This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on August 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

B1043 Install Backup Generator

Closed
FA9401-26-R-0020Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
26-140 Installation of Emergency Shut Off Switches
Solicitation # 26-140
Solicitation 26-140 is a subcontracting opportunity with Atterbury Job Corps Center and Adams & Associates, Inc., operated for the U.S. Department of Labor. The project requires the installation of emergency shut-off switches on power tools within the Facility Engineering Storage/Maintenance Shop in Edinburgh, Indiana. Specifically, the contractor must provide and install two mushroom-head push-button emergency shut-off switches and a new 60A, 208/120V, 3-phase, 4-wire, 6-circuit branch circuit panel featuring a 60A shunt-trip main circuit breaker. All work must comply with FNC guidelines, OSHA and EPA regulations, and Indiana state and local codes. The procurement is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. A mandatory site visit was scheduled for November 10, 2026, with a proposal deadline of November 20, 2026. Bidders must submit a single lump sum contract bid on company letterhead, including a detailed cost breakdown, a timeline for completion, and proof of a valid Indiana Contractor's License. Award will be based on Best Value, evaluated across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Contractors are required to maintain comprehensive insurance, including General Liability of at least 1 million dollars per occurrence and Automobile Liability. Compliance with Davis-Bacon Act wage rates is mandatory. The contract includes Net 30 payment terms, and final payment is contingent upon the submission of certified payroll records, a completed SF 1413, and a release of liens. All workmanship is guaranteed for one year following the acknowledgment of substantial completion.
Atterbury Job Corps. – Adams & Associates

POSTED

about 9 hours ago

DEADLINE

in 22 days
NAICS: 238210
New
26-138 Main grounding electrode conductor is not provided
Solicitation # 26-138
Solicitation 26-138 is a subcontracting opportunity for the Atterbury Job Corps Center in Edinburgh, Indiana, operated by Adams and Associates. The project requires a licensed electrical contractor to correct grounding system deficiencies where the main grounding electrode conductor from incoming water pipes is not connected to service distribution panels. Specific technical requirements include installing a new #4AWG main grounding electrode conductor from the water main to the 200A service panelboard in the Storage Room, providing two supplemental 5/8 inch by 8 foot grounding electrodes connected via #6AWG bare copper conductor, and separating the ground bus from the neutral inside the distribution panel. All work must comply with NEC 2020, 250, as well as current EPA and OSHA regulations. The solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Interested bidders must attend a mandatory site visit on November 10, 2026, and submit a single lump sum bid with a detailed cost breakdown by November 20, 2026. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). Required submission documents include a Vendor Questionnaire, W9, proof of an Indiana Contractor's License, and certification of compliance with Davis Bacon Act wage rates. The successful contractor must start work within 14 days of the Notice to Proceed and provide proof of automobile liability and workers compensation insurance naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30, and the center is tax-exempt.
Atterbury Job Corps. – Adams & Associates

POSTED

about 9 hours ago

DEADLINE

in 22 days
NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: performing visual and infrared thermographic inspections to identify thermal anomalies, installing standardized external oil sampling devices for safer collection, and conducting comprehensive oil testing analysis. Additionally, the selected contractor will evaluate nitrogen blanket systems, provide operating pressure recommendations, and deliver on-site training and standard operating procedures to agency staff. All work must adhere to NETA MTS, IEEE, ASTM D923, and NFPA 70E safety protocols, with infrared inspections performed by ASNT Level 1 certified technicians or equivalent. The agency intends to make a single award to the most capable and cost-effective offeror. Evaluation criteria include a proven track record of at least two similar projects within the last five years, the proposed staffing plan, personnel availability, and the fee structure. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed company profile, project methodology, and required certifications such as a non-collusion statement and workers compensation certificate. The resulting contract will utilize fixed pricing with a not-to-exceed total cost, and payments will be processed electronically via ACH within 30 days of invoice approval.
Inland Empire Utilities Agency

POSTED

about 9 hours ago

DEADLINE

in about 2 months
NAICS: 238210
New
Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility
Solicitation # purified-water-replenishment-san-jacinto-valley-advanced-water-purification-facility-2
Axia Electric LLC is soliciting bids from SBE/DBE certified firms for the Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility Project for the Eastern Municipal Water District in California. The scope of work is divided between the San Jacinto Valley Advanced Water Purification Facility and Brine Ponds, specifically requesting subcontractors for low voltage systems, fiber optics, and electrical materials and supply. Bids must be submitted by 2:00 PM on November 18th, with a final bid date of November 19th at 10:00 AM. Quotes should be directed to lead estimator Ryan Falk. Qualified bidders must be registered to perform public work pursuant to Labor Code Sections 1725.5 and 1771.1 (a) and must agree to abide by the AGC Master Labor Agreements and the terms of Axia's Standard Long Form Subcontract or Purchase Order. Minimum insurance requirements include 1 million dollars for General Liability per occurrence, 2 million dollars for Aggregate and Completed Operations, 5 million dollars for Excess Liability, 1 million dollars for Auto Liability, and 1 million dollars for Workers Compensation and Employer Liability. Evaluation will prioritize SBE/DBE certification, though non-certified firms may provide lower-tier participation details for consideration.
Axia Electric

POSTED

about 9 hours ago

DEADLINE

in 21 days
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves inspecting, testing, repairing, and certifying emergency lighting systems across the facility, including specific areas such as the cafeteria, education building, recreation center, and men's and women's dormitories. The contractor is responsible for providing all labor, materials, and equipment to ensure compliance with NFPA 101 (2024 Edition), NFPA 70, and OSHA standards. Key deliverables include a full inventory of fixtures, functional testing via simulated power outages, the application of durable tracking labels to each fixture, integration of maintenance requirements into the operator's Computerized Maintenance Management System (CMMS), and the provision of hazardous material disposal certificates. The estimated contract value ranges from $25,000 to $100,000, with awards based on overall best value. Bidders must complete a mandatory physical site visit and submit their proposals by December 1, 2026. For bids of $25,000 or more, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. This opportunity is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone. Compliance requirements include adherence to the Davis-Bacon Act for prevailing wages, Federal Contractor Minimum Wage standards, and FAR regulations regarding debarment disclosure for subcontracts exceeding $45,000 and FFATA reporting for contracts of $40,000 or more.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Solicitation FA9401-26-R-0020 is a Firm Fixed Price, total small business set-aside contract for the design and installation of generator backup power for 377 ABW communication systems in building B1043 at Kirtland Air Force Base, New Mexico. The project encompasses a comprehensive scope of work including site planning, engineering design, utility design, and the installation of electrical services and generators, with a total performance period of 676 calendar days. The contractor is responsible for providing all materials, equipment, and supervision in strict compliance with New Mexico state, federal, and Kirtland AFB building codes, as well as Unified Facilities Guide Specifications and EM 385-1-1 safety standards. The award will be based on the Lowest Price Technically Acceptable (LPTA) methodology, requiring a pass rating in both technical approach and past performance before price is considered. Technical evaluation focuses on the design and construction management of continuous power for HVAC and communication systems, while past performance requires three relevant projects completed within the last seven years. Key personnel requirements include a dedicated Site Safety and Health Officer and a Superintendent with at least ten years of experience. Additionally, the contractor must comply with CMMC cybersecurity levels and DBIDS security clearance protocols for base access. Proposals are due by August 19, 2026, and must be submitted electronically to the designated contracting officials.

General Info

Small business FFP contract for generator backup power installation at Kirtland AFB.

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

0, NM, 87117, USA

Set-Aside

SBA

Documents

17

Amendment 0001 to Solicitation FA940126R0020

PDF, High priority: read this firstamendment
High

As-Built Guidance 2024

PDF, High priority: read this firstguidance
High

Attachment B - Kirtland AFB Low and Medium-Voltage Electrical Design and Equipment Requirements

PDF, High priority: read this firstspecifications
High

B1043 Install Backup Generator Q and A

PDF, High priority: read this firstq-and-a
High

Construction Cost Estimate Breakdown Form for Install Backup Generator MHMV 080079

PDF, High priority: read this firstcost-estimate-breakdown
High

Entry Authority List (EAL) for Free Zone in Hangar 1043

PDF, High priority: read this firstentry-authority-list
High

Evaluation Criteria for MHMV 080079 Install Backup Generator

PDF, High priority: read this firstevaluation-criteria
High

Front End Specifications - Free Zone and Airfield Waiver

PDF, High priority: read this firstspecifications
High

MHMV 080079 Design/Build Statement of Work for Backup Generator B1043

PDF, High priority: read this firstsow
High

Solicitation FA940126R0020 - Install Backup Generator at B1043

PDF, High priority: read this firstrfq
High

Wage Determination for Construction in Bernalillo County, NM

PDF, High priority: read this firstwage-determination
High

B1043 Install Backup Generator Site Visit Memo

PDF, Low priorityspecial-notice
Low

Backup Generator Photos

PDF, Low priorityother
Low

Backup Generator Room 8 (07.27.2026)

PDF, Low priorityother
Low

Blank Form for Contractors Proposal - Construction Cost Estimate Breakdown

XLSX, Low priorityother
Low

01a.+Attachment+A-Bldg1043_Floor+Plan.pdf

PDF

01c.+Attachment+C-EAL+Template+%28Wing+template%29.cfb

X-CFB

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Aug 12, 2026 to Aug 19, 2026. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9401 377 Msg Pk
Contacts2 people available
OfficeKIRTLAND AFB, NM, 87117-0001, USA
Office AddressKIRTLAND AFB, NM, 87117-0001, USA

Full Description

Show more

This project will be located on Kirtland Air Force Base (AFB), New Mexico. The primary goal of this project is to provide the installation of generator backup power to 377 ABW communication systems in B1043. The contractor shall furnish all services, materials, supplies, equipment, permits, investigation, studies,specifications, drawings and supervision as required in connection with the Statement of Work (SoW) for the design, ordering and installation of a successful completed project. All work shall be in strict compliance with all applicable codes as adopted and modified by the State of New Mexico, Federal and Kirtland AFB building codes.


Please review the Statement of Work(SoW) and other attachments for more information.



2026.07.27_Memo RE_2nd Site Visit


2026.07.31 Ammendment to solicitation due to the following updates:


  • Update to solicitation attachments. 
  • Update Question suspense date from 29 July 2026 to 04 August 2026. 
  • Update Response to Questions Post date from 05 August 2026 to 10 August 2026.
  • Update Proposal Submission date from 12 August 2026 to 19 August 2026.

10 August 2026: Update Q&A and Site Visit Photos

More opportunities from Department Of Defense → FA9401 377 Msg Pk

Same awarding agency

NAICS: 236220
New
Federal
Request for Qualification - MHMV230026 Construct Permanent Party Enlisted Dorm at Kirtland AFB, New Mexico
Solicitation # FA940127R0001
This Request for Qualification (RFQ) is for a Progressive Design-Build (PDB) project to replace existing dormitory buildings B20221 and B20202 at Kirtland Air Force Base, New Mexico. The scope involves the demolition of two multi-story structures and the construction of a new multi-story dormitory for Permanent Party Enlisted personnel (E1-E4), featuring 364 single-occupancy beds, associated utilities, parking, and landscaping. The project must adhere to Air Force standard designs, Unified Facility Criteria (UFC), and Air Force Corporate Facilities Standards. The estimated period of performance is 1,542 calendar days from the date of award. This procurement is executed as an Other Transaction (OT) agreement under 10 U.S.C. 2808a, making it exempt from the Federal Acquisition Regulation (FAR) and its supplements. The agreement is structured as a Firm Fixed Price (FFP) OTA, where the base period (Phase 1) covers preconstruction and design services, while the construction phase (Phase 2) will be negotiated as a Guaranteed Maximum Price (GMP) upon reaching design maturity. Award is based on a comparative analysis of quality and key personnel qualifications, though price for Phase 1 is required for evaluation of reasonableness. Offerors must submit Qualification Packages through the PIEE Solicitation Module by November 25, 2026. Submissions are limited to 15 pages and must include a technical approach, evidence of past relevant experience from the last 10 years, team composition, and a price proposal for Phase 1. Key requirements include compliance with the Davis-Bacon Act, Executive Order 13706 for paid sick leave, and the Buy American Act. The agreement also specifies liquidated damages of $10,154.86 per calendar day for unexcused delays.
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in 28 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS