Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on November 18, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Automatic Gate Repair - Headlands Beach State Park

Closed
SRC0000026062State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238290
New
Centennial JCC Panic Hardware Services (Electrical Room Egress Doors)
Solicitation # Panic Hardware (Electrical Room Egress Doors)
Management & Training Corporation is soliciting bids for the installation of commercial-grade panic hardware on electrical room egress doors at the Centennial Job Corps Center in Nampa, Idaho. The project encompasses five specific locations: the Cafeteria, Men's Dorm, Women's Dorm, Recreation, and Vocational buildings. The scope of work requires the contractor to conduct site surveys, procure Grade I commercial-grade panic bars with matching exterior trim and door closers, and perform installations that ensure doors open outward under simple pressure. All work must comply with NEC 2023 Article 110.26(C)(3), NFPA 101 Life Safety Code, and the Americans with Disabilities Act. Final acceptance is contingent upon the successful completion of at least 10 consecutive cycle tests to verify fail-safe operation. This is a fee-for-service subcontracting opportunity set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications, under NAICS code 238290. Bidders must submit a lump sum bid sheet, a completed supplier packet including a W-9 and self-certification form, and three references for similar projects by December 1, 2026. The contract is subject to various Federal Acquisition Regulations, including Davis-Bacon Act prevailing wage rates for Idaho, minimum wage requirements under Executive Order 14026, and paid sick leave under Executive Order 13706. Awarded contractors must provide proof of insurance and adhere to strict government guidelines regarding information security and the protection of sensitive data.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in about 1 month
NAICS: 238290
New
SLED
Pauma Security Gate
Solicitation # 2026-27-06
Solicitation 2026-27-06 for the Valley Center Pauma Unified School District involves the fabrication and installation of automated, keypad-entry hinging steel security swing gates at entry and egress driveways in Valley Center, California. The project requires two powder-coated steel double swing gates, each 18 feet wide by 5 feet tall, and explicitly prohibits the use of chain link options. Key technical components include a mounted Knox switch with Fire Department filing, two entry remotes, gate hold timers, a mounted strobe detector for emergency vehicles, and a keypad similar to the Door King 1506-086. The contract value is capped at 1,000,000 dollars, and the award will be granted to the lowest responsive and responsible bidder. Eligible bidders must hold a California contractor's license C13 or C-61/D28 and comply with prevailing wage requirements and Department of Industrial Relations registration. The project mandates a payment bond for 100 percent of the total bid price and a DVBE participation goal of at least 3 percent. Required submissions include a comprehensive bid packet featuring non-collusion affidavits, Iran Contracting Act certification, and fingerprinting certifications. Performance must be coordinated with the Director of Maintenance and Operations, with work hours restricted to 7:00 am to 5:00 pm, Monday through Friday. Additionally, contractors must adhere to strict hazardous material standards and California Air Resources Board compliance, with the district maintaining the right to terminate the agreement upon 30 calendar days written notice.
Valley Center Pauma USD

POSTED

about 9 hours ago

DEADLINE

in 5 days
NAICS: 238290
New
SLED
Districtwide Elevator And Wheelchair Lift Service, Preventive Maintenance, And Repairs Maintenance Services
Solicitation # 27.004
The Hayward Unified School District is soliciting bids under solicitation number 27.004 for districtwide elevator and wheelchair lift service, preventive maintenance, and repairs. The selected contractor will be responsible for the systematic examination, maintenance, and repair of all owned or leased systems, including hydraulic, electrical, and mechanical components, to ensure they remain in safe and usable condition. This contract requires the provider to hold an active C-11 Elevator Contractor license from the State of California and comply with all local and state codes, including Title 24 of the California Code of Regulations. The award will be granted to the lowest responsive and responsible bidder based on the rates provided in the bid form. Performance of regular services typically occurs Monday through Friday during standard business hours, while emergency repairs must be available 24 hours a day, seven days a week. The contractor must provide a bid bond of at least 10 percent of the bid amount and subsequently provide payment and performance bonds upon award. Invoicing is conducted monthly, with a requirement that authorized materials be invoiced at no more than 15 percent above the vendor's cost. Key compliance requirements include paying prevailing wages per the California Labor Code, submitting to fingerprinting and felony conviction certifications, and maintaining a minimum one-year warranty on work. All contracts are governed by the laws of the State of California.
Hayward Unified School District

POSTED

about 10 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The contract involves the repair and replacement of the automated entrance gate at Headlands Beach State Park in Ohio, with a project value estimated between $50,000 and $150,000. The scope of work mandates that the new gate and control equipment closely match the appearance, material, and functionality of the existing gate and exit gate, with allowances for updated or obsolete components. Key requirements include matching the color, sheen, hinges, and swing arc of the original gate, as well as installing 6-inch hollow metal posts filled with concrete to support the gate panels. The controlling unit must be of the same brand and functionality as the current system, with an emphasis on maintaining remote operation compatibility. The contractor is responsible for coordinating with the local power company, ensuring proper repair of asphalt surfaces disturbed during installation, and maintaining smooth traffic flow into the park without delays or detours unless properly communicated. All work must be completed within designated hours, from half an hour before sunrise to half an hour after sunset, and the site must be restored to its original condition after work completion. Waste removal, safety, and adherence to all relevant regulations are also integral parts of the project. The contractual framework is reinforced by comprehensive standard terms and conditions, including legal and regulatory requirements such as compliance with laws related to antitrust, campaign contributions, and conflict of interest, as well as provisions for warranties, debarment, and drug-free workplace policies. Contractors must also complete affirmations regarding offshore services and data location restrictions, particularly prohibitions on engaging with Russian entities and performing services outside the United States without prior approval. These documents ensure that contractors understand and agree to the state's policies on data security, ethical conduct, and operational transparency, establishing a clear legal and procedural foundation for the successful execution of the project.

Documents

5

Addendum to Bid Quote Base Template Non-Federal Funds Rev. 2024-09-13

DOCX, High priority: read this firstamendment
High

Headlands Beach State Park Automatic Gate Repair RFQ

DOCX, High priority: read this firstrfq
High

Standard Terms and Conditions 04-10-23

PDF, High priority: read this first15 pages · standard-terms-and-conditions
High

Affirmation and Disclosure Form Rev. 3/22

PDF, Low priority2 pages · affirmation-and-disclosure-form
Low

OhioBuys Fact Sheet for Bidders and Suppliers

PDF, Low priority2 pages · fact-sheet
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → DNR353406 Headlands Beach State Park DNRLAK
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
HEADLANDS BEACH STATE PARK AUTOMATED ENTRANCE GATE REPAIR/REPLACEMENT SCOPE OF WORK   The repaired/replaced automated gate and control equipment must match the previous gate, and that of the current exit gate. In light of materials and equipment becoming unavailable, or obsolete, the next version is acceptable. As such, the following must be considered. · The material(s), look, and functionality of the gate panels must match the former gate, and the current exit gate. o This includes the color and sheen of the finish · The hinges should be as similar to the former hinges as possible. o This includes color, finish, size, and number…as well as, the length of the swing arc. · The swing arm posts should be of 6” x 6” hollow metal columns that should accept the hinges and the weight of the gate panels. o Filling this post with concrete is preferred. · The controlling unit should match the previous unit in brand, functionality, and remote operation. o It is highly preferred that the same remote devices that currently operate the Exit Gate be able to seamlessly operate this new gate. o All electrical power, and sub-surface road sensors should be in place and fully functional. § It will be the responsibility of the bidder to determine this, and if any aspect is found to be dysfunctional, cost to re-establish such should be included in the bid. · All work and coordination with the local power company is the responsibility of the bidder. · Any cutting, boring, or general removal of the entrance asphalt must professionally repaired/replaced and sealed. · Installation must not negatively affect the flow of traffic into the Park. o Any need to delay or detour traffic must be communicated and coordinated in a timely manner with the Park Manager. · All installation disturbance to the work area must be returned to its original state by the bidder. · All construction/installation waste must be removed from the Park at the cost of the bidder. · Installation/construction can only take place between ½ hour before sunrise and ½ hour after sunset. Beyond these hours, the Park is closed.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS