Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Kentucky was posted on July 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Intake System Abandonment and Replacement

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract entails the abandonment of Springfield’s existing water intake system and the installation of new intake lines within an existing culvert structure, aiming to modernize and improve the reliability of the city’s water supply infrastructure. This project is classified under NAICS code 221320, indicating it falls under water transportation and utility system construction, and is structured as a subcontract requiring qualified contractors to handle the decommissioning of outdated components and the precise placement of new intake infrastructure within constrained spatial conditions. The work must be completed in accordance with environmental and engineering standards to ensure minimal disruption to water quality and surrounding ecosystems during the transition period. The solicitation was posted on July 22, 2026, with a response deadline of August 31, 2026, providing potential subcontractors approximately six weeks to prepare and submit proposals. The project is administered by the Kentucky Department of Environmental Protection, though specific office location and point of contact details are not provided. Performance of the work is designated for “Other” city, indicating the exact location may be internally defined or subject to further clarification by the agency. No set-aside status is indicated, meaning the contract is open to all eligible entities, and interested contractors are directed to the Kentucky Virtual State System portal for additional submission instructions and documentation.

General Info

Abandon old water intake, install new lines in culvert to modernize Springfield’s water supply infrastructure.

Agency

Kentucky → Dept- Environmental ProtectionView Agency

NAICS

221320 - Sewage Treatment FacilitiesView NAICS

Place of Performance

Other, KY, USA

Set-Aside

NONE

Documents

This scope was carved out of RFB 785 2600000643.

The full solicitation package (15 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFB-785-2600000643-5 | RFB-275-26 Willisburg Lake Dam Rehabilitation Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKentucky → Dept- Environmental Protection
ContactsNo contacts available
OfficeN/A
Organization / Agency
Kentucky → Dept- Environmental Protection
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Abandonment of Springfield’s existing water intake and installation of new intake lines within the culvert.

More opportunities from Kentucky → Dept- Environmental Protection

Same awarding agency

NAICS: 237990
SLED
RFB-785-2600000643-8 | RFB-275-26 Willisburg Lake Dam Rehabilitation Project
Solicitation # RFB-785-2600000643
The Commonwealth of Kentucky Department of Environmental Protection is soliciting bids for the Willisburg Lake Dam Rehabilitation Project in Washington County, identified as RFB-275-26 or RFB-785-2600000643-8. The comprehensive scope of work includes the construction of a reinforced concrete auxiliary spillway and floodwall, the installation of rockfill stability berms, and the replacement of low-level drawdown valves. Additional requirements involve the remediation of concrete cracking and seepage, the abandonment and replacement of raw water intake lines, spillway culvert remediation, and various demolition, site preparation, and restoration activities. Contractors are also responsible for erosion control, traffic control, and the development of a contractor-designed water diversion plan. The solicitation process has undergone multiple modifications and addenda, with the final bid response deadline set for September 17, 2026, at 17:30. Bids must be submitted exclusively online, with the official bid document and bid bond combined into a single PDF file. Key technical constraints include a prohibition on driving piles into the dam embankment and the rejection of specific waterproofing material substitutions that do not meet puncture requirements. Notably, the project is exempt from domestic material requirements such as Buy America or American Iron and Steel. Primary contact for the project is Susan Ward, and the contract is managed through the Kentucky Department for Facilities and Support Services.
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS