Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on August 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

B027-11 Merimere Liner Replacement

Closed
B027-11State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 10 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 10 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The City of Meriden is soliciting bids for the rehabilitation of the Merimere Water Filtration Plant, specifically focusing on the liner and underdrain systems of its two lagoons. The scope of work includes the removal and disposal of the sand, sludge, filter fabric, and geomembrane layers, as well as the repair of the underdrain system and the reconstruction of the access ramp. The contractor is responsible for furnishing and installing geomembrane liners and cap material on a lump sum basis, ensuring the gravel base is properly compacted and formed according to the Engineer of Record's design drawings and CTDEEP compliance standards. To minimize plant downtime, the City prefers this work be completed in conjunction with the Lagoon Rebuild Project. This project is funded by the Environmental Protection Agency through Grant Number 00A02002, making it subject to stringent federal and state regulations. Key requirements include compliance with the Davis-Bacon and Related Acts for prevailing wages, the American Iron and Steel (AIS) and Build America, Buy America (BABA) domestic preference provisions, and various civil rights and nondiscrimination statutes. Bidders must provide a bid bond of 10 percent of the bid amount, and the successful awardee must furnish performance and payment bonds equal to the contract price. The contract will be awarded to the lowest responsible bidder who submits all required qualifications, insurance certificates, and certifications, including the Byrd Anti-Lobbying Certification for awards exceeding 100,000 dollars.

General Info

Bids for Meriden Water Filtration Plant lagoon liner and underdrain system rehabilitation project.

Place of Performance

CT, USA

Set-Aside

NONE

Documents

29

2007 Mer Lagoon Detail D1

PDF, High priority: read this first1 page · specifications
High

ATTACHMENT HH – Project Sign Guidelines

PDF, High priority: read this first2 pages · specifications
High

Attachment M - 2 CFR 200.216 Prohibition on Telecom/Video Surveillance

PDF, High priority: read this first7 pages · specifications
High

B027-11 Merimere Liner Replacement

PDF, High priority: read this first20 pages · itb
High

B027-11 Prevailing Wage Rates - Merimere Water Filtration Plant

PDF, High priority: read this first10 pages · wage-determination
High

D2 - Lagoon Detail Drawings

PDF, High priority: read this first1 page · specifications
High

DBRA Requirements for Contracts Over $100,000 Under EPA Grants

PDF, High priority: read this first5 pages · specifications
High

ITB #B027-11 Merimere Liner Replacement

PDF, High priority: read this firstitb
High

Merimere Dike Supplemental Conditions - Insurance Requirements (Aug 2026)

PDF, High priority: read this first5 pages · sow
High

Merimere Liner Replacement - Summary of Work

PDF, High priority: read this first7 pages · sow
High

Prevailing Wage Information Packet - CT Public Works Safety and Wage Law

PDF, High priority: read this first25 pages · wage-determination
High

Professional Services Agreement - City of Meriden 2025

PDF, High priority: read this first5 pages · contract-document
High

Sample Payment Bond Document

PDF, High priority: read this first2 pages · payment-bond
High

School Insurance Requirements

PDF, High priority: read this first1 page · insurance-requirements
High

2 CFR Part 1532 Subpart J - Clean Air Act/Clean Water Act Disqualification

PDF, Low priority11 pages · regulation
Low

Age Discrimination Act of 1975 - Attachment OO

PDF, Low priority6 pages · other
Low

Attachment LL - Executive Order 12549 Debarment and Suspension

PDF, Low priority2 pages · special-notice
Low

Attachment RR - Section 504 and Executive Order 12250

PDF, Low priority6 pages · other
Low

B02711 Merimere Liner Replacement Agreement

PDF, Low priority5 pages · contract-document
Low

CERT-141 Contractor’s Exempt Purchase Certificate

PDF, Low priority3 pages · tax-certificate
Low

EJCDC C-700 Standard General Conditions of the Construction Contract

PDF, Low priority90 pages · contract-document
Low

EPA AIS and BABA Requirements Memorandum (Mar. 20, 2014)

PDF, Low priority50 pages · memorandum
Low

Executive Order 16 – Violence in the Workplace Prevention Policy

PDF, Low priority3 pages · other
Low

Executive Order No. 17 - Connecticut employment service requirements

PDF, Low priority3 pages · special-notice
Low

Executive Order No. Three - Connecticut nondiscrimination in state contracts

PDF, Low priority6 pages · executive-order
Low

Federal Water Pollution Control Act Amendments of 1972 excerpt

PDF, Low priority7 pages · statute-excerpt
Low

Grant Award No. 00A02002 – Merimere Drinking Water Infrastructure Improvements

PDF, Low priority23 pages · award
Low

Sample Performance Bond

PDF, Low priority2 pages · performance-bond
Low

Title VI of the Civil Rights Act of 1964 - Attachment PP

PDF, Low priority6 pages · guidance
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → Water
Contacts2 people available
OfficeMeriden, CT, 06450, USA
Organization / AgencyConnecticut → Water
Office AddressMeriden, CT, 06450, USA
Contacts
Susan MartelContract Specialist
Rawle DummettProcurement

Interested Companies (16)

ConstructConnectCincinnati, OH
BlueWater EnviroLiningOklahoma City, Oklahoma
TradeMark ContractorsBristol, CT

See All 16 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The City of Meriden is looking to rehabilitate the Merimere Water Filtration Plant. The scope consists of removing and disposing of the sand/sludge layer, remove and repair the underdrain system for replacement, remove and reconstruct the access ramp, remove and dispose of the filter fabric, sand below and the geomembrane and assure the gravel base is compacted and formed with no washouts or significant divots. The Merimere Water Filtration Plant is a 1.2 MGD facility built in 1963 with lagoon improvements in 2002. The lagoons are showing signs of deterioration that compromise treatment performance and environmental compliance related to flows. The system consists of two lagoons, one about 5,300 ft 2, and the other about 7,500 ft 2. This contract will be funded by the Environmental Protection Agency, thus Federal Labor Standards Provisions, including the prevailing wage requirements of the Davis-Bacon and Related Acts will be enforced as applicable.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS