Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Auxiliary Spillway Construction – Reinforced Concrete & Precast Culverts

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Kentucky → Dept- Environmental ProtectionView Agency

NAICS

238110 - Poured Concrete Foundation and Structure ContractorsView NAICS

Place of Performance

Other, KY, USA

Set-Aside

NONE

Documents

This scope was carved out of RFB-785-2600000643-6.

The full solicitation package (11 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFB-785-2600000643-6 | RFB-275-26 Willisburg Lake Dam Rehabilitation Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyKentucky → Dept- Environmental Protection
ContactsNo contacts available
OfficeN/A
Organization / Agency
Kentucky → Dept- Environmental Protection
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construct a reinforced concrete auxiliary spillway with stepped chute, stilling basin, and installation of two 8 ft × 16 ft precast concrete culverts.

Similar Contracts

Same NAICS industry code

More opportunities from Kentucky → Dept- Environmental Protection

Same awarding agency

NAICS: 237990
New
SLED
RFB-785-2600000643-6 | RFB-275-26 Willisburg Lake Dam Rehabilitation Project
Solicitation # RFB-785-2600000643-6
The RFB-275-26 Willisburg Lake Dam Rehabilitation Project is a competitive solicitation issued by the Kentucky Department of Environmental Protection, Division of Water. The project involves comprehensive civil construction and environmental remediation at the Willisburg Lake Dam in Washington County, Kentucky. Key technical requirements include the construction of a reinforced concrete auxiliary spillway with precast culverts, a stepped chute, and a stilling basin, as well as the installation of a reinforced concrete floodwall and a downstream rockfill stability berm. Additionally, the contractor must replace the low-level drawdown valve, remediate concrete cracking and seepage in the principal spillway culvert, and replace the City of Springfield’s raw water intake lines. Bids must be submitted electronically via the Kentucky eProcurement system by August 31, 2026, at 1:30 PM Eastern Time. All submissions, including the Official Bid Document and any required Bid Bonds, must be consolidated into a single PDF file. The project is managed by Susan Ward of the Division of Engineering and Contract Administration, with technical oversight provided by Robert Hatton of Stantec Consulting Services. Special restrictions include a strict prohibition on pile driving within the dam embankment and a requirement for a contractor-designed Water Diversion Plan. All work must adhere to Commonwealth of Kentucky construction guidelines and specific technical standards, such as ASTM E154 for waterproofing materials.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 221320
SLED
Intake System Abandonment and ReplacementThe contract entails the abandonment of Springfield’s existing water intake system and the installation of new intake lines within an existing culvert structure, aiming to modernize and improve the reliability of the city’s water supply infrastructure. This project is classified under NAICS code 221320, indicating it falls under water transportation and utility system construction, and is structured as a subcontract requiring qualified contractors to handle the decommissioning of outdated components and the precise placement of new intake infrastructure within constrained spatial conditions. The work must be completed in accordance with environmental and engineering standards to ensure minimal disruption to water quality and surrounding ecosystems during the transition period. The solicitation was posted on July 22, 2026, with a response deadline of August 31, 2026, providing potential subcontractors approximately six weeks to prepare and submit proposals. The project is administered by the Kentucky Department of Environmental Protection, though specific office location and point of contact details are not provided. Performance of the work is designated for “Other” city, indicating the exact location may be internally defined or subject to further clarification by the agency. No set-aside status is indicated, meaning the contract is open to all eligible entities, and interested contractors are directed to the Kentucky Virtual State System portal for additional submission instructions and documentation.
Sewage Treatment Facilities

POSTED

29 days ago

DEADLINE

in 12 days
View Details