B-3452 Backflow Preventer

Forecast
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This project involves correcting a high hazard cross-connection at Building 3452 (NEX) where the 8 inch main water line lacks required backflow prevention. The current configuration allows for the potential contamination of the potable water supply by the fire sprinkler system through back pressure or back siphonage. To achieve compliance, the contractor must reconfigure the main water supply line to install one 8 inch RPZ backflow preventer on the fire main supply connection and one 4 inch RPZ backflow preventer on the potable main water supply. Additional recommended work includes upgrading the 37 year old clapper style sprinkler flow alarm valves to a modern manifold and check valve configuration to reduce maintenance costs and part scarcity. The project also calls for upgrading two fire main shut-off valves that currently extend through the mechanical room wall without proper locking mechanisms. This effort is forecasted as an 8(a) set-aside under NAICS code 237110 for Navfac Mid-Atlantic at Great Lakes.

General Info

Install RPZ backflow preventers and upgrade sprinkler valves at Building 3452 for compliance.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

ML: GREAT LAKES, USA

Set-Aside

8A

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Mid-Atlantic
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
There is currently no existing required backflow prevention on the incoming 8” main water line in the mechanical room at Bldg. 3452 (NEX). (picture available) This deficiency was identified by the last BFP survey done in the early 90's with the deficiency location number (# 511) still seen on the 6" Victaulic tee. Also likely is a Siamese connection for pumper truck operation somewhere in the system. Presently this line provides potable and fire sprinkler water to the facility. There is no backflow prevention of any kind on the sprinkler main, not even any check valves below the alarm valves. Failure of the outdated alarm valves to provide 100 % system separation has the potential (high) to allow the sprinkler system water to contaminate the potable water system supply by either back pressure or back siphonage. This is and should be considered a high hazard cross-connection and requires immediate correction. Project should include reconfiguring the main water supply line to add for compliance: 1-8” RPZ Backflow Preventer on the fire main supply connection 1-4” RPZ Backflow Preventer on the potable main water supply Further recommendations: Possible upgrade of the sprinkler flow alarm system from existing “clapper” style alarm valves to the more common “manifold/check valve” configuration now installed for most new construction. These valves are 37 yrs. old, hard to acquire replacement repair parts for and costly to maintain requiring an expensive yearly PM. Upgrading the two system main shut-off valves (picture also available). Presently these two fire main shut-off valves extend through the wall of the mechanical room to the outside. Bldg. 3452 is outside any secure perimeter and neither valve appears to have any kind of locking mechanism commonly seen on almost all post-indicator above ground fire main sh ... NOTE: description has been truncated, please see Project Note for full description.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of The Navy → Navfac Mid-Atlantic

Same awarding agency

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS