Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Colorado was posted on October 3, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Aurora Trail - Phase 1

Closed
37315State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 6 hours ago

DEADLINE

in 27 days
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Aurora Trail Phase 1 project involves constructing a ten-foot-wide asphalt trail along an existing abandoned railroad corridor in Aurora, Ohio, stretching from State Route 82 to Chamberlain Road. The project also includes installing a Rectangular Rapid Flashing Beacon and crosswalk improvements at State Route 82, along with minor drainage upgrades to enhance safety and infrastructure. The total estimated cost for the project is approximately $1.59 million, with an alternative estimate of $20,000, and is scheduled for completion by July 31, 2025. A mandatory site visit is scheduled for October 21, 2024, at 9 AM at 330 E. Garfield Road, Aurora, Ohio, to facilitate contractor understanding of project requirements. The contract solicitation, titled "Aurora Trail - Phase 1," was posted on October 3, 2024, with a response deadline of October 29, 2024. It is managed by the City of Aurora, Ohio, under the NAICS code 237990, which pertains to construction of highway, street, and bridge construction. The project is part of a larger effort to improve local transportation infrastructure, and interested parties can access additional details through the provided online link. The contract is set for a significant project size, indicating a substantial scope of work aimed at enhancing pedestrian safety and connectivity in the Aurora area.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → City of Aurora
ContactsNo contacts available
OfficeN/A
Organization / AgencyColorado → City of Aurora
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This Aurora Trail Phase 1 project consists of the construction of a ten-foot-wide asphalt trail along the existing abandoned railroad corridor in Aurora, Ohio between State Route 82 and Chamberlain Road. Additional work includes the installation of a Rectangular Rapid Flashing Beacon and crosswalk improvements at State Route 82, and minor drainage upgrades. Engineer's Estimate: $1,591,919.96 Estimate Alternative #1: $20,000.00 Completion Date: July 31, 2025 Mandatory Site Visit: October 21, 2024 at 9AM - 330 E. Garfield Road, Aurora OH 44202

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS