfacing equipment beyond supplied mounting hardware
  • Overpressure protection of the final assembly

APPLICABLE CODES AND REFERENCES


The fabrication and associated documentation must comply with the following (as applicable to component type):


  • ASME Section VIII Division 1(2023)
  • ACI 349-13 (Reinforced Concrete Safety-Related Structures)
  • ANSI/AISC N690-18 (Nuclear Facility Steel Structures)
  • ASCE 4-16 and ASCE 43-19 (Seismic Design)
  • ANS-2.26 (Seismic Categorization)

DESIGN REQUIREMENTS


Vendors should have demonstrated experience with nuclear-grade fabrication and must meet or exceed the following design conditions:


  • Materials & Components:
    • Stainless steel process vessels
    • Lead-shot-filled shielding support frame
    • Structural framing and supports per AISC nuclear standards
  • Pressure & Temperature Ratings:
    • Design Pressure: 2500 psig
    • Temperature Range: -20°F to 650°F
  • Radiation Shielding:
    • Assembly must reduce radiation fields to below 100 mRem/hr at 30 cm
  • Seismic Requirements:
    • Seismic Design Category: SDC-4
    • Design consistent with ASCE 4-16, ASCE 43-19, ANS-2.26
  • Inspections & Engineering Approval:
    • All pressure boundary welds inspected per ASME VIII/NDE requirements
    • Fabrication drawings and calculations must be submitted for formal BEA review/approval

PROCESS


This EOI is the first step in identifying interested and qualified vendors. Responses may be used to inform the development of a formal solicitation list. Selected vendors may be invited to participate in a Request for Proposal (RFP) process for award consideration.


SUBMITTAL REQUIREMENTS


Interested vendors should submit an Expression of Interest that includes the following:


  • Company name and point of contact
  • Relevant fabrication experience, particularly nuclear or DOE-grade work
  • Applicable NAICS codes and business size classification
  • Any existing DOE or federal contracting experience (if applicable)
  • Demonstrated capability to meet ASME, AISC, seismic, and shielding requirements
  • Acknowledgment of the ability to meet the following vendor data submittals:
    • Fabrication drawings and bill of materials
    • Design calculations (structural, seismic, pressure)
    • Material test reports (MTRs)
    • Weld maps and WPS/PQR documentation
    • NDE reports and inspection records
    • Hydrostatic test procedures and final test reports
    • Packaging, handling, and lead-shot management procedures
    • Software verification documentation (if engineering software is used)
    • Completed Vendor Data Schedule and transmittal forms

QUALITY ASSURANCE REQUIREMENTS


The subcontractor’s quality program must be equivalent to ASME NQA-1. Requirements include:


  • Qualification records for welders, inspectors, technicians
  • Third-party inspection where required
  • Pressure vessel registration (if applicable)
  • Certificates of Conformance (CoC)
  • Submittal of all quality-related inspection and test documents

FABRICATION & TESTING


  • Materials must meet applicable ASME and ASTM specifications
  • Fabrication must follow ASME Section VIII and ANSI/AISC N690-18 for structural parts
  • All surfaces cleaned and finished uniformly; stainless surfaces must meet chloride and contamination requirements
  • Identification tags and ASME nameplates applied as required
  • Hydrostatic testing must meet ASME VIII requirements, using low-chloride test fluid
  • BEA inspectors may witness fabrication and testing activities
  • A “U” stamp certification of the vessels

DELIVERY & PROTECTION


Final assembly must be delivered to a specified Idaho Falls logistics facility with:


  • Cleanliness requirements met; no fluids or contaminants left inside components
  • Protective packaging to prevent component damage
  • Clear labeling and lift/rigging points identified
  • Unit prepared for forklift or crane handling
  • INL personnel retain rights for inspections, audits, and hold-point reviews throughout fabrication. Final acceptance occurs after successful hydrostatic testing, inspection, and delivery to an Idaho Falls logistics facility


Deadline for submission: April 22, 2026
Submit to: Sign up to see this detail


Only select respondents, as determined by BEA, will receive an invitation to participate in the anticipated RFP solicitation.


PROPRIETARY INFORMATION


Because information received in response to this EOI may be business sensitive or proprietary to the responding party, respondents must mark information in their responses accordingly.

More opportunities from Department Of Energy → Battelle Energy Alliance–doe Cntr

Same awarding agency

NAICS: 335910
New
Federal
Long-Duration Energy Storage (LDES) Battery System
Solicitation # INL-26-050
Idaho National Laboratory (INL) and Argonne National Laboratory (ANL) are seeking Expressions of Interest (EOI) for non-lithium, rechargeable electrochemical long-duration energy storage (LDES) battery systems to undergo benchmark performance testing. The requirement includes two module-scale systems (100-150 kWh, 10-15 kW) to be delivered to INL and one full-scale system (1000-1500 kWh, 100-150 kW) to be delivered to ANL. All systems must support at least 10 hours of continuous discharge, operate between 0 to 50 degrees Celsius, and possess a minimum field lifetime of 15 years. Technical specifications require a 3-phase 480 VAC interface, an isolated 800-1500 VDC export, and support for SCADA protocols such as Modbus TCP/IP, DNP3, and IEC 61850. Systems must comply with NFPA 855, UL 9540/9540A, and NEC/IEEE standards, and vendors must provide comprehensive hazard assessments and emergency response instructions. The delivery timeline specifies that modules should arrive at INL approximately three months after final design acceptance, while the full-scale system is due at ANL within six months. This EOI process is a preliminary step to identify qualified vendors for a future Request for Proposal (RFP). Interested parties must submit a consolidated PDF or Word document including technical descriptions, physical characteristics, safety documentation, indicative pricing, and a project schedule to Chase Egbert by December 8, 2026.
Battery Manufacturing

POSTED

about 4 hours ago

DEADLINE

in 22 days
View Details
NAICS: 334519
Federal
ATR Plant Protection System (PPS) Seismic Switch Replacement
Solicitation # INL-27-002
Battelle Energy Alliance, LLC, acting as the management and operating contractor for the Department of Energy owned Idaho National Laboratory, has issued an Expression of Interest under solicitation number INL-27-002. The objective is to conduct market research and acquisition planning to identify qualified suppliers capable of replacing obsolete Kinemetrics Model TS-3A seismic switches within the Advanced Test Reactor Plant Protection System. The required solution must provide three-axis ground motion sensing, dry contact output, and adjustable trip setpoints to ensure critical reactor protection functions and long-term system reliability. Potential suppliers must demonstrate the ability to meet stringent nuclear safety standards, including environmental and seismic qualifications per IEEE 323, IEEE 344, IEEE 603, and ANSI/ISA-67.04.01, while maintaining a Quality Assurance Program consistent with ASME NQA-1. Mandatory capabilities include the provision of comprehensive qualification reports, certificates of conformance, and long-term obsolescence management. Interested organizations must submit a concise PDF response, limited to approximately 10 pages, detailing their technical capabilities, business size, and relevant experience to Chase Egbert and Stacey Hill by April 23, 2027.
Other Measuring and Controlling Device Manufacturing

POSTED

7 days ago

DEADLINE

in 5 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS