This Sources Sought opportunity from Department Of Defense was posted on December 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

B-52J Commercial Engine Replacement Program (CERP) Installation Kit Production and Interim Contractor Support

Closed
CERP-25-0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336411
New
DIBBS
GASKET
Solicitation # SPE7L3-27-T-0445
Solicitation SPE7L3-27-T-0445 is a fixed-price procurement issued by the DLA Weapons Support Land Supplier Ops Vehicle SPT for 462 units of Gasket (NSN 5330-01-165-1370). The contract is issued under the First Destination Transportation program with a need ship date of February 25, 2027, and a required delivery date of October 31, 2027. Delivery is to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania, with inspection and acceptance occurring at the destination. This procurement contains strict export control requirements, as the technical data is subject to ITAR or EAR regulations. To be eligible for award, contractors must possess an approved US/Canada Joint Certification Program certification and approval from the DLA controlling authority. Additionally, the items must be free of asbestos and Class I ozone-depleting chemicals. Packaging and marking must adhere to MIL-STD-2073-1E and MIL-STD-129, and any hazardous materials require a Safety Data Sheet and labeling per 29 CFR 1910.1200. Quotations must be submitted via the DLA Internet Bid Board System by October 19, 2026. The evaluation process includes a price preference for HUBZone Small Business Concerns. Awardees are required to use the Wide Area WorkFlow system for invoicing and must comply with various DFARS and FAR clauses, including those regarding the Buy American Act, Berry Amendment, and safeguarding covered defense information.
DLA WEAPONS SUPPORT LAND SUPPLIER OPNS VEHICLE SPT

POSTED

about 18 hours ago

DEADLINE

in 2 days
NAICS: 336411
New
DIBBS
PLATE
Solicitation # SPE4A5-27-T-1467
Solicitation SPE4A5-27-T-1467 is issued by the Defense Logistics Agency (DLA) for the procurement of 12 units of a specific plate, identified by NSN 1660011552101 and Honeywell International Inc. part number 3171198-1. The requirement is categorized under NAICS code 336411. Delivery is scheduled for the DLA Distribution Depot Oklahoma at Tinker AFB, with a need ship date of April 13, 2027, and an original required delivery date of February 23, 2028. The procurement is managed under the First Destination Transportation program with offers submitted as FOB Origin. The contract mandates strict quality and security compliance, including a CMMC Level 2 self-assessment and adherence to ISO 9001:2015 or equivalent standards. Inspection and acceptance will occur at the destination. Packaging must comply with ASTM D3951 and RP001, while marking and labeling must follow MIL-STD-129. Sampling will be conducted per MIL-STD-1916 or ASQ H1331, with a zero-nonconformance requirement for acceptance. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for electronic invoicing and payment requests. The solicitation also incorporates various FAR and DFARS clauses regarding the Buy American Act, cybersecurity safeguarding of covered defense information, and prohibitions on certain telecommunications equipment.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER OEM DIVISION

POSTED

about 18 hours ago

DEADLINE

in 7 days
NAICS: 336411
New
DIBBS
48--BODY,VALVE
Solicitation # SPE7M4-27-Q-0064
Solicitation SPE7M4-27-Q-0064 is a firm-fixed-price, total small business set-aside for the procurement of 39 total units of Valve Body (NSN 4820-01-375-6481) across three line items, with a delivery timeline of 320 days ADO. The items are designated as Navy Identified Critical Safety Items (CSI) and are used in the direct flow path of oxygen cleaning within an aircrew life support system. Consequently, they require specialized oxygen cleaning, for which Eaton Mission Systems' standard ST163780 is an authorized method. The contract mandates strict adherence to MIL-STD-129 for marking and MIL-STD-2073-1E for packaging, with specific requirements for oxygen clean packaging and marking per IP042 and palletization per RP001. The procurement includes high-level quality and security requirements, including SAE AS9100 standards and a CMMC Level 2 self-assessment for cybersecurity. All supplies must be free of Class I ozone-depleting chemicals. Inspection and acceptance will occur at the origin. Shipping destinations include DLA Distribution centers in Bremerton, Washington; New Cumberland, Pennsylvania; and San Diego, California. Award will be based on the best value to the government, evaluating price, offered delivery, and past performance. Invoicing and receiving reports must be processed electronically through the Wide Area WorkFlow (WAWF) system.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

about 23 hours ago

DEADLINE

in 6 days

General Info

NAICS

336411 - Aircraft Manufacturing

Place of Performance

OK, USA

Set-Aside

NONE

Documents

2

B-52J CERP Production Planning Sources Sought Synopsis #CERP-25-0001

PDF, High priority: read this firstsources-sought
High

Sources Sought Synopsis for B-52J CERP Production Phase #CERP-25-0001

DOCX, High priority: read this firstsources-sought
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

5 updates
PhaseClosed
Posted

Sources Sought

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Mar 27, 2025 to Jul 15, 2025. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 15, 2025 to Jan 15, 2026. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8107 Aflcmc Wwk
Contacts2 people available
OfficeTINKER AFB, OK, 73145-3303, USA
Office AddressTINKER AFB, OK, 73145-3303, USA
Contacts

Full Description

Show more

UPDATE 23 DEC 2025:  


The Government would like to request information from industry regarding the following questions:


  1. What is the industry standard/practice/process for managing rolling Technical Data Package updates after contract award; what is the process during a manufacturing effort?
    1. What is your ability to change parts orders with subcontractors after a PO has been signed?
    2. What administrative skill codes would be required to process TDP updates?
  2. What is the industry standard for managing the DD250 process for delivering parts from two subCLINs in one kit?
  3. Does your company require contract financing to order greater than $350M in long lead parts with government payment estimated at 2 years after order?

FORMAL REVISIONS OF YOUR COMPANY'S SSS RESPONSES ARE NOT REQUIRED AT THIS TIME, UNLESS THESE CHANGES EFFECT YOUR COMPANY'S ABILITY TO PARTICIPATE IN COMPETITION.  THE GOVERNMENT IS ONLY INTERESTED IN RESPONSES TO THE QUESTIONS ABOVE. The Government respectfully requests that responses are submitted NLT COB on 15 January 2025. Please email your company's responses to the Contracting Officer, Ashley A. Brink, at Ashley.Brink@us.af.mil and cc the Contract Specialist, Kacie Cram, at Kacie.Cram@us.af.mil.



UPDATE 29 MAY 2025:  


1. The Government has included a copy of the Draft SOW for this effort in this posting. If your company is interested in reviewing the document, please request access via email to the Contracting Officer, Ms. Ashley A. Brink at Ashley.Brink@us.af.mil and the Contract Specialist, Ms. Kaysi Simmons at Kaysi.Simmons@us.af.mil. Additionally, please provide a copy of your company's current DD 2345 Military Critical Technical Data Agreement.


The Government will allow industry to ask questions to the Contracting Officer and Contract Specialist, via email, regarding the draft SOW. Questions must be submitted by 1400 CDT on 20 Jun 2025.


2. Information captured within the SSS has been updated and/or removed. Please see the SSS attachment dated 29 May 2025.  REVISED SSS RESPONSES ARE NOT REQUIRED AT THIS TIME, UNLESS THESE CHANGES EFFECT YOUR COMPANY'S ABILITY TO PARTICIPATE IN COMPETITION. THIS UPDATE IS FOR INFORMATIONAL PURPOSES ONLY.  



UPDATE 25 MAR 2025: The following questions have been asked:


  1. Does the USAF have a compatible engine test cell to perform an engine run?
  2. Additionally, is the engine test cell equipped with the test equipment to perform functional testing of the accessories?
  3. If so, will the supplier be able to use it to perform the additional testing?

Government's Answer: The USAF is evaluating the CERP engine test cell strategy.  Vendors need to assess both engine test cell options, vendor and USAF.     


UPDATE 12 MAR 2025: The following question has been asked: Will the Kit supplier be responsible for providing the Rolls Royce engine, as part of the install kit?


Government's Answer: The kit supplier will be responsible for delivering the kit contents as listed in the SSS, completing the engine build up (production engine will be provided as GFP), accomplish post engine build-up testing to produce a “ready for install” engine and then provide the RFI engine to the customer.



B-52J Commercial Engine Replacement Program (CERP) Installation Kit Production and Interim Contractor Support


SOURCES SOUGHT SYNOPSIS (SSS) #CERP-25-0001


General Introduction:


1. The Air Force Life Cycle Management Center (AFLCMC) is conducting a market assessment to identify potential sources, and companies that may possess the expertise, capabilities, and experience to respond to the requirements listed in this document. AFLCMC is issuing this SSS to explore cost effective options and identify parties having an interest in the production phase of the B-52J (Formerly CERP). This SSS is issued solely for information and planning purposes and will inform the acquisition strategy for the production phase of the B-52J.


2. The intent of this notice is not a request for competitive proposals. Responders are advised that the U.S. Government will not pay for any information or administrative cost incurred in response to this SSS.  Please be advised that all submissions become Government property and will not be returned.  All costs associated with responding to this SSS will be solely at the responding party’s expense.


3. AFLCMC is not seeking proposals at this time and will not accept unsolicited proposals.


4. Not responding to this SSS does not preclude participation in any future RFP, if any is issued.  Small Businesses are encouraged to provide responses to this SSS in order to assist AFLCMC in determining potential levels of competition available in the industry, as well as helping to establish a basis for developing any subsequent subcontract plan goal percentages.  The acquisition strategy is still being developed.  Market research results will assist the Air Force in determining whether this requirement will be a full and open, a small business set aside, or a sole source acquisition.  If it is a small business set-aside, FAR 52.219-14, Limitations on Subcontracting will apply. Therefore, small businesses that want to be considered for a small business set-aside should demonstrate how they could comply.


5. Note that, if there is sufficient demonstrated interest and capability among small business contractors, then it may be determined that a small business set-aside is appropriate.  A key factor in determining if an acquisition will be a small business set-aside is that two or more potential small business prime contractors must be capable of performing at least 50% of the effort, as defined in Federal Acquisition Regulation (FAR) clause 52.219-14, Limitations on Subcontracting. If it is determined that a small business set-aside is appropriate, and your company anticipates submitting a proposal as the prime contractor for a small business set-aside, please provide specific details and rationale as to how compliance with FAR 52.219-14 would be achieved, including specific details regarding teaming arrangements, etc.  If subcontracts are to be used, provide anticipated percentage of effort to be subcontracted and whether small or large businesses will be used.  Teaming and/or subcontracting arrangements should be clearly delineated and previous experience in teaming must be provided.  If this effort is not set-aside for small business, small business utilization will be considered.  Large and small businesses should provide a reasonable expectation for small business utilization as a percent of total contract value as well as supporting rationale for the recommended percentage.


6. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the U.S. Government to form a binding contract.  It is the responsibility of the interested parties to monitor the SAM.Gov website for additional information pertaining to this SSS.


7. Responders are solely responsible for all expenses associated with responding to this inquiry.  This announcement is not to be construed as a formal solicitation.  It does not commit the government to reply to the information received, or to later publish a solicitation, or to award a contract based on this information.


Companies may be contacted if additional information is needed to fully understand the marketplace and/or comments to the requirements presented below.



Purpose:


The B-52J CERP production phase requirements include:


  1. Procurement and/or production of aircraft components to support installation of new engines and associated sub-systems onto the B-52 aircraft. (engines will be provided separately by the Government). Building, storing, and delivering aircraft modification kits to Tinker AFB or other designated locations, if required, on an as needed basis through the production phase for up to 76 B-52H aircraft including additional spare parts, production tooling and support equipment to support installations in a five-to-eight-year period, starting FY28.  
  2. Provide Interim Contractor Support (ICS) Providing Interim Contractor Support (ICS) for the CERP components listed below to include supplier management, non-warranty repair of aircraft components, production tooling, and support equipment.

The Government does not intend to treat these requirements as separate efforts. Responders must address all requirements within this Sources Sought Synopsis.



Prior to the B-52J production phase, The Boeing Company will:


  • Select aircraft modification component suppliers
  • Develop aircraft modification installation drawings
  • Install the modification on two B-52 test aircraft


The anticipated aircraft modification kit contents are shown below. 


Engine Struts (OEM Spirit Aero)                


Integrated Drive Generators (OEM Collins)


Hydraulic pumps (OEM Parker)                    


Engine nacelles and fairings (OEM Spirit Aero)       


Generator Control Units (OEM Collins)       


Hydraulic reservoirs          


Engine throttle controls         


Power distribution boxes (OEM Boeing)                   


Power wiring                      


Engine start switches            


Air starter auxiliary unit (OEM Honeywell)           


Control wiring                    


Engine instrument display (OEM L3 Collins)       


Air starter auxiliary unit controller


Attachment hardware          


Engine data concentrator units (OEM Boeing)


Hydraulics panel in cockpit           


Pneumatic pre-coolers         


Electrical panel in cockpit


Pneumatic components and ducting               


Anti-ice systems (OEM Liebherr)


Air Data System Probes (OEM Collins Rosemont)


True Air Temp Sensors (OEM Collins Rosemont)



REQUIREMENT 1:  ACQUIRING B-52 CERP AIRCRAFT MODIFICATION KITS


  1. Describe your capability to acquire aircraft modification components and hardware from the Boeing developed Tech Data package (not provided) for integrating new engines and sub-systems onto B-52H aircraft (engines will be provided separately by the Government). Describe your capability to build, store, and deliver aircraft modification kits to Tinker AFB on an as needed basis through the production phase for up to 76 B-52H aircraft including additional spare parts, production tooling and support equipment to support installations in a five-to-eight-year period, starting FY28.  Additionally, describe your capability to accomplish quick engine change build up and testing to deliver a “ready for install” engine as part of the aircraft modification kit deliveries.
  2. In your response, include:  your approach to plan and manage kit acquisition; any facilities you plan to use; and your planned workforce.
  3. If you don’t currently have the capability to acquire these aircraft modification kits but intend to obtain the capability, describe your plan and timeline for obtaining the capability.
  4. Describe any anticipated teaming arrangements, why the teaming arrangements are needed, and how you would implement the teaming arrangements. Delineate between the work you will accomplish and the work your team partners will accomplish.
  5. Give us relevant examples of past performance (evidence of contracts with similar scope and complexity; evidence of customer service quality and timeliness of service delivery).


REQUIREMENT 2:  PROVIDING B-52 CERP INTERIM CONTRACTOR SUPPORT


  1. Describe your capability to provide Interim Contractor Support for the CERP components listed in the table above, for a period of five to eight years, to include supplier management, non-warranty repair of aircraft components, production tooling, and support equipment, shipside engineering support for B-52J modification installation and training devices at across the B-52J enterprise.
  2. In your response, include:  Your approach to plan and manage Interim Contractor Support; any facilities you plan to use; and your planned workforce.
  3. If you don’t currently have the capability to provide Interim Contractor Support but intend to obtain the capability, describe your plan and timeline for obtaining the capability.
  4. Describe any anticipated teaming arrangements, why the teaming arrangements are needed, and how you would implement the teaming arrangements. Delineate between the work you will accomplish and the work your team partners will accomplish.
  5. Give us relevant examples of past performance (evidence of contracts with similar scope and complexity; evidence of customer service quality and timeliness of service delivery).

The proposed North American Industry Classification Systems (NAICS) Code is 336411, which has a corresponding Size Standard of 1500 employees.  The Government is interested in all businesses to include, Small Businesses, Small Disadvantaged Businesses 8(a) s, Service-Disabled Veteran-Owned Small Businesses, Hubzone Businesses, and Women-Owned Small Businesses.  The Government requests that interested parties respond to this notice if applicable and identify your small business status to the identified NAICS code.


Responses to questions from interested parties will be promptly answered and posted on the SAM.gov website, unless some release of proprietary information is involved, or the answer addresses a question specific to a company or that company’s response.  Post submittal, one-on-one information sessions with respondents are not contemplated; however, they may be offered to responders to clarify the government’s understanding of their submittal, the capability ramifications, or to discuss their business approach.  Information feedback sessions may be offered to respondents after the SSS assessments are completed.


AF Point of Contact (POC) for this SSS:


Ashley A. Brink, Contracting Officer


Ashley.Brink@us.af.mil


Kaysi Simmons, Contract Specialist


kaysi.simmons@us.af.mil


Contracting Office Address:


3001 Staff Drive


Tinker Air Force Base, OK 73145


Verbal questions will NOT be accepted.  All questions will be answered via posting answers to the SAM.gov website; except as provided above. Additionally, questions must NOT contain trade secrets or classified information. The Government reserves the right to not address questions received after 27 March 2025.



Sources Sought Responses:


  1. Please provide your Sources Sought Synopsis responses to ashley.brink@us.af.mil by 12:00pm CST on 27 Mar 2025. Title e-mail responses in the subject line of the e-mail as follows: Response to B-52H CERP Production Phase Sources Sought Synopsis #CERP-25-0001.


  1. Responses shall include the following information:

1. Company/Institute name


2. Address


3. Point of Contact


4. Cage Code


5. DUNS Number


6. Phone Number


7. E-mail Address


8. Web page URL



  1. All prospective contractors must be registered in the System for Award Management (SAM) database to be awarded a DoD contract.  The NAICS code for this requirement, if applicable to the company’s capabilities, should be included in the company’s NAICS code listing in SAM.


The North American Industry Classification System (NAICS) Code for this action is 336411, size standard 1,500 employees. Based on the NAICS Code, state whether your company qualifies as a:


a. Small Business (Yes/No)


b. Women Owned Small Business (Yes/No)


c. Economically Disadvantaged Small Business Women Owned Small Business (Yes/No)


d. 8(a) Certified (Yes/No)


            Date Certified:________________


e. HUB Zone Certified (Yes/No)


f. Veteran Owned Small Business (Yes/No)


g. Service Disabled Veteran Owned Small Business (Yes/No)


h. Statement as to whether your company is domestically or foreign owned (if foreign owned, please indicate country of ownership).



  1. Please limit your responses to no more than 35 pages, to include product sheets, test data, answers to the questions above; and identify a representative to support further Government inquiries and requests for clarification of the information provided, if needed. Marketing materials are considered an insufficient response to this Sources Sought Synopsis.


  1. Respondents should indicate which portions of their responses are proprietary and mark accordingly.  All information received in response to this SSS that is properly marked as “proprietary” will be handled accordingly.  Proprietary information must be clearly marked on the outside container and on the materials inside. The Government shall not be liable for, or suffer any consequential damages, for any proprietary information not properly identified.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS